• Title/Summary/Keyword: 작업 순서

Search Result 458, Processing Time 0.034 seconds

Study of Rate of Human Error by Workers in the Field based on Occupation (작업장 근로자의 직종별 Human Error 발생요인 연구)

  • Im Wan-Hee
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.9 no.4
    • /
    • pp.56-67
    • /
    • 2004
  • This study analyzes human error of workers performing simple repetitive tasks, and in order to prepare preventative measures, 486 people were used as subjects. The results of the study are like the following. First, the biggest cause of human error showed to be the worker himself in $77.8\%$ of the cases, machinery showed to be the cause in $16.3\%$ of the cases and management showed to be the cause in $6.0\%$ of the cases. The results show that most of the human error occurred due to the worker performing simple repetitive tasks and the human errors showed to be caused more by bad ergonomics and long hours rather than by problems with machinery. In addition, the area with the highest rate of human error showed to be the Human Information Processing System with Task Input Error being the highest with $46.9\%$, followed by Judgement and Memory Error with $36.4\%$ and Recognition Verification Error with $16.7\%$. Although fully automated tasks may reduce the rate of human error we must focus on lowering the rate of problems arising from spontaneous errors caused by workers performing simple repetitive tasks by continuously renewing plans and budgets in order to standardize tasks by incorporating cyclic positioning according to experience and positional exchange and by inspecting the workplace to increase efficiency of the workers.

  • PDF

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.

Study on improving method of arranging trapezoidal pre-cast segment lining in shield tunnel (쉴드터널의 사다리꼴 세그먼트라이닝 배열방법 개선에 대한 연구)

  • Kim, Jung-Hyun;Kang, Kyung-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.1
    • /
    • pp.1-18
    • /
    • 2007
  • This study is about an arrangement method of trapezoidal pre-cast segment lining that can be applied in shield tunnel construction. Trapezoidal segment lining is formed by assembling tapered pre-cast concrete segments taking advantage of the tapered shape of pre-cast segments upon delivery on site. By calculating tapering of the segments manufactured in single type and rotating the segments when putting them together, a variety of tunnel alignments can be arranged in the most efficient way. Once the design criteria and tunnel alignment (straight or curved) is analyzed, the sequence of assembling trapezoidal segments in compliance with tunnel alignment will be computed. On site an operator can utilize the softwareto automatically determine sequential arrangement of trapezoidal segments. When the actual arrangement of segmental lining is different from the computed output, the operator can input the actually measured values to coincide the computerized calculation with the real status of assembly. Then the adjustment will be the basis of subsequent arrangement of segments, thus the continuity of work can be guaranteed.

  • PDF

Simulated Annealing for Two-Agent Scheduling Problem with Exponential Job-Dependent Position-Based Learning Effects (작업별 위치기반 지수학습 효과를 갖는 2-에이전트 스케줄링 문제를 위한 시뮬레이티드 어닐링)

  • Choi, Jin Young
    • Journal of the Korea Society for Simulation
    • /
    • v.24 no.4
    • /
    • pp.77-88
    • /
    • 2015
  • In this paper, we consider a two-agent single-machine scheduling problem with exponential job-dependent position-based learning effects. The objective is to minimize the total weighted completion time of one agent with the restriction that the makespan of the other agent cannot exceed an upper bound. First, we propose a branch-and-bound algorithm by developing some dominance /feasibility properties and a lower bound to find an optimal solution. Second, we design an efficient simulated annealing (SA) algorithm to search a near optimal solution by considering six different SAs to generate initial solutions. We show the performance superiority of the suggested SA using a numerical experiment. Specifically, we verify that there is no significant difference in the performance of %errors between different considered SAs using the paired t-test. Furthermore, we testify that random generation method is better than the others for agent A, whereas the initial solution method for agent B did not affect the performance of %errors.

A Proposal to Construct a CAD System for the Preliminary Design of Ships (선박 초기설계용 전산시스템의 개발방안 연구)

  • Soon-Hung Han;Kyu-Yeul Lee;Dong-Kon Lee;Won-Soo Kang
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.30 no.2
    • /
    • pp.13-23
    • /
    • 1993
  • To utilize the fast developing computer technologies for the preliminary design of ships a software system is under development. This paper describes strategies and methods taken in the process. Three key elements are identified which should be well harmonized in the system. First one is the conventional CAE part which is made of separate naval architectural modules. Second one is the design methodology which studies design procedure and working methods of human designers. Third one is supporting technologies coming from the computing fields, which are necessary for the development of such a system. Based on the study about three key elements several strategies and methods for the system development have been specified. Also same findings made in this process are introduced.

  • PDF

Automated Generation of Word Balloons in Comics (만화 영상에서 말풍선의 자동 생성 방법)

  • Ryu, Dong-Sung;Chun, Bong-Kyung;Park, Kyu-Tae;Cho, Hwan-Gue
    • Journal of the Korea Computer Graphics Society
    • /
    • v.13 no.1
    • /
    • pp.33-36
    • /
    • 2007
  • Generally, word balloon have played a role to connect the script with character in comics. The location of word balloons depicts the process of story in comics, because they are located by reading order. Therefore, it is very Important works to generate and place word balloons, these work usually is processed manually by comic writer's. In this paper, we discuss the automated generation and placement of word balloon. For this, we modeled 6 kinds of word balloons. And these word balloons are placed by heuristic method based on EPFLP. We also generate the tail of word balloon automatically by considering the direction and reference points of word balloon.

  • PDF

Development of a Real-Time Position Tracking System for a Manufacturing Process Based on a UWB Sensor Using a Kalman Filter (칼만필터를 적용한 UWB 센서기반 제조업 조립공정작업의 실시간 위치추적 시스템 개발)

  • Jeong, Seung-Hyun;Choi, Deuk-Sung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.627-633
    • /
    • 2020
  • Assembly process data can be gathered in real time in a manufacturing execution system (MES) server using proximity sensors, barcodes, RFID, ZigBee, Bluetooth, wireless sensor networks, etc. Although this is suitable for identifying process flow and checking production progress, it is difficult to trace the location of individual workers in real time for missing work or trajectories within the work area. To overcome this, the location and trajectory of the working tool can be analyzed in real time through a position tracking system of an operator's working tool. It can instruct the operator to perform a consistent working process. Productivity and quality improvement can be achieved by an alarming or blocking operator with possible assembly defects during the assembly process in real time. To this end, we developed a real-time tool position-tracking sensor system based on Ultra Wide Band (UWB) trilateration using a Kalman filter to eliminate mechanical vibration and radio communication noise.

Ground Vibration Test of the Aircraft (항공기 지상진동 시험)

  • 유홍주;조창민;주영식;김광로
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1993.04a
    • /
    • pp.35-39
    • /
    • 1993
  • 항공기의 플러터 현상을 예방키 위한 개발시의 주요 공학적 임무로는 플러 터 해석, 풍동 플러터 시험, 실기체에 대한 지상진동시험 및 비행 플러터 시 험이 있다. 이들 업무는 군용 항공기의 경우에는 군사 규격서, 민간 항공기 의 경우는 FAR 규정 등에 항공기 개발 및 개조시에는 필히 수행토록 명시 되어 있으며, 특히 개발항공기의 인증을 받기 위해서는 초도 비행전까지 필 수적으로 완료되어야 하는 업무이다. 이중 항공기 지상진동시험은 개발항공 기의 초도 비행전에 실기체를 대상으로 하는 구조 동특성 규명시험으로써 플러터 해석 모델의 정확도를 입증하고 그 해석모델을 수정하거나 개선시키 는데 필요한 구조의 동특성 변수들을 실험적으로 규명하는 시험이다. 이 시 험은 개발된 항공기의 초도비행허가를 획득하고 비행속도제한을 설정키 위 해서 초도비행 직전에 초도 개발 비행기를 대상으로 필수적으로 수행되어야 하는 필수적 시험이다. 이에 따라 개발된 항공기의 전기체 지상진동시험을 수행하였고, 시험데이터의 모달해석을 하였다. 이 시험을 수행하기 위해 3개 의 가진기를 사용하였고, 모두 159개의 지점에서 주파수응답 함수를 얻었다. 최대 48 채널의 데이터 획득시스템을 사용하였으므로, 네번에 걸쳐 측정위치 를 옮겨 전체데이타를 획득하였다. 지상진동 시험의 최종해석 결과는 유한요 소 모델의 유효성을 검토하는데 사용되었고, 시험 데이타를 이용한 가진응답 해석(Forced Response Analysis)을 통하여 비행플러터 시험시에 사용되는 플러터 가진기의 위치선정 및 가진력의 크기를 결정하는데 이용하였다.ncy)가 저주 파수대로 천이(Lower Shift)하는 현상이 나타났으며, 일정한 작업량이라도 작업중량을 줄이고 작업 빈도를 높여서 작업할 경우에 이러한 현상이 더욱 두드러졌다. 작업시간의 경과에 따른 MVIS의 감소 현상은 작업빈도가 높고 비대칭형 작업일 때 가장 크게 나타났다. 총손실을 줄이고, 상대적 비용절감효과를 갖게할 수 있다고 하였다. 따라서 본 연구에서는 성인 여성기성복의 치수적합성을 높이기위하여 출산 후 중년에 접어 들면서 체형이 변화되는 것을 고려하여 연령을 분류하고(18세-34세, 30세-51세), 각 연령 집단에 따른 체형을 각각 3가지로 분류하였다. 이에 따라 의복 생산시의 총손실을 줄이기위한 상의, 하의생산시 필요한 부위별 최적규격치 간격을 제시하였다.적인 기능으로 보여지는 것에 좁혀서 작업능력의 연령증가 변화에 대하여다원적 평가를 하는 것이 실제적이라고 할 수 있다. 따라서 본 연구에서는 인간이 가지고 있는 다수의 기능중에서 수지교 치성과 연령증가와의 관계를 조사한다. 만약 연령증가 만으로 수지교치성을 평가 할 수 없는 경우에는 어떠한 요인이 수지기민성의 변화에 영향을 미치는가를 검토한다.t list)에서 자동적으로 사건들의 순서가 결정되도록 확장하였으며, 설비 제어방식에 있어서도 FIFO, LIFO, 우선 순위 방식등을 선택할 수 있도록 확장하였다. SIMPLE는 자료구조 및 프로그램이 공개되어 있으므로 프로그래머가 원하는 기능을 쉽게 추가할 수 있는 장점도 있다. 아울러 SMPLE에서 새로이 추가된 자료구조와 함수 및 설비제어 방식등을 활용하여 실제 중형급 시스

  • PDF

A Research on the Job Analysis of the Principal of Vocation High School using DACUM Method (데이컴(DACUM) 기법을 활용한 직업계고등학교 학교장의 직무 분석)

  • Hyun, Su
    • 대한공업교육학회지
    • /
    • v.44 no.1
    • /
    • pp.114-140
    • /
    • 2019
  • The purpose of this research is to analyze a principal's job at a Vocational High School using DACUM Task Analysis Method. The contents of this research are to set the order after deriving the duties and tasks of the principal., then to verify as the importance, difficulty, and frequency of each task, and also to indicate whether it is an essential capability to have in the early stages of one's duty. Finally, based on the job analysis results, a DACUM chart was developed by the principal of the Vocational High School. The DACUM Task Analysis Workshop was attended by one DACUM analyst with LEVEL - 1 license, seven DACUM members with more than four years experience, one secretary and two administrative assistants for a two-day period. The results of the research are as follows; First, the Vocational High School Principal is defined as a school administrator who operate the vocational education curriculum of in the specialized and customized high schools of industrial demand development and the job area. The analysis derived 11 duties and 95 tasks of the Principal. Second, the importance, difficulties, and frequency of each task were divided respectively into high (A), moderate (B), and low (C), and the consensus of the experts was made to determine whether the core capabilities are acquired early on the job. Third, based on the analysis results, a DACUM Task Analysis chart of the Vocational High School principals was presented. In addition, while engaged on the job of the vocational high school principal, a list of 49 general knowledge and abilities, 16 tools, Integrated data and fixtures are required. Along with 28 attitudes 33 future prospects and characteristics of the Vocational High School principal was presented.

연구개발투자의 산업간 파급효과

  • 김정우;이희경
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1995.09a
    • /
    • pp.144-155
    • /
    • 1995
  • 본 연구는 기술에 대한 대용개념으로 사용되고 있는 연구개발투자의 효과가 산업의 생산성 향상에 얼마만큼 기여하고 있는가에 관한 실증연구로, 그 효 과를 자체 연구개발효과와 파급효과로 나누어 측정하는 데 목적이 있다. 파 급효과의 경우, 중간재의 거래를 통한 체화된 파급효과와 산업간의 기술거리 로 인한 비체화된 파급효과로 나누어 한국 제조산업을 18개로 분류한 후 각 산업의 연구개발스톡을 측정하였으며, 연구개발투자의 체화된 파급효과 측정 을 위하여 산업 연관표를 이용하여 가중치를 계산하였다. 그리고, 비체화된 파급효과 측정을 위하여는 각 산업에서 고용하고 있는 전공별 연구원 수의 자료를 이용 기술거리를 구하였다. 본 연구에서는 각각의 가중치로 구한 연 구개발스톡, 체화된 연구개발 스톡, 그리고 비체화된 연구개발 스톡을 이용 하여 각 독립변수들에 대한 한계생산성을 구하였으며, 분석 방법으로는 단순 회귀분석과 함께 시계열의 효과와 산업간 효과를 고려하는 패널데이터 분석 을 시도하였다. 체화된 파급효과와 비체화된 파급효과 중 하나만을 변수로 포함하는 경우에는 추정치가 유의한 결과를 나타내고 있지만, 두 가지의 변 수를 모두 포함하는 경우에는 보호도 일정하지 않으며 비유의적인 결과를 보였다. 이러한 결과는 다중공선성에 의한 것으로 보인다. 두 가지 파급효과 에 대한 한계생산성 추정치는 기술과 연구개발투자가 외부성을 가지고 있으 며, 기술과 관련된 변수의 도입이 필요함을 시사한다. 또한 이러한 파급효과 의 추정치는 거시차원에서 연구개발 지원의 정당성에 대한 근거를 제시하고 있으며, 기술혁신을 위한 투자의 타당성을 실증적으로 보여주고 있다.사하였다. 이 사례 연구들의 결과는 각 계열사들의 상황에 따라 제시된 외주위탁 전략과 현재의 외주위 탁 전략이 일치할 때 정보 시스템에 대한 사용자 만족도가 보다 높은 것으 로 나타났다. 할 수 있는 효율적인 distributed system를 개발하는 것을 제시하였다. 본 논문은 데이타베이스론의 입장에서 아직 정립되어 있지 않은 분산 환경하에서의 관계형 데이타베이스의 데이타관리의 분류체계를 나름대로 정립하였다는데 그 의의가 있다. 또한 이것의 응용은 현재 분산데이타베이스 구축에 있어 나타나는 기술적인 문제점들을 어느정도 보완할 수 있다는 점에서 그 중요성이 있다.ence of a small(IxEpc),hot(Tex> SOK) core which contains two tempegatlue peaks at -15" east and north of MDS. The column density of HCaN is (1-3):n1014cm-2. Column density at distant position from MD5 is larger than that in the (:entral region. We have deduced that this hot-core has a mass of 10sR1 which i:s about an order of magnitude larger those obtained by previous studies.previous studies.업순서들의 상관관계를 고려하여 보다 개선된 해를 구하기 위한 연구가 요구된다. 또한, 준비작업비용을 발생시키는 작업장의 작업순서결정에 대해서도 연구를 행하여, 보완작업비용과 준비비용을

  • PDF