• Title/Summary/Keyword: 작업흐름 관리

Search Result 168, Processing Time 0.024 seconds

The Analysis of Current Daily-Report System and The Proposal of Improvement Framework (작업일보 현황 분석에 따른 개선방향 제시)

  • Kim Bong-nyoun;Kim Chang-Duk;Ee Hyun-Soo;Kim Sun-Kuk;Seo Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.66-73
    • /
    • 2003
  • Building construction projects are performed by a number of sub-contractors specialized in diverse trades. Therefore information management among these constituents is quite challenging especially due to exponentially increasing manpower and material resources. In recognition of the importance of information management in project sites a number of systems have been suggested, but the application is limited one of the main reason is that general contractors use these systems and sub-contractor's participation understanding and financial ability are limited. Besides other problems such as loss along communication channel, distortion of information due to inefficient input device and tremendous amount of time and labor are required for collection analysis, and management of information to prepare a daily-report. Therefore the Purpose of this study is to improve reporting process through analyzing current daily reporting system. This paper also suggests the direction of the improved daily reporting system to enhance the performance of construction projects through incorporating sub-contractor's participation in daily reporting system.

Design of Mobile Agent System for Efficient Multiple Reply among the Members in Integrated Manufacture/Logistics Network (통합된 제조/물류 망에서 구성원간 효율적 다중 응답을 위한 이동 에이전트 시스템 설계)

  • Kim, Kwang-Jong;Ko, Hyun;Lee, Yon-Sik
    • 한국HCI학회:학술대회논문집
    • /
    • 2006.02a
    • /
    • pp.1298-1304
    • /
    • 2006
  • 공급체인관리(Supply Chain Management)는 단순히 물질의 흐름관리뿐만 아니라 제품의 생산, 공급, 유통 등 다양하고 복잡한 활동들의 물질 및 정보 흐름의 통합이라고 할 수 있다. 그러므로 각 구성원간의 긴밀한 협력과 공동작업을 위해서는 원활한 정보 수집 및 응답이 요구된다. 하지만 기존 시스템은 비이동성 에이전트 개념으로 네트워크의 오버헤드나 혹은 접속 단절 상황에서 작업 수행이 불가능하여 구성원간의 정보 수집과 응답이 실제 업무 처리에 지연이 발생되므로 생산에서 판매까지의 리드타임이 길어지게 되고 채찍효과(Bullwhip Effect)가 더욱 크게 나타난다. 따라서 본 논문에서는 구성원간 협력과 공동작업을 위해 효율적으로 처리되어야 할 정보 수집 및 응답을 대상으로 하는 효율적 다중 응답을 위한 이동 에이전트 시스템을 설계한다. 제안시스템은 기존 시스템의 문제 해결을 위해 이동 에이전트와 객체 복제 메커니즘을 제시하며, 또한 각 구성원 시스템의 투명성을 위해 네이밍 서비스의 구성 방법과 등록된 구성원 시스템 객체의 객체 참조자 정보에 따라 복제된 이동 에이전트가 각 구성원 시스템으로 이주하는 이주 방식과 이주 후, 개별적인 작업 수행 결과를 해당 각 구성원 시스템에 제공하는 다중 응답 시나리오를 제시한다.

  • PDF

A Plan for Better Productivity of Sub-Contractors through Improvements of Daily Reporting Process (작업일보 작성프로세스 개선을 통한 협력업체 생산성 향상방안에 관한 연구)

  • Kim Bong-Nyoun;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.375-378
    • /
    • 2002
  • Most construction works in a building site are progressed by many work categories and sub-contractors. Therefore there are many difficult things of management of construction-information because variable occurrences are happened to manpower and material resources. For this reason, various management systems are suggested, but the application of these systems are difficult because only construction company manages these systems and sub-contractor's participation, understanding and financial ability are insufficient. In addition to that, there are other problems such as lost information when it is carried, perversion and distrust of information by hand and lots of time and labor are necessary for collection, analysis, and management of information which are offered for daily report. so the purpose of this study is for improvement of reporting process with making an analysis of productivity effects and an analysis of function and problem of daily report. I intend to suggest the direction of improved daily report system for better productivity of construction work through input information and management of cooperation enterprises.

  • PDF

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.

Projection of Activity Duration Utilizing Historical Cost Data (자원투입 비용을 고려한 공정관리 작업기간 산정)

  • Moon, Sung-Woo;Kang, Sang-Rae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.444-447
    • /
    • 2006
  • Construction managers need to pay a close attention to the resource utilization in order to deliver the construction project successfully. Construction scheduling is crucial for resource control in that it provides information when and how much to bring down work force to sites. In scheduling, activity duration is projected based on the productivity of historical data or the intuition of scheduler. This paper studies the opportunity of applying cost-based productivity for estimating activity duration. For cost-based productivity, the cost of resource is used as an input and the work quantities as an output. Out of historical data, regression model has been developed to understand the validity of applying cost-based productivity in projecting activity duration. The result of study will work as a prerequisite for implementing the environment of database-based construction scheduling.

  • PDF

Evaluation of Biological Critical Control Points Using Escherichia coli Genotyping (Escherichia coli Genotype을 이용한 생물학적 Critical Control Point의 적합성 평가)

  • Kim, Hak-Jae;Hahn, Tae-Wook;Juong, Ji-Hun;Bahk, Gyung-Jin;Hong, Chong-Hae
    • Food Science of Animal Resources
    • /
    • v.29 no.6
    • /
    • pp.695-701
    • /
    • 2009
  • This study was performed to evaluate the effectiveness of biological critical control points using the genetic profile of Escherichia coli isolates from pork cutting plants. Samples were collected from carcasses, equipment (knife, table, glove, transport belt, boning and skinning machine), the environment (wall and floor), and meat cuts during the cutting process from two plants. Pulsed-field gel electrophoresis (PFGE) was used to characterize the E. coli isolates. An identical genotype was detected from the carcasses, equipment, environment, and final meat cuts, and showed that the incoming carcasses, which were contaminated during transportation from slaughterhouses, were a major source of E. coli that was spread throughout processing. Also, consistent cross-contamination due to improper cleaning and disinfection procedures was another possibility. As a result, incoming carcasses and cleaning procedures should be considered critical control points in pork cutting plants, since a heating step is not used to inactivate microorganisms. Furthermore, the high rate (59.6%) of E. coli isolation indicates E. coli can be a good indicator in livestock processing plants even though it has genetic diversity.

A Development of Offshore plant Piping Process Monitoring System Based on 3D CAD Model (3D CAD 모델 기반 해양플랜트 배관 공정 모니터링 시스템 개발)

  • Kim, Hyun-Cheol;Lee, Gyu-Hong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.2
    • /
    • pp.58-65
    • /
    • 2020
  • 3D Models of offshore plant piping materials designed by 3D CAD systems are provided to the production processes in the form of 2D piping drawings and 2D piping installation drawings. In addition to the standard engineering information, the purchasing, procurement, manufacturing, installation, and inspection of raw materials are managed systematically in an integrated process control system. The existing integrated process management system can help reduce the processing time by managing the flow and progress of resources systematically, but it does not include 3D design model information. Hence, it is difficult to understand complicated pipe structures before installing the pipe. In addition, when design changes or immediate design modifications are required, it is difficult to find related data or exchange information quickly with each other. To solve this problem, an offshore plant-piping process-monitoring system was developed based on a 3D model. The 3D model-based piping monitoring system is based on Visual Studio 2017 C# and UNITY3D so that the piping-process work information can be linked to the 3D CAD model in real time. In addition, the 3D model could check the progress of the pipe installation process, such as block, size, and material, and the progress of functional inspection items, such as cleaning, hydraulic inspection, and pneumatic inspection.

A Study for Enhancing the Efficiency of Managing Water supply and Drainage System For Municipal Goverments Using Mobile GIS Techniques (Mobile GIS기술을 이용한 지자체 상하수도 업무효율성 분석)

  • 우제윤;구지희;장성현;이준우
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2004.03a
    • /
    • pp.189-194
    • /
    • 2004
  • 최근 정보통신기술의 급속한 발전은 Mobile 기반의 GIS 구현 및 활용을 가능하게 하였다. 현재 지자체 상하수도관리업무는 현장작업(외업)과 실내작업(내업)이 혼합되어 있으며, 시설물 관리 및 공사감독 업무의 경우 현장작업과 실내업무가 같은 연장선상에 있어 기존 업무흐름체계로는 업무를 이중으로 처리하여야 하는 문제점이 있다. 이러한 문제점은 데이터의 오류 및 중복업무에 따른 업무가중을 초래하여 업무효율성 제고에 영향을 미친다. 본 연구에서는 이러한 문제점의 해결방안을 찾고자 경기도 고양시를 연구 대상지역으로 하여, Mobile GIS를 기반으로 한 상하수도 관리업무의 효율적인 지원방안을 연구하였고, 그에 따른 효율성을 정량적으로 분석하였다.

  • PDF

The flow of Temporary Facility Planning Information in High-rise Building Construction (고층건축공사에서의 가설계획 정보흐름)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.91-96
    • /
    • 2002
  • The purpose of this study is to present a systemized flow of temporary facility(TF) planning information. The current TF planning tends to be established by subjective decision making of field workers. Therefore TF planning needs more systemized information flow to provide a reliable schedule. The study was implemented through interview with experts for reliable TF planning. The main contents of the study are as follows; 1) TF planning process model(IDEF0) are established. 2) Various information flow diagrams proposed to support TF planning decision-making. The study recommends that, as a future research, the computer system be developed for application of the information flow.

TACT Scheduling & Monitoring of Apartment Finish Works based on the BDM Technique (BDM기법을 적용한 공동주택 마감공사 TACT공정계획 수립 및 운영)

  • Kim, Seon-Gyoo;Yoo, Jae-Woo;Kim, Dong-Sub;Park, Jong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.3-11
    • /
    • 2014
  • As the recent construction projects have been carried out as a mixed-use complex project that includes architecture, civil, mechanical, electrical, and landscape, as well as become bigger and high-rise with the increased repetitive works, the TACT technique has received more attention as an effective method for achieving a target completion date by securing the continuous works. Although the TACT technique can maintain a steady flow without the interruption of works in order to utilize the resources of the repetitive works, it can not be considered as the systematic scheduling technique because the schedule computations are not possible as well as a critical path can not be recognized. This paper proposes the applicabilities of scheduling and monitoring the TACT schedule by the BDM technique as comparing and analyzing the methodologies for apartment finish works by the Excel, the Primavera(P6) based on the PDM technique, and the Beeliner based on the BDM technique that is a new networking technique, respectively.