1 |
H. C. Kim, J. M. Kim, "Development and Working Efficiency of Supporting Program for the Parametric Electrical Outfit Production Design of Offshore Plant Based on PML", Journal of Ocean Engineering and Technology, Vol.33, No.3, pp.205-213, 2019. DOI: https://doi.org/10.26748/KSOE.2018.089
|
2 |
D. K. Ham, M. G. Back, J. G. Park, J. H. Woo, "A Study of Piping Leadtime Forecast in Offshore Plant's Outfittings Procurement Management", Journal of the Society of Naval Architecture, Vol.53, No.1, pp.29-36, 2016. DOI: https://doi.org/10.3744/SNAK.2016.53.1.29
|
3 |
J. G. Park, J. H. Woo, "A Study of Process Management Method of Offshore Plant Piping Material", Journal of the Society of Naval Architecture, Vol.55, No.2, pp.124-135, 2018. DOI: https://doi.org/10.3744/SNAK.2018.55.2.124
|
4 |
AVEVA, "AVEVA(12.1) PML PLant & Marine TM-1401", Training Guide, 2013.
|
5 |
Samsung Heavy Industries(SHI), "Piping Work Management System and Method", Patent application number 10-2015-0087612, Korean Intellectual Property Office, 2015.
|
6 |
NAVISWORKS, https://www.autodesk.co.kr/products/navisworks/overvie (accessed Oct. 21, 2019)
|
7 |
W. Yan, "Automatic generation of assembly sequence of the planning of outfitting processes in shipbuilding", Journal of Ship Production and Design, Vol.28, No.2, pp.49-59, 2012. DOI: https://doi.org/10.5957/JSPD.28.2.120002
|
8 |
Daewoo Shipbuilding & Marine Engineering(DSME), "Method of validation check for piping 2D & 3D information", Patent application number 10-2015-0012344, Korean Intellectual Property Office, 2015.
|
9 |
G. H. Lee, "3D Simulation and Monitoring System and Method for Manufacturing Process Management of Offshore Plant", Patent application number 10-2017-0101698, Korean Intellectual Property Office, 2017.
|
10 |
UNITY3D, https://unity3d.com/get-unity/download (accessed Oct. 21, 2019)
|