• Title/Summary/Keyword: 작업지표

Search Result 396, Processing Time 0.02 seconds

Development of Occupational Therapist Competency Indicators for Occupation-Based Intervention: Delphi Study (작업기반 중재를 위한 작업치료사 역량지표 개발: 델파이연구)

  • Shin, Jae-Yong;Kim, Jung-Ran;Lee, Ji-Sun
    • Therapeutic Science for Rehabilitation
    • /
    • v.7 no.1
    • /
    • pp.37-50
    • /
    • 2018
  • Objective : The purpose of this study was to develop a competency indicators of occupational therapists for occupation-based intervention by conducting a Delphi survey to occupation-based intervention experts. Methods : After analyzing the data related to occupational therapists indicators in korea, the results of Delphi survey were collected three times from October to December 2016. Based on the results, we developed occupational therapists competency indicators for occupation-based intervention through expert panel's opinions. Results : Based on the eight competency elements, the competency indicators were examined by 133 primary and 133 secondary competency indicators. Finally, 131 competency indicators were developed based on 8 components as occupational therapist competence indicators for occupation-based intervention. The results of the third delphi showed a high level of content validity of .95, stability of .10, convergence of 0, and consensus of 1. Conclusion : The developed occupational therapist competence indicators for occupation-based intervention could be used in various clinical decision making such as occupation-based intervention, education training, education development and evaluation.

Statistical Analysis of Work Performance Indicator (작업 성과지표의 통계적 분석 방법에 관한 연구)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.947-952
    • /
    • 2007
  • The construction project is composed of individual trade which is consists of each activity. and the performance of each activity is the lowest level to influence the project performance. Consequently, It is essential to measure and evaluate the performance of the each assignment. But the existing performance measurement have mainly focussed on company level and project level. Therefore, this paper select PPC as the indicator of a activity and, suggests the analysis method of indicators for a goal-oriented management and continuous improvement through a statistical control techniques.

  • PDF

A study of the Performance Measurement Based on Lean Construction (린 건설에 기초한 성과측정 방안에 관한 연구)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.492-495
    • /
    • 2006
  • The performance measurement has been taken with the transformation concept of production, which is considered to be a major cause of existing problems. In order to improving productivity, it is argued that the performance measurement based on Lean Construction is necessary. This study suggests new performance measurement indicators based on work flow ; Reliability, Effectiveness, Efficiency.

  • PDF

Development of a Workload Assessment Index Based on Analyzing Driving Patterns (운전자 주행패턴을 반영한 작업부하 평가지표 개발)

  • KIM, Yunjong;LEE, Seolyoung;CHOI, Saerona;OH, Cheol
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.6
    • /
    • pp.545-556
    • /
    • 2017
  • Various assessment indexes have been developed and utilized to evaluate the driver workload. However, existing workload assessment indexes do not fully reflect driving habits and driving patterns of individual drivers. In addition, there exists significant differences in the amount of workload experienced by a driver and the ability to overcome the driver's workload. To overcome these limitations associated with existing indexes, this study has developed a novel workload assessment index to reflect an individual driver's driving pattern. An average of the absolute values of the steering velocity for each driver are set as a threshold value in order to reflect the driving patterns of individual drivers. Further, the sum of the areas of the steering velocities exceeding the threshold value, which is defined as erratic steering area (ESA) in this study, was quantified. The developed ESA index is applied in evaluating the driver workload of manually driven vehicles in automated vehicle platooning environments. Driving simulation experiments are conducted to collect drivers' responsive behavior data which are used for exploring the relationship between the NASA-TLX score and the ESA by the correlation analysis. As a result, ESA is found to have the greatest correlation with the NASA-TLX score among the various driver workload evaluation indexes in the lane change scenario, confirming the usefulness of ESA.

Performance Evaluation of Truck Haulage Operations in an Underground Mine using GMG's Time Usage Model and Key Performance Indicators (GMG 시간 사용 모델 및 핵심성과지표를 이용한 지하 광산 트럭 운반 작업 성능 평가)

  • Park, Sebeom;Choi, Yosoon
    • Tunnel and Underground Space
    • /
    • v.32 no.4
    • /
    • pp.254-271
    • /
    • 2022
  • The performance of truck haulage operations in an underground mine was evaluated using the time usage model and key performance indicators (KPIs) proposed by Global Mining Guidelines Group (GMG). An underground mine that mainly produces iron and titanium iron was selected as a study area, and truck haulage data were collected using Bluetooth beacons and tablet PCs. The collected data were analyzed to identify unit operations, activities, events, and required time of truck haulage operations, and time categories were classified based on the time usage model. The performance of the haulage operations was evaluated using nine indicators in terms of availability, utilization, and effectiveness. As a result, in terms of availability, uptime was 33.9%, physical availability was 95.7%, and mechanical availability was 94.9%. In the case of utilization, use of availability was 83.1%, asset utilization was 28.1%, and operating and effective utilization were 79.6% and 77.7%, respectively. Also, in terms of efficiency, operating efficiency was high at 97.6%, and production effectiveness was found to be 49%.

Development of Work Report for Evaluating KPIs of Truck Haulage Operation in Open Pit and Underground Mines (노천 및 지하 광산 트럭 운반 작업의 핵심성과지표 평가를 위한 작업 일지 개발)

  • Park, Sebeom;Choi, Yosoon
    • Tunnel and Underground Space
    • /
    • v.32 no.5
    • /
    • pp.327-343
    • /
    • 2022
  • The standard work report for trucks was developed that records data on truck haulage operations in open-pit and underground mines, and to evaluate the performance of haulage operations. Work reports used in 5 mines in Korea was secured and analyzed, and items to be included in the standard work report were determined. By analyzing the formulas for key performance indicators (KPIs) proposed by the Global Mining Guidelines Group (GMG), it was possible to determine how to record time-related data. After selecting a limestone underground mine as a research area, the performance of haulage operations was evaluated using a standard work report. As a result, in terms of truck availability, uptime was 46.7%, and both physical and mechanical availability were 100%. In the case of utilization, use of availability was 88.2%, the asset utilization was 41.1%, and operating and effective utilization were 88.2% and 79.2%, respectively. Also, in terms of efficiency, operating efficiency was found to be 89.9%.

Case Study of Workload Distribution Index for RTGC in Container Terminal Yard (컨테이너 터미널의 RTGC작업 분산지표 적용연구 - H사를 중심으로 -)

  • Shin, Chang-Hoon;Park, Jong-Won;Kwon, Min-Kyun;Shin, Jae-Young
    • Journal of Navigation and Port Research
    • /
    • v.41 no.4
    • /
    • pp.229-234
    • /
    • 2017
  • Container terminal yards operate under a high degree of uncertainty as the contact point between inbound and outbound operations of vessels and external trucks. The layout, equipment operations. and job orders at the yards determine the efficacy and delays of the work, so many studies have investigated improvements in efficiency. H company, a container terminal operator developed an index called WDI to distribute work among RTGCs. The WDI is an indicator to prevent congestion in one place by equally distributing the work to each RTGC. This paper analyzes the effect of the WDI introduction and discusses the causes and results of the WDI introduction effect from quantitative and qualitative perspectives.

Scheduling System using CSP leer Effective Assignment of Repair Warrant Job (효율적인 A/S작업 배정을 위한 CSP기반의 스케줄링 시스템)

  • 심명수;조근식
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2000.11a
    • /
    • pp.247-256
    • /
    • 2000
  • 오늘날의 기업은 상품을 판매하는 것 뿐만 아니라 기업의 신용과 이미지를 위해 그 상품에 대한 사후처리(After Service) 업무에 많은 투자를 하고 있다. 이러한 양질의 사후서비스를 고객에게 공급하기 위해서는 많은 인력을 합리적으로 관리해야 하고 요청되는 고장수리 서비스 업무를 빠르게 해결하기 위해서는 업무를 인력들에게 합리적으로 배정을 하고 회사의 비용을 최소화하면서 정해진 시간에 요청된 작업을 처리하기 위해서는 인력들에게 작업을 배정하고 스케줄링하는 문제가 발생된다. 본 논문에서는 이러한 문제를 해결하기 위해 화학계기의 A/S 작업을 인력에게 합리적으로 배정하는 스케줄링 시스템에 관한 연구이다. 먼저 스케줄링 모델을 HP 사의 화학분석 및 시스템을 판매, 유지보수 해 주는 "영진과학(주)"회사의 작업 스케줄을 분석하여 필요한 도메인과 고객서비스전략과 인력관리전략에서 제약조건을 추출하였고 여기에 스케줄링 문제를 해결하기 위한 방법으로 제약만족문제(CSP) 해결기법인 도메인 여과기법을 적용하였다. 도메인 여과기법은 제약조건에 의해 변수가 갖는 도메인의 불필요한 부분을 여과하는 것으로 제약조건과 관련되어 있는 변수의 도메인이 축소되는 것이다. 또한, 스케줄링을 하는데에 있어서 비용적인 측면에서의 스케줄링방법과 고객 만족도에서의 스케줄링 방법을 비교하여 가장 이상적인 해를 찾는데 트래이드오프(Trade-off)를 이용하여 최적의 해를 구했으며 실험을 통해 인력에게 더욱 효율적으로 작업들을 배정 할 수 있었고 또한, 정해진 시간에 많은 작업을 처리 할 수 있었으며 작업을 처리하는데 있어 소요되는 비용을 감소하는 결과를 얻을 수 있었다. 검증하였다.를, 지지도(support), 신뢰도(confidence), 리프트(lift), 컨빅션(conviction)등의 관계를 통해 다양한 방법으로 모색해본다. 이 연구에서 제안하는 이러한 개념계층상의 흥미로운 부분의 탐색은, 전자 상거래에서의 CRM(Customer Relationship Management)나 틈새시장(niche market) 마케팅 등에 적용가능하리라 여겨진다.선의 효과가 나타났다. 표본기업들을 훈련과 시험용으로 구분하여 분석한 결과는 전체적으로 재무/비재무적 지표를 고려한 인공신경망기법의 예측적중률이 높은 것으로 나타났다. 즉, 로지스틱회귀 분석의 재무적 지표모형은 훈련, 시험용이 84.45%, 85.10%인 반면, 재무/비재무적 지표모형은 84.45%, 85.08%로서 거의 동일한 예측적중률을 가졌으나 인공신경망기법 분석에서는 재무적 지표모형이 92.23%, 85.10%인 반면, 재무/비재무적 지표모형에서는 91.12%, 88.06%로서 향상된 예측적중률을 나타내었다.ting LMS according to increasing the step-size parameter $\mu$ in the experimentally computed. learning curve. Also we find that convergence speed of proposed algorithm is increased by (B+1) time proportional to B which B is the number of recycled data buffer without complexity

  • PDF

A Study on the Development of Sensory Integration Intervention Competency Model for Occupational Therapist (감각통합중재를 위한 작업치료사 역량모델 개발 연구)

  • Namkung, Young;Kim, Kyeong-Mi;Kim, Misun;Lee, Jiyoung
    • The Journal of Korean Academy of Sensory Integration
    • /
    • v.15 no.2
    • /
    • pp.22-34
    • /
    • 2017
  • Objective : The purpose of this study was to draw up sensory integration intervention competency model for occupational therapist and was to confirm a competency model through validation. Methods : We conducted literature review, expert opening survey, and expert focus meeting to draw up draft competency model. And then, we carried out Delphi survey twice and consulted an expert to confirm the sensory integration intervention competency model for occupational therapist. Results : The sensory integration intervention competency model for occupational therapist developed in this study was structured into 4 competency cluster, 15 competency, 60 competency indicators. 4 competency clusters had expertise, professionalism, interpersonal skills, and personal characteristics. Conclusion : The competency model revealed in this study can be used as basic critical data to foster development of competency based curriculum of Korean Academy of Sensory Integration (KASI).

Applying rework indicator to control software development project (소프트웨어 개발 프로젝트 제어를 위한 재작업 지표의 적용)

  • Han Hyuk-Soo;Kim Han-Saem
    • The KIPS Transactions:PartD
    • /
    • v.13D no.1 s.104
    • /
    • pp.61-66
    • /
    • 2006
  • It is reported that the success ratio of software development projects has been only 30%. Many causes lower project's chance of success, particularly lack of systematic project management. Especially, moving on the next phase of project with unsatisfactory outputs can be very problematic because it can cause much waste of resource, time and even lead to the failure of the whole project. Peer review and inspection are some of the practices designed to prevent such waste and possible failure. When defects are identified through such progress, each developer has to work on the product component again and fix the problem. This process is called rework. In this paper, we propose a method for improving quality of reworked product component to prevent excessive cost and time consumed caused by moving on the next phase of a project with a problematic product component. More specifically, this paper suggests a rework indicator that measures the level of rework based on its complexity and severity and is used to choose appropriate checking method on reworked product component. The research also confirmed the method's usefulness and effectiveness by applying the suggested method on four projects.