A Study on Material Requirement Planning by Integrating Schedule and Cost (비용$\cdot$일정 통합관리를 이용한 자원소요계획에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.106-113
    • /
    • 2003
  • In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.

  • PDF

자동차 부품기업의 수주-생산-출하 프로세스 통합에 의한 제조자원계획시스템의 설계 및 구현

  • 문태수;김성민
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2005.12a
    • /
    • pp.389-397
    • /
    • 2005
  • 오늘날 급변하는 경영환경에서 기업은 존속과 성장을 위해 기업 내외부에 걸친 경영혁신의 노력을 끊임없이 전개하고 있다. 특히 자동차부품산업의 제조자원계획 업무는 기업의 자본(Money), 인력(Man), 물자(Material), 설비(Machine) 등과 같은 중요한 경영자원을 활용하여 부가가치를 창출하는 업무이다. 본 논문은 국내의 자동차부품 기업을 대상으로 기존 자재소요 계획(MRPI) 업무를 AS-IS 분석에 따라 문제점을 찾아내어 타 업무와의 수평적인 통합에 의해 MRP 업무를 혁신적으로 개선할 수 있는 방안을 도출하고, 제조자원 계획의 관점에서 새로운 TO-BE 모델을 도출함으로써 자동차부품 기업의 수주-생산-자재간의 업무연계를 통하여 제조자원관리(MRPII) 업무를 개선하고자 하였다.

  • PDF

The Study on CPM/MRP Algorithm (CPM/MRP 계획기법(計劃技法)에 관한 연구(硏究))

  • Won, Chin Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.5 no.1
    • /
    • pp.113-122
    • /
    • 1985
  • Although PERT/CPM has been used for over twenty years as a technique for scheduling in a variety of industries and various extention to the basic model have been improved the realism of considering resource constraints, none of these techniqueis have integrated resource acquistion load times and inventory records into scheduling technique. This paper is to designed to over-come basic shortcoming of previous CPM into incorperate with MRP technique.

  • PDF

A Basic Model of the Procurement Planning of Resources by Activity in Construction Projects (건축공사 액티비티별 소요자원 조달계획의 기초모델링)

  • Kim, Ji-Hyun;Nam, Gi-Yung;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.340-346
    • /
    • 2012
  • Recently, the construction industry has been pursuing the rationalization of its various systems through informatization. Procurement is a highly important element of the construction process, as it is directly related to the cost and quality of a construction project. In addition, procurement management of resources is in an indivisible relation, so that it is significant to link each other effectively. This study proposed construction activity and basic data connected to cost summary work for the categorization and utilization of resources. This study connected that activity to detailed items of material and labor cost, and proposed a procurement planning model of resources by activity that can utilize all resources and information. In addition, this model can classify resources and information by various forms. We found that the utilization of this procurement planning model will be higher because it can grasp various problems that occur in the passive procurement and provide additional functions that can be modified.

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재소요계획모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.598-601
    • /
    • 2003
  • As the scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which can extract necessary information is increased. However, compare with large companies, medium-sized companies's organization of head office and management system is weak, so it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and have not associated with schedule information. So when schedule if changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

  • PDF

88대체에너지 기술개발사업의 현황 및 추진계획

  • 박명식
    • 전기의세계
    • /
    • v.38 no.1
    • /
    • pp.16-20
    • /
    • 1989
  • 경제성장과 인구증가에 따른 에너지 수요는 날로 증가하고 있으나 안타깝게도 우리나라에서는 부존자원이 극히 빈약하여 소요에너지의 대부분을 수입에 의존하고 있다. 이같은 배경에서 우리나라에 풍부하게 부존하고 있으나 이용되지 못하고 있는 대체에너지자원을 적극 개발하므로서 우리의 생존과 번영에 필수불가결한 에너지공급문제를 다소나마 해소하고 장기 거시적인 국가발전의 기저를 구축코져 지난해말 대체에너지개발촉진법이 제정 공포되어 금년부터 시행되게 되었다. 본고에서는 상기법에 따라 올해부터 착수되는 대체에너지 기술개발사업의 추진현황을 살펴보고 앞으로의 계획도 간단하게 언급하고자 한다.

  • PDF

A Study on Root Causes of Information Systems Planning Implementation Problems (정보시스템계획 수립상의 문제점 주요원인연구)

  • 김성근;배문주
    • The Journal of Information Technology and Database
    • /
    • v.1 no.2
    • /
    • pp.53-70
    • /
    • 1994
  • 정보시스템 계획수립은 정보시스템 분야의 가장 주된 관심사이다. 최근에 들어 국내에서도 정보기술의 급격한 발전과 업무활동의 통합 필요성에 따라 이에 대한 관심이 매우 높아지고 있다. 실제로 정보시스템 계획수립에는 많은 자원이 소요되고, 이를 올바르게 수행하여 소기의 효과를 거둔다는 것은 쉽지 않은 일로 여겨지고 있다. 본 연구는 정보시스템 계획수립상 겪는 문제점을 토대로 문제점간의 인과관계모형을 제시한다. 이 인과모형은 국내 정보시스템 계획수립상의 문제점을 체계적, 근원적으로 해결하는 방안의 마련에 활용될 수 있을 것이다.

  • PDF

A method of Calculating Optimal Duration and Cost Using Monte Carlo Simulation and Linear Programming (몬테카를로 시뮬레이션과 선형계획법을 이용한 최적의 일정 및 비용 산정방법)

  • Kim Yong-Deuk;Lee Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.210-215
    • /
    • 2004
  • In can occur to many problems on progressing step without close scope definition, interrelation definition between activities, resource plan, and schedule plan on planning step. But it have not closely defined performance system on planning step because of many constraints of domestic construction industry. Therefore this paper intends to discuss a method of calculating optimal cost and duration using Linear Programming that solves maximing or minimizing problems among decision making methodology and Monte Carlo Simulation that decreases to probability errors. With outcoms applying Linear programming and Monte Carlo Simulation for calculating optimal cost and duration, follow as : With outcomes applying Monte Carlo Simulation, it could calculate reliable estimator about project duration through removing various constraints. With outcomes applying Linear programming, it could calculate optimal value about project cost through defining various variables and constraints on many activities.

  • PDF

Development of Integrated Water Resources Knowledge Management System (수자원 통합지식관리시스템 개발)

  • Lee, Sung-Hack;Kim, Sung;Kim, Hak-Soo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.338-342
    • /
    • 2006
  • 최근 들어 수자원관리에 있어서도 다양한 이해당사자의 참여 요구가 증가하고 있으며, 수자원과 함께 생태, 환경, 사회, 경제적인 요소의 고려도 요구되고 있다. 이에 부응하기 위하여 수자원관리자들은 통합수자원관리의 실현을 위한 많은 노력을 기울이고 있다. 본 연구에서는 통합수자원관리에 필요한 지식관리시스템(www.water21.net)을 구축하였다. 수자원 통합지식관리시스템에서는 지식을 구조화/체계화하기 위하여 관리계획의 준비, 모델의 구성, 계획의 수립, 계획의 평가 등 4단계로 구성된 프로세스 온톨로지(Ontology)를 개발하고 적용하였으며, 수자원관련 지식의 효율적인 유통체계를 구축하기 위하여, 물 관련 지식의 허브 역할을 수행할 수 있는 버퍼 개념을 도입하고, 지식제공자들과 '물관련 지식공유협약'의 체결을 추진하고 있다. 통합수자원관리에는 다양한 이해당사자의 참여와 생태, 환경, 사회, 경제적 요소에 대한 고려가 필요하다. 하지만 이를 실현하기 위해서는 많은 시간과 비용이 소요된다. 본 연구에서 개발된 수 자원통합 지식관리시스템은 사용자들에게 물관련 정보를 빠르고 체계적으로 제공함으로써 이에 소요되는 시간과 비용을 줄여줄 것이다. 또한 국가적으로는 물관련 분야의 지식기반을 구축하는데 기여하게 될 것이다.