Preliminary Study of Modulization Construction Method on Concrete Structure for High-rise Building (고층 콘크리트 구조물 모듈화 시공 시스템 기초연구)

  • Koh, Min-Hyeok;Cho, Chang-Yeon;Shin, Tae-Hong;Kwon, Soon-Wook;Kim, Yea-Sang;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.334-339
    • /
    • 2008
  • Construction that over 70% of the structure consists of concrete gets bigger and higher gradually and the demand of that is increasing as well. However, it's not easy to supply young and skilled persons on construction site because of social avoidance phenomena about 3D occupation, so it causes serious problems like aging and shortage of technicians. To solve the problems, executives related to the construction field make a management effort in various ways such as construction period shortening, labor productivity improvement and good quality but recently, they have an increasing interest in the necessity of the modularization of the high-rise building and the automation of the engineering development for the strengthening of international competitive power as more active and long-term alternatives. Therefore, this study is to propose the roadmap in order to make lots of efforts in developing construction technologies of high-rise buildings by performing a foundation study, the strategy for 4-step research development, on modularized construction system of concrete structure of high-rise buildings through domestic and foreign preceding research analyses associated with optimal design modularization technique, module factory automation and assembly automation of modularized objects.

  • PDF

Applications of Improved Low-Flow Mortar Type Grouting Method for Road Safety and Constructability in Dangerous Steep Slopes (급경사지 붕괴 위험지역의 도로 안전 및 시공성을 고려한 개선된 저유동 몰탈형 그라우팅공법 적용성 분석)

  • Choi, Gisung;Kim, Seokhyun;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.409-415
    • /
    • 2020
  • Low-flow mortar injection method grouting technology was selected and the traffic area was preserved as much as possible in order to secure safety for road traffic when the outflow and subsidence of landfill occurred due to ground-water, and etc. In particular, the current existing method was newly improved since there are risks of damage such as hydraulic fracturing at the lower part of the road, spilling of soil particles on steep slopes, and bumps on the road due to excessive injection pressure during construction. This study was carried out at the site of reinforcement work on the road as a maintenance work for the danger zone for collapse of the steep slope of the 00 hill, which was ordered from the 00 city 00 province. The improved low-flow mortar type grouting method adopted a new automated grouting management system and especially, it composites the method for grouting conditions decision by high-pressure pre-grouting test and injection technology by AGS-controlled and studied about grouting effect analysis by using new technology. By applying the improved low-flow mortar type grouting method, it was possible to lay the groundwork for road maintenance work such as the prevention of subsidence of old roads, uneven subsidence of buildings and civil engineering structures, and of soil leakage of ground-water spills. Furthermore, the possibility of application on future grouting work not only for just construction that prevents subsidence of old roads but also for various buildings and civil engineering structures such as railroads, subways, bridges, underground structures, and boulder stone and limestone areas was confirmed.

A Study on the Hole-Plan system combined with 3D CAD (3차원 CAD 통합형 홀 플랜 시스템에 관한 연구)

  • Ruy, Won-Sun;Yu, Yun-Sik;Ko, Dae-Eun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.1
    • /
    • pp.1-7
    • /
    • 2012
  • It is necessary to construct the process automation system to improve the design efficiency and procure the higher design quality on the field of ship building. To construct this system, the shipbuilding companies should improve the 3D CAD/CAM system customized to the ship design and the software about design information management which could solve the conflict problem between the several related design division at the same time. The typical example is the Hole-plan process in the ship-building design. For the request of additional holes from outfitting division, the hull design division checks the compatibility conditions and reflects these holes to the hull panels if acceptable. if not, the requests are rejected and sent back to the outfitting division. These serial processes are not simple and require the tedious communication, discussion, and the complicated drawings. This article gives a basic introduction to the process of hole-plan system and proposes a strategy to automate its process.

Research on Digital Twin Automation Techniques in the Construction Industry through 2D Design Drawing Data Extraction and 3D Spatial Data Construction (2D 설계도면 데이터 추출 및 3차원 공간 데이터 구축을 통한 건설산업 디지털 트윈 자동화 기법 연구)

  • Lee, Jongseo;Moon, Il-YOUNG
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.10a
    • /
    • pp.609-612
    • /
    • 2021
  • Government agencies and companies are establishing and promoting digital transformation strategies in various industrial fields, and are leading the era of the 4th industrial revolution through successful technological innovation. In this time of change, we can see many stories of global companies Nike and Starbucks as successful examples of digital transformation. These two companies are showing successful results through digital transformation. Domestic companies are also conducting digital innovation based on mobile, cloud, IoT, artificial intelligence, and AR/VR technologies, and are establishing RPA (Robotic Process Automation) processes for high efficiency and high productivity. In this paper, we introduce the 3D digital twin space construction automation process technique using data from the entire construction cycle of design, construction, and maintenance of the construction industry, and look into the digital transformation strategy of the construction industry in the future.

  • PDF

A Study on the Application of RTLS Technology for the Automation of Spray-Applied Fire Resistive Covering Work (뿜칠내화피복 작업 자동화시스템을 위한 RTLS 기술 적용에 관한 연구)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.79-86
    • /
    • 2009
  • In a steel structure, spray-applied fire resistive materials are crucial in preventing structural strength from being weakened in the event of a fire. The quality control of such materials, however, is difficult for manual workers, who can frequently be in short supply. These skilled workers are also very likely to be exposed to environmental hazards. Problems with construction work such as this, which are specifically the difficulty of achieving quality control and the dangerous nature of the work itself, can be solved to some degree by the introduction of automated equipment. It is, however, very difficult to automate the work process, from operation to the selection of a location for the equipment, as the environment of a construction site has not yet been structured to accommodate automation. This is a fundamental study on the possibility of the automation of spray-applied fire resistive coating work. In this study, the linkability of the cutting-edge RTLS to an automation system is reviewed, and a scenario for the automation of spray-applied fire resistive coating work and system composition is presented. The system suggested in this study is still in a conceptual stage, and as such, there are many restrictions still to be resolved. Despite this fact, automation is expected to have good effectiveness in terms of preventing fire from spreading by maintaining a certain level of strength at a high temperature when a fire occurs, as it maintains the thickness of the fire-resistive coating at a specified level, and secures the integrity of the coating with the steel structure, thereby enhancing the fire-resistive performance. It also expected that if future research is conducted in this area in relation to a cutting-edge monitoring TRS, such as the ubiquitous sensor network (USN) and/or building information model (BIM), it will contribute to raising the level of construction automation in Korea, reducing costs through the systematic and efficient management of construction resources, shortening construction periods, and implementing more precise construction

Feasibility Analysis for Introducing Automation for Bridge Inspection (교량점검 자동화 장비도입에 대한 타당성 분석)

  • Lee, Tai-Sik;Lee, Jong-Seh;Koo, Ja-Kyung;Hwang, In-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.680-685
    • /
    • 2006
  • Bridges are an integral part of Transportation that is always open to traffic.To effectively manage bridges today, more needs to be done to assess the day-to-day condition and behavior of bridges, and the deterioration rates of their components, so that efficient and proactive measures can be taken. Conventional methods consumemore time and they lack flexibility to reach all locations in high convoluted structures which most bridges offer. Instead, this work uses a new concept of robot, termed as Bridge inspecting robot, which, as its name suggests, possesses superior ability to flex, reach, and approach all points on the bridge. This study also provides economical feasibility model for the same and a comparison with existing bridge inspection and automated inspection work. Finally, we have uncovered few issues and did not analyze some information because of limitation to data.

  • PDF

Improvement of SOC Structure Automated Measurement Analysis Method through Probability Analysis of Time-History Data (시계열 데이터의 확률분석을 통한 SOC 구조물 자동화계측 분석기법 개선)

  • Jung-Youl Choi;Dae-Hui Ahn;Jae-Min Han;Jee-Seung Chung;Jung-Ho Kim;Bong-Chul Joo
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.1
    • /
    • pp.679-684
    • /
    • 2023
  • Currently, large-scale and deep-depth excavation construction is being carried out in the vicinity of structures due to overdensity in urban areas in Korea. It is very important to secure the safety of retaining structures and underground structures for adjacent excavation work in urban areas. The safety of facilities is managed by introducing an automated measurement system. However, the utilization of the results of the automated measurement system is very low. Conventional evaluation techniques rely only on the maximum value of the measured data, and can overestimate abnormal behavior. In this study, we intend to improve the analysis technique for the automation measurement results. In order to identify abnormal behavior of facilities, a time-series analysis method for automated measurement data was presented. By applying a probability statistical analysis technique to a vast amount of data, highly reliable results were derived. In this study, the analysis method and evaluation method that can process the vast amount of data of facilities have been improved.

Conceptual design development of Guide Rail for Cleaning Robot in Curtain Wall Facade of Skyscraper (초고층 건축물 외벽 청소로봇 운용을 위한 가이드레일 개념(안) 개발)

  • Kim, Chang-Han;Han, Jae-Goo;Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.220-229
    • /
    • 2012
  • In recent years, the number of high-rise buildings has been on the rise. As buildings have become larger in scale, significantly different issues related to their construction and maintenance have emerged. In addition, the automation and mechanization of the cleaning work for the curtain wall, one of the most frequently-performed tasks in building maintenance, is required as a fundamental measure. For this reason, a guide-rail cleaning robot system is emerging as one of the measures in response to external factors, including gust. Therefore, this is a preliminary study for the automation and mechanization of the curtain wall cleaning of high-rise buildings, and aims to derive the basic units and prepare for the concept of the guide rail. It is expected to serve as precedent research for the development and operation of a curtain-wall cleaning robot, and to prepare the basis for an final design of optimal guide rail.

Applicability estimation for cable assembling method of shield tunnel using field test construction (현장 조립 시험시공을 통한 쉴드터널 강연선 체결 기술의 적용성 평가)

  • Kim, Dong-Min;Ma, Sang-Joon;Lee, Young-Sub
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.1
    • /
    • pp.11-23
    • /
    • 2015
  • In this study, the new segment assembling method using cable tensible force was developed to improve the problem of bolt assembling method of shield tunnel. In the field test construction, cable assembling method reduced the assembling time of segment in comparison with bolt assembling method because of guide role of segment shear-key. In the result of measuring the necessary time for segment assembling process, it took 420sec to assemble one segment in bolt method and 400sec to assemble one segment in cable method, but in case of using the cable automatic feeder, it could reduce the necessary time as 60sec in comparison with bolt assembling method. The cable automatic system modeling using BIM, that connected shield TBM also will be utilized in the area of design TBM, excavation plan, method process understanding, construction management and so on.

Computer Vision-based Automated Adhesive Quality Inspection Model of Exterior Insulation and Finishing System (컴퓨터 비전 기반 외단열 공사의 접착제 도포품질 감리 자동화 모델)

  • Yoon, Sebeen;Kang, Mingyun;Jang, Hyounseung;Kim, Taehoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.2
    • /
    • pp.165-173
    • /
    • 2023
  • This research proposed a model for automatically monitoring the quality of insulation adhesive application in external insulation construction. Upon case implementation, the area segmentation model demonstrated a 92.3% accuracy, while the area and distance calculation accuracies of the proposed model were 98.8% and 96.7%, respectively. These findings suggest that the model can effectively prevent the most common insulation defect, insulation failure, while simultaneously minimizing the need for on-site supervisory personnel during external insulation construction. This, in turn, contributes to the enhancement of the external insulation system. Moving forward, we plan to gather construction images of various external insulation methods to refine the image segmentation model's performance and develop a model capable of automatically monitoring scenarios with a considerable number of insulation materials in the image.