Browse > Article
http://dx.doi.org/10.5762/KAIS.2012.13.1.1

A Study on the Hole-Plan system combined with 3D CAD  

Ruy, Won-Sun (Department of Ocean System Engineering, Jeju National University)
Yu, Yun-Sik (Convergence of IT Devices Institute Busan, Dong-Eui University)
Ko, Dae-Eun (Department of Naval Architecture and Ocean Engineering, Dong-Eui University)
Publication Information
Journal of the Korea Academia-Industrial cooperation Society / v.13, no.1, 2012 , pp. 1-7 More about this Journal
Abstract
It is necessary to construct the process automation system to improve the design efficiency and procure the higher design quality on the field of ship building. To construct this system, the shipbuilding companies should improve the 3D CAD/CAM system customized to the ship design and the software about design information management which could solve the conflict problem between the several related design division at the same time. The typical example is the Hole-plan process in the ship-building design. For the request of additional holes from outfitting division, the hull design division checks the compatibility conditions and reflects these holes to the hull panels if acceptable. if not, the requests are rejected and sent back to the outfitting division. These serial processes are not simple and require the tedious communication, discussion, and the complicated drawings. This article gives a basic introduction to the process of hole-plan system and proposes a strategy to automate its process.
Keywords
Hole-plan system; Process automation; Hull & outfitting design;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 J. K. Lee & J. H. Kim, "A study about Integrated Ship Outfitting System based on the General purpose CAD program", Journal of the Society of Naval Architects of Korea, 29(3), pp.28-35, 1992.
2 J. K. Lee, Y. Y. Jang, Y. J. Park, & D. H. Jeun, "Development of Integrated Outfitting Design System", Journal of the Society of Naval Architects of Korea, 30(4), pp.33-36, 1993.
3 K. T. Moon, Y. S Yang, Y. P. Youn, & W. S. Ruy, "The Study on Risk and Redundancy Assesment Methodology of Ship Machinery System", Journal of the Society of Naval Architects of Korea, 47(1), pp.76-87, 2010.   DOI
4 S. C. Shin, J. B. Cho, K. Y. Shin, & S. Y. Kim, "Process Improvements for Elevating Pre-outfitting Rate of FPSO", Journal of the Society of Naval Architects of Korea, 46(3), pp.325-344, 2009.   DOI
5 H. W. Suh, & S. G. Lee, "Integrated CAD System for Ship and Offshore Projects", International Journal of CAD/CAM, 6(1), pp. 41-48, 2006.
6 K. H. Ye, & D. J. Kim, "A case study about Hole/Coaming System based on the CAD", DSME Technology, 31('92.9), pp. 61-71, 1992.