The Concept of Schedule and Cost Progress Integrated Management on the BDM Network (BDM 네트워크 공정 및 비용 진도율 통합관리 개념)

  • Kim, Seon-Gyoo;Lee, Yong-Hyun;Noh, Seong-Beom;Ko, Dae-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.54-64
    • /
    • 2011
  • Almost 40 years have been passed since the CPM was introduced to the construction industry in Korea. However most of construction projects in Korea do not prepare the CPM schedule neither operate it after established manually, as well as still depend on the Bar-chart schedule only. One of these reasons is because the CPM schedule does not reflect the site works realistically, it makes so difficult to recognize the actual progress clearly in visual format, and it is impossible to integrate and manage the time and cost oriented work progresses effectively. This paper proposes new concept of progress management that is able to integrate and manage the time oriented schedule progress and earned value oriented cost progress while maintaining the merits of CPM although the CPM schedule summarized automatically within a schedule hierarchy by the BDM that is a new CPM technique. We expect that this concept could make the applications of CPM technique to the domestic construction industry popular and help the advancement of the construction management in Korea as well.

A Suggestion for Merging Quality Management into Software Project Schedule Management (소프트웨어개발 일정관리와 품질관리의 통합 방안)

  • Paek, Seon-Uck;Han, Yong-Soo;Hong, Sug-Won
    • Information Systems Review
    • /
    • v.6 no.2
    • /
    • pp.195-208
    • /
    • 2004
  • In this paper we propose a new software project development management model incorporating quality management to schedule management. Though many efficient techniques such as code review and inspection are used to remove defects, the effect of defect removal time on project schedule hasn't been studied much. However, poor quality management has an important effect upon overall schedule and sometimes software projects fails due to it. Thus, quality management and schedule management should be considered together and we need to reflect the time to maintain software quality into the schedule management. For the proposed model we introduced "Quality Value" representing the needed time to remove software defects. We assume PSP/TSP to gather the needed data for quality value. The proposed model can be used to predict the effect of software defects on schedule in advance and to prevent schedule lag.

Development of Progress Management System based on Quality Inspection Information - Case Study on Nuclear Power Plant Construction - (품질관리 정보를 기반으로 한 진척도 관리 시스템 개발 - 원자력발전소 건설공사 사례를 중심으로 -)

  • Kwahk, Kil-Jong;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.73-84
    • /
    • 2011
  • This study represents construction progress management model based on quality inspection process in addition to cost-schedule integration. Quality inspection process cycle, resource estimate as progress measurement parameter, hierarchical structure of schedule, and inspection lots linking quality inspection to resource estimate are addressed as four main information areas. The authors established several process models to give a structure and correlations among information elements on each of these areas. Applying the process models proposed, an information system was implemented and utilized for nuclear power plant construction. It reveals that the system achieves accurate and objective progress information in near real time with significantly reduced time and effort as well as administrative efficiencies from making quality inspection process online.

Function Organization of nD CAD System for Plant Project by Linking Cost and Resource Information (비용과 자원을 연계한 플랜트공사 nD CAD 시스템 기능 구성 방안)

  • Kang, Leen-Seok;Ji, Sang-Bok;Moon, Hyoun-Seok;An, Jae-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.809-812
    • /
    • 2007
  • This study suggests a methodology for organizing functions of nD CAD model which 4D object is linked with cost and resource information. And the suggested model is composed of process analysis function of plant project based on visualized scenario analysis. That is, it is possible to manage effectively not only construction schedule plan, but also resource and cost information by integrating construction management information into nD CAD object. And the suggested model can be utilized as information of a effective decision-making tool through analyzing of optimal process scenario and sharing of an analyzed information.

  • PDF

RosettaNet based Business Integration Model for Enhancing Manufacturing Firm's Responsiveness (제조 기업의 대응성 향상을 위한 로제타넷 기반 비즈니스 통합 모델)

  • Park, Mok-Min;Park, Jeong-Ho;Shin, Ki-Tae;Park, Jin-Woo
    • The Journal of Society for e-Business Studies
    • /
    • v.15 no.1
    • /
    • pp.89-101
    • /
    • 2010
  • In some industries, manufacturing firms' distinctive competences include not only product superiority but also service excellence. For example, in a highly volatile and dynamic market, flexibility and responsiveness are more valued than just the product cost. And sales order processing, in that respect is a very important process. However, previous studies on sale order processing have considered only due-date assignments or dealt with production scheduling to minimize production cost or delivery lead time. Due to recent advances in information technology, a new approach is possible in dealing with sales order processing. For example, RFID(Radio Frequency IDentification) and ubiquitous computing technology adds real time visibility and traceability to supply chain. In this study, we develop a new due-date re-negotiation process for sales order management and propose a new business integration model to support the re-negotiation process based on RFID, ubiquitous computing technology and RosettaNet's PIPs.

Research on Applying Project Time and Scope Factors to Project Risk and Cost Affect (IT 프로젝트의 범위, 일정 관련 요인이 프로젝트 비용과 위기에 미치는 영향에 관한 사례연구)

  • Lee, Moon-Sun;Kang, Dongsu;Lee, Seouk-Joo;Baik, Doo-Kwan
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2010.04a
    • /
    • pp.962-965
    • /
    • 2010
  • 경영환경 변화에 따라 IT 프로젝트는 수행 규모와 복잡성이 매우 증대하였고 다양한 구성 요소들이 개발, 통합하게 되면서 프로젝트의 위험 요인들이 기하급수적으로 증가하게 되어 프로젝트의 성공과 실패에 영향을 미치고 있다. 본 연구에서는 실제 IT 서비스를 제공하는 대형 SI 업체의 프로젝트 사례 분석을 통해 범위의 변동이 일정에 미치는 영향, 범위의 변동이 비용에 미치는 영향에 대해 조사, 분석 하고, 아울러 범위, 일정의 변동에 따라 발주기관과 연도별 변동성도 연구하고자 한다. 이를 위해 프로젝트 수행 관련 데이터를 수집하고, 통계적 방법에 의해 각 요인들의 영향을 분석하였다. 이러한 분석결과는 프로젝트의 범위의 변동이 프로젝트에 미치는 위험의 관리 허용 한계를 제시하여 프로젝트의 성공을 도모하고자 한다.

A Study on Modularization of a Decommissioning Information Evaluation System (해체 정보 평가 시스템의 모듈 연구)

  • Park, Hee-Seoung;Kim, Sung-Kyun;Lee, Kyne-Woo;Oh, Won-Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2005.05a
    • /
    • pp.305-308
    • /
    • 2005
  • 해체 준비 작업부터 해체 후 처리까지 가상의 디지털 해체 환경에서 해체 활동의 예측에 필요한 모듈별 기능들을 요소별로 검토 분석하였다. 해체 정보 통합 관리 시스템의 기본 정보를 제공할 수 있는 모듈을 확립하기위해 해체 데이터베이스와 3D CAD 를 연동시키는 방안에 대하여 연구하였다. 3 차원 dosimetric mapping 기술로 방사능 오염 분포를 입체적으로 묘사할 수 있는 모듈과 제염 해체 단위 작업별 평가식과 가중치 값을 이용하여 해체 작업자수와 해체 시간을 평가할 수 있는 모듈을 연구하였다. 연구 결과 가상의 해체 환경에서 연구로 및 원자력 시설 해체시 경제성과 안전성에 영향을 미치는 해체 일정과 해체 비용을 평가할 수 있는 단위 모듈들의 기능을 활용하여 해체 통합 관리 시스템의 설계 기준과 요구 조건 및 기능을 도출하였다.

  • PDF

Development of roadside image data acquisition system for road facility management (도로 시설물 관리를 위한 노변 영상 취득 시스템 개발에 관한 연구)

  • Kim, Moon-Gie;Sung, Jung-Gon
    • Proceedings of the KSRS Conference
    • /
    • 2008.03a
    • /
    • pp.7-13
    • /
    • 2008
  • 본 연구에서 개발한 노변 영상(roadside image) 취득 시스템은 효율적으로 도로 시설물들을 관리하기 위함이다. 복잡하고 긴 구간의 도로에 존재하는 도로 시설물을 인력을 사용하여 조사하기에는 많은 시간과 비용이 소요된다. 도로를 따라 움직이는 차량을 이용하는 경우에는 적은 인원과, 단시간에 노변에 설치된 시설물 등의 현황과 상태를 조사 할 수 있으며 도로 주변의 다양한 정보를 알 수가 있다. 또한, 차량에 장착된 GPS/INS 통합시스템을 사용하여 해당 영상의 정확한 위치 정보를 획득 할 수 있다. 그러나 선명한 영상을 취득하기 위해서 야외의 다양한 조건을 만족시키는 카메라와 렌즈의 선정이 중요하며, 이에 따른 동기화 장치(synchronization device)와 영상 획득 프로그램의 개발이 필요하다. 본 논문에서는 경기도 고양시를 대상으로 시험을 실시하였으며, 현재 시판되고 있는 최신의 다양한 종류의 카메라와 렌즈를 차량에 장착한 후 영상을 취득하여 연구에 적합한 하드웨어를 선정하였다. 또한 동기화 장치를 사용하여 DMI(Distance Measuring Instrument)에서 발생되는 트리거 신호를 입력받아 일정한 거리마다 영상을 취득하는 S/W와 동기화 장치의 성능을 테스트하였다. 취득된 노변 영상의 위치 정확도를 테스트하기 위해 DGPS 방법을 이용하여 후처리 하였으며, 레벨 2수준의 교통주제도에 차량의 이동궤적과 도로의 선형을 중첩하여 육안으로 비교 분석하였다. 취득된 노변 영상을 분석하여 지상 모니터링 분야에서 도로 주변 시설물의 변화 탐지에 이용이 가능한 대상 시설물 목록을 선정하였으며 매우 효율적으로 도로의 유지관리에 활용이 가능할 것으로 기대된다.

  • PDF

자동차 부품산업의 전자조달 EIP 시스템 설계 및 구현

  • 문태수;김호진;강성배
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.28-35
    • /
    • 2003
  • 자동차 부품기업은 재료비의 비중이 제조원가의 $70\%$이상 차지할 정도로 부품자재의 조달과 공급이 중요한 영역이며, 완성차를 제조하기 위한 공급망관리에 있어서 필수적인 분야라고 할 수 있다. 본 연구는 국내 자동차부품기업을 대상으로 공급망관리(SCM) 기능이 요구되는 부품조달 및 공급을 위한 자동차 부품업체간의 전자상거래를 활성화하기 위한 목적으로 전자조달(e-Procurement) 기업정보포탈(EIP) 시스템의 프로토타입 을 제안하였다. 제안된 e-Procurement EIP 시스템은 완성차 제조를 위하여 부품을 공급하는 1자 공급업체를 중심으로 2차 공급업체와의 부자재 및 MRO, 소모성 자재를 중심으로 하고 있으며 정보의 통합화를 위하여 중소기업간의 협업 프로세스의 개선, 안전한 XML 전자문서의 교환, 구매 일정관리 및 커뮤니티 형성, 부가서비스 기능 둠을 제공함으로써 부품기업간의 효율적인 협업체제 구죽 및 업무 신속성과 업무처리비용을 절감할 수 있다.

  • PDF

Apartment house project cost schedule for integrated management BIM-based BoQ application plan (공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안)

  • Zheng, Lianyi;Kim, Woong-Gi;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.11 no.2
    • /
    • pp.1-16
    • /
    • 2021
  • Since entering the 21st century, the construction industry has developed faster and faster, and more and more technologies have been applied in the construction industry. BIM technology (Building Information Modeling) was born in this environment. The application of BIM technology can greatly improve the efficiency of cost management and help achieve the goal of cost management. But through BIM to realize project cost management, there is still no good solution. In order to solve this problem, this paper puts forward the concept of WBS structure applied to construction projects by studying the BoQ (Bill of Quantities) list based on BIM, and proposes the numbering method of the structure. The WBS (Work Breakdown Structure) structure proposed in this paper divides more than 5000 cost objects into 133 projects according to the type of work and project schedule. This structure helps to realize the application of BIM in project cost management. Although this article has studied more than 5000 data of three projects, it does not think that it can cover all cost objects in the existing construction industry. The purpose of this article is to propose a solution for cost and Process Control using BIM-based BoQ data.