• Title/Summary/Keyword: 유지보수공사

Search Result 206, Processing Time 0.025 seconds

An Analysis of the Long-term Behavior of the Cable System in the Suspension Bridge (현수교 케이블 시스템의 장기거동 분석)

  • Ryu, Duck-Yong;Kim, See-Dong;Jung, Hie-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.3 s.55
    • /
    • pp.135-144
    • /
    • 2009
  • The cable system of suspension bridges is a very important non-elastic element which caries an external load by a tension force of the cable, such that creates the integrity of a structure. It is not easy to find if cable system have been changed by the maintenance activities such as repairs or reinforcement. Sometimes the maintenance can cause structural deformations and changes of the tension force in cables. In most cases, the cable stayed bridges are managed by health monitering system, however, the main cable of suspension bridges need to develop more accurate and efficient monitoring system. The Namhee Bridge was constructed 35 years ago and it has been continually repaired and reinforced after then. This study describes the behavior of the cable system by analysing many of inspective reports and by using the results of hanger rope test and for the shape of main cables surveys.

Adjustment of Contract Price according to Introduction of Pay Adjustment (건설공사 지불규정제도 도입에 따른 공사비조정방안)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.175-180
    • /
    • 2010
  • Despite continuous efforts by the construction industry to achieve better quality, it doesn't seem that much has been improved. This is mainly because current specifications do not satisfy a change in the market environment, which is that a higher level of quality is now demanded by users. Quality improvement efforts have been satisfied merely to meet specifications. On the other hand, advanced countries have been experienced great success in their construction techniques and have reduced costs by introducing apay adjustment system to the construction industry, in which compensation is based on performance. Following their example, Koreashould introduce such a pay adjustment system in order to motivate the members of our construction industry to achieve better quality and a higher level of construction techniques. However, there has been a lack of a rational approach to the development of a system for cost coordination, as well as performance and quality inspection. Thus, in this study a legal and logical plan was developed that can be used to adjust the construction cost, along with the performance inspection of quality results, in order to introduce a pay adjustment system that is appropriate for domestic regulations.

A Study of the Sustainable Management Method for Construction phase (건설 공종별 친환경 시공 관리 방안)

  • Park, Ji-Ho;Kim, Tae-Kyoung;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.961-966
    • /
    • 2007
  • Recently the regulation related the environment is getting more and more strengthened. Needs for sustainable building is growing more and more interested in construction industry. However, most of the research has been conducted is focused on material production or maintaining phases. There are not enough research especially in construction phase. And it still exists a lot of environmental barrier factor which could not be easily quantified in construction fields. It makes problems that contractors make an effort only an adequate regulation and they does not take an interest in reducing efforts of environmental pollution. This research defines factor categories which have to be mainly managed and provides the integrated construction management method for sustainable building to reduce environmental pollution through analysis of environmental barrier factor in each work package and effective adjustment of construction plan.

  • PDF

The study of developing the freezing seal isolation method for the pre insulated heat transfer pipe (이중보온 열수송관에 대한 동결차수공법개발에 관한 연구)

  • You, Byounghee;Ahn, Changkoo;Kim, Woocheol;Shin, Ikho
    • Journal of Energy Engineering
    • /
    • v.26 no.3
    • /
    • pp.105-112
    • /
    • 2017
  • A lot of piping systems have been used from nuclear power systems to water supply systems. The maintenance of the piping systems is needed to ensure proper operation of the piping systems. Failure of the large pipe systems especially such as KDHC(Korea District Heating Corporation) can be a matter directly related to the enterprise productivity and profitability. It can also lead to very important issues in promoting public safety and convenience. Therefore a method of quick and safety repairs have been emerged as the most important problem. In this study, freezing seal isolation method using liquid nitrogen cryogenic refrigerant was developed for the maintenance of a pre insulated heat transport pipe of KDHC with a diameter of 300 mm. In this study, by employing computational analysis techniques we performed the flow and heat transfer analysis for the targeted pre insulated heat transfer pipe and freezing seal jacket(ice-Plug) and have selected for optimal system. The detailed design model based on the results of the computational analysis finally was produced. A laboratory-scale test apparatus were designed and the freezing seal isolation self-test carried out. Also the performance assessment tests in the test bed of KDHC were carried out for on-site application.

Geo-Morphological Study of Sand Dune for Railway Project in UAE (UAE 내 철도프로젝트 수행을 위한 사막 사구의 지형학적 특성 연구)

  • Moon, Joon-Shik;Kim, Jae-Young;Lee, Seung-Bok
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.9
    • /
    • pp.17-22
    • /
    • 2012
  • Wind blown sand is expected to disrupt the operation of the railway as the presented railway project in this paper consists of large earthworks in extreme topography of the mega dune fields. For successful railway construction in sand dune area, effective mitigation measure is the most important factor to protect the track from wind blown sand. The effective mitigation measure requires an integrated consideration of the earthworks geometry and the direct control measures such as fence system. Basically there's no perfect measure protecting railway track from wind blown sand, and it would be more economical and effective to develop robust, deliberate maintenance program for track and direct control measure on the basis of geo-morphological study. The purpose of this study is to identify the large scale geo-morphological terrains and specific sand dune morphology in the project area in UAE and estimate the direction and migration rate for sand dunes with the local variations in prevailing wind directions by undertaking literature review, and aerial photographs, satellite images, and ground studies.

Development of Algorithm for Vibration Analysis Automation of Rotating Equipments Based on ISO 20816 (ISO 20816 기반 회전기기 진동분석 자동화 알고리즘 개발)

  • JaeWoong Lee;Ugiyeon Lee;Jeongseok Oh
    • Journal of the Korean Institute of Gas
    • /
    • v.28 no.2
    • /
    • pp.93-104
    • /
    • 2024
  • Facility diagnosis is essential for the smooth operation and life extension of rotating equipment used in industrial sites. Compared to other diagnostic methods, vibration diagnosis can find most of the initial defects, such as unbalance, alignment failure, bearing defects and resonance, compared to other diagnostic methods. Therefore, vibration analysis is the most commonly used facility diagnosis method in industrial sites, and is usefully used as a predictive preservation (PdM) technology to manage the condition of the facility. However, since the vibration diagnosis method is performed based on experience based on the standard, it is carried out by experts. Therefore, it is intended to contribute to the reliability of the facility by establishing a system that anyone can easily judge defects by establishing a vibration diagnosis method performed based on experience as a knowledgeable code system. An algorithm was developed based on the ISO-20816 standard for vibration measurement, and the reliability was verified by comparing the results of vibration measurement at various demonstration sites such as petrochemical plant compressors, hydrogen charging stations, and industrial machinery with the results of analysis using a development system. The developed algorithm can contribute to predictive maintenance (PdM) technology that anyone can diagnose the condition of the rotating machine at industrial sites and identify defects early to replace parts at the exact time of replacement. Furthermore, it is expected that it will contribute to reducing maintenance costs and downtime due to the failure of rotating machines when applied to various industrial sites such as oil refining facilities, transportation, production facilities, and aviation facilities.

A Study on leakage monitoring of tunnel linings using the electric resistivity survey (전기비저항탐사를 이용한 터널라이닝 누수조사 연구)

  • Shin, Jong-Ho;Shin, Yong-Seok;Yoon, Jong-Ryeol;Kim, Ho-Jong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.3
    • /
    • pp.257-267
    • /
    • 2008
  • Tunnels acting as drains involve groundwater-related problems such as deterioration of drainage systems or leakage through the linings. Generally initial and minor leakage problems can not be recognized by naked eyes. When the leakage over the linings is noticed, damages to structures and facilities have already occurred and could be considerable. Therefore it is vital to recognize initial leakage as early as possible and provide appropriate measures. Detection of leakage under operation requires installing piezometer. However, that may cause destruction of water proofing sheet which is generally not allowed. In this study electric resistivity method, one of the geophysical surveys, was adopted to detect possible leakage through tunnel linings. Physical lining models were made in the laboratory. The electric response was monitored for varying hydraulic conditions. It is shown that the method is very useful to detect initial leakage and monitor the malfunction of drainage system. Furthermore the method can also be used to check the quality of any repairing works of linings.

  • PDF

The Architectural Simulation for Kenjeongjun of Kyungbok Palace Using Computer Graphics (컴퓨터 그래픽을 이용한 경복궁 근정전 건축 시뮬레이션)

  • Lee, Kang-Hoon;Lee, Hang-Chan
    • Journal of Digital Contents Society
    • /
    • v.9 no.2
    • /
    • pp.269-276
    • /
    • 2008
  • Recently, the concerning about cultural heritages has been increased. As a result, the protection, repairing and restoration of cultural assets have been actively in progress. The biggest project of cultural asset reconstructions is the restoration of Kyungbok Palace and it has been in proceed step by step since in 1989. The actual sizes of these traditional buildings have been measured and recorded for future maintenance. In this paper, the 3D computer graphic technique is used to help understanding the inner structures of the traditional buildings as well as their construction processes. In other word, the construction simulation of Keunjeongjun which is the center building of Kyungbok Palace have been produced using 3D computer graphic techniques. The purpose of this project is aiding people in understanding the process of traditional palace architecture in Korea.

  • PDF

The Extacting Crack in Asphalt Concrete Pavement by Digital Image Processing (수치영상처리에 의한 아스팔트 포장노면의 균열 검출)

  • Jang, Ji-Won
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.10 no.4 s.22
    • /
    • pp.77-84
    • /
    • 2002
  • Recently, damage of pavement represented by crack is depened by the increase of traffic demand up to ten million and wight, and interest about the efficient management of pavement is being increased gradually according to the growth of maintenance expense of road surface. In this study, the possibility of application for acquisition of crack information was tested by appling DCRP and digital image processing technique and measuring crack on road surface precisely. Based on this, objective and efficient road surface measurement was planned and done. Measuring crack width, acquire result of comparative high accuracy. So, it is considered that it can be utilized as plan draft data for deterioration estimation and repair reinforcement work of pavement.

  • PDF

Determination of Base Capacity Values for Short-Term Freeway Work Zone (고속도로 단기공사구간 기본용량 결정에 관한 연구)

  • Kim, Sang Gu;Hong, Gil Seong
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.1
    • /
    • pp.37-46
    • /
    • 2013
  • Lane closure in freeway work zone due to maintenance and repair of freeway facilities results in abrupt change of traffic flow. Sudden change of traffic flow results strong interactions among vehicles, and reduces capacity compared to the ordinary traffic condition. Such capacity reduction is likely to cause congestion, traffic queues, and economic loss cost. This study aims to determine the base capacity for a short-term freeway work zone that can be used to establish a work zone schedule in advance without any traffic impact. First, the research collected detector data and schedule data of road works on all freeways in Korea. Second, the research determined 23 study sites finding the capacity values of work zone after matching two kinds of data. All study sites had varying characteristics regarding traffic flow being adjacent to work zone during road works. The capacity values were reviewed in terms of lane closure configuration, the types of work, and design speed. Finally, research proposed capacity values for a short-term freeway work zone with the design speeds of 100 kph, 120 kph and 1,700 pcphpl, 1,750 pcphpl, respectively.