The unit modular system is a type of prefabricated construction method that completes the building by uniting the modular units on site by transporting the unit module structure manufactured in the factory to the site. Since the unit module structure is not only the frame but also the finished form including the inner and outer materials, it is most likely to be brought into the field. Therefore, not only the damage of the inner and outer materials but also deformation of frame structure due to the vibration generated during the transportation of the vehicle, And it is necessary to take appropriate methods when transporting the module structure. However, there are no methods to prevent modular structure damage due to vehicle vibration in domestic and foreign modular transportation guidelines or standards. In this study, we investigate the vibrations during the vehicle transportation of the module structure through the road driving test, identify the vibration frequency characteristics of the vehicle through FFT analysis, and propose a vibration reduction methods for module transportation.
정부에서는 국가정책 아젠다인 '저탄소 녹색성장'을 실현시키기 위한 노력들을 전산업부문에 걸쳐 진행하고 있다. 건설산업 부문도 예외가 아니어서 에너지 및 온실가스 배출저감을 위한 기술개발이 활발히 이루어지고 있으며 특히, 건축물은 국가 총에너지소비의 20% 이상을 차지하고 있어 주거건물의 에너지 효율화 및 이산화탄소 배출량 저감은 국가적으로 시급한 과제라 할 수 있다. 또한 최근 사회적으로 이슈화되고 있는 주택전세난으로 서민들의 고통이 가중되고 있어, 시장수요에 능동적으로 신속하게 대응할 수 있는 주택생산시스템이 요구되고 있다. 이에 본 연구에서는 친환경적이고 시공 효율성을 극대화시킬 수 있는 시스템을 구축하기 위해 국내 유닛 모듈러 주택생산체계를 조사 분석하여 문제점을 찾아내고 이에 대한 개선안을 제시함으로써 유닛 모듈러 주택의 활성화 기반을 위한 제시하고자 한다.
최근 건설 기업들은 노동력 부족, 원자재값 상승, 건설경기 위축 등으로 인해 새로운 건설시장 개척 및 자동화 기술도입을 적극적으로 추진하고 있다. 이러한 노력의 일환으로 최근 제조업의 생산프로세스와 건설생산프로세스가 결합된 모듈러 건축공법이 부각되고 있으며 이와 관련된 연구가 활발히 진행되고 있다. 모듈러 건축프로세스에서 공장제작의 가장 큰 장점 중 하나는 기존 건축프로세스에서 사용하기 어려웠던 제조업의 생산설비시스템을 활용한 생산원가(공사원감)절감이 가능하다는 것 있다. 이를 뒷받침하기 위해서는 대다수의 건축공종이 집중되어있는 공장제작단계에서의 원가산정이 정확해야 하며 특히 직접적인 계산이 어려운 간접비에 대한 구체적인 산정방인 필요하다. 그러나 국내 모듈러 건축산업이 시장도입단계로 이와 관련된 연구가 한정적으로 이루어지고 있어 모듈러 건축물의 원가왜곡현상이 나타날 수 있는 문제가 있다. 따라서 본 연구는 모듈러 건축물의 공장제작단계에서 국내계약법상에서 명시된 제조업과 건설업에서의 간접비 정의를 고찰하고 활동기준원가계산법을 통해 모듈러 건축물을 구성하는 모듈러 유닛별 간접비 산정방식을 제시하였다. 본 연구는 공장제작단계에서의 전 과정 뿐만 아니라 모듈러 건축물의 설계, 제작, 운송, 시공의 간접비 배분에 대한 기초자료로서 활용될 수 있으며 향후 모듈러 건축물의 공장제작단계에서의 원가산정 정확도 향상 및 모듈러 건축물의 전 생애주기에 따른 원가산정방안 마련에 기여할 것으로 기대된다.
모듈러 공법은 전체공정의 50%~90%를 공장에서 제작하여 이를 운반하여 현장에서 설치하는 공법이다. 이 공법은 현장에서 공정을 최소화하고 공장에서 작업을 극대화하여 공기를 단축하고 품질을 향상시킬 수 있다. 모듈러 공법으로 시공하면, 사용연한이 지나 건축물 철거시 일부 또는 전체를 재사용이 가능하기 때문에 건축폐기물까지 줄일 수 있는 친환경적인 공법이라고 할 수 있다. 이 모듈러 공법은 최근 수요가 증가하는 소형주택과 한국전쟁 당시 지어진 전방의 노후화된 병영시설의 교체에 적합한 공법이다. 경량철골을 사용한 모듈러 공법의 국내 시공 사례는 2003년 신기초등학교를 시작으로 군 병영시설에 확대 적용되고 있지만 아직까지 시장 초기단계이다. 따라서 범용 적으로 활용이 가능한 모듈 유닛의 표준과 공정의 표준정립이 시급한 상태이다. 본 연구에서는 기존 독신숙소의 신축 사례를 바탕으로 1인 숙소를 표준 모듈로 가정하고 모듈의 공장제작, 운반, 현장설치의 모듈러 공법의 최단 공사기간내의 최소 공사비 투입이 가능한 표준 공정을 제안하고자 한다. 공장에서 완성품을 제작하는 것이 가장 합리적이지만 운반시 하자발생을 감안한다면 공장제작비율 80%일 때 가장 합리적인 것으로 도출 되었다.
Unit module system produce units in the factory and assemble in the field. This unit module system has advantages of shortening the process of construction. However, it is still in the early research related to setting the unit module which is transported by truck to the field. Therefore, when transporting the unit module, this goal of study develops fixed devices. And suggesting device were performed that simulations analyzed maximum stress and assessed the safety.
노동집약적 현장중심의 습식공법의 한계로 인해 기술집약적이고 공장생산방식인 유닛 모듈러 공법이 주목을 받고 있다. 국내에서도 유닛 모듈러 공법을 개발하여 학교, 기숙사, 군막사 등에 활발히 적용하고 있으나 주거용 건축물에는 적용하지 못하고 있다. 그 이유는 거주성능에 대한 검증이 부족하고, 경제성에 대한 확신이 부족하기 때문이다. 따라서 본 연구는 모듈러 공법의 기술발전과 주거용 건축물로의 적용을 활성화하기 위해 모듈러 주택의 경제성을 분석하였다. 연구결과에 의하면 건설원가만을 단순 비교했을 때 모듈러 주택의 건설원가는 약 6.2% 상승하는 것으로 나타났다. 그러나 모듈러 주택의 장점인 공기단축이나 공장생산을 통한 생산성을 제고할 경우, 모듈러 주택의 건설원가는 벽식구조 주택과 비슷한 수준이 될 것으로 판단된다.
최근 모듈러 건축물 관련 연구가 활발하게 진행되고 있으나, 실제 건설산업에서 모듈러 건축물을 활용한 건축공사의 발주는 아직 활성화되지 못하고 있다. 이에 대한 여러 가지 원인들이 분석되고 있으나 그 중 중요한 것은 모듈러 건축물은 기존 현장중심의 건설생산체계를 공장제작-운송-현장설치 새로운 체계로의 전환을 요구하고 있다는 것이다. 하지만 국내 공공공사의 기존 발주방식은 전기통신공사업 등 개별법에서 분리발주를 의무화하고 있기 때문에 모듈러 건축물 장점을 살릴 수 있는 새로운 건설생산체계를 수용하기 어렵다. 따라서 기존 발주방식은 모듈러 건축물을 현장중심의 공사로 분리발주(건축 토목, 전기, 통신, 소방 등) 계약할 수밖에 없고, 건축 토목공사의 계약 범위 안에서 모듈러 유닛을 물품으로 구매할 수밖에 없기 때문에 이러한 분리발주로 인한 모듈러 건축물의 공장제작 비율을 저하시키고 공사비 상승, 품질저하 등의 문제를 발생시켜서 모듈러 건축물의 장점을 발휘하지 못하도록 하는 장애요인이 된다. 본 논문에서는 모듈러 건축물에서 요구하는 새로운 건설생산체계를 적극적으로 수용할 수 있는 새로운 발주방식을 개발하여 제안하고자 한다.
모듈러 건축은 공장 생산 과정을 토해서 품질과 정확도를 향상 시킬 수 있고 같은 유닛을 반복적으로 만들어내기 때문에 대규모 생산과 비용 절감이 가능하다. 특히, 현장 작업과 공장 생산을 동시에 진행 할 수 있기 때문에 공기 단축이 가능하다. 그러나 실제 모듈러 건축 프로젝트 조사 보고서에 따르면 모듈러 건축과 기존 건축의 평균 공사 기간에서는 큰 차이를 보이고 있지 못하다. 이는 모듈러 건축 프로젝트의 실제 시공 시 발생하는 공기 지연 문제 때문이다. 따라서 실제 시공 시 공기 지연 방지를 위한 대안 선택이 필요하며, 특히 대규모 모듈러 건축 프로젝트 현장 시공의 경우 현장에서의 모듈 양중 및 조립 과정이 공장 생산과 동시에 진행되기 때문에 대안 파악이 공장과 현장을 동시에 고려하여 수행되어야 한다. 본 연구에서는 규모에 따른 모듈러 건축의 실제 시공 시 프로세스의 차이를 토대로 IDEF0 모델링을 통하여 대규모 모듈러 건축의 관리 요소를 파악하였고 이를 이용하여 공기 지연을 판단할 수 있는 공장 생산량과 현장 시공량 관리 모델을 개발하였다. 이를 이용하여 대규모 모듈러 건축 실제 시공 시 발생하는 공기 지연 문제를 감소시킬 수 있을 것이다.
The purpose of this research is to provide basic data for the promotion strategy to activate modular construction system as residential facilities, through a study on the architectural planning, institutions and policies and research on connection details, for the use as residential facilities of the modular construction that is not actively supplied for the general residential facilities. As a result, I suggest sample model plan of domestic and foreign case analysis and characteristic of modular construction and practical application of modular construction for Residential Facilities. Owing to many advantages including short construction period structural stability and economic benefits, modular construction is expected to play a role as residential alternative of socially controversial affordable housing and weekend homes, and potential housing shortage after reunification; and to contribute to the development of design automation and industrialized constructions. Though Korea is still lacking development of the system that meets the domestic context, if supported by ongoing researches on the development of construction methods, materials and details, the settlement of appropriate modular residential facilities to suit the national situation will serve a possible alternative solution for many housing and environmental problems.
The unit modular method is one in which unit modules are prefabricated at a factory and then constructed at a construction site. That is why an important process, transporting unit module, is added in this method. The purpose of this study is to analyse the load for transporting unit module. The results of the analysis of the driving experimental runs revealed that a maximum load of 15 kN was applied on adapter block type A and a maximum load of 25 kN on adapter block type B. These loads were recorded at the points in the road test when the low-bed trailer was driving through unstable sections of the test such as stopping, restarting, passing over a speed bump or taking a left turn at speed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.