• Title/Summary/Keyword: 열전도도 시험

Search Result 91, Processing Time 0.026 seconds

Evaluation of Ground Effective Thermal Conductivity and Borehole Effective Thermal Resistance from Simple Line-Source Model (단순 선형열원 모델을 이용한 지중 유효 열전도도와 보어홀 유효 열저항 산정)

  • Sohn, Byong-Hu
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.7
    • /
    • pp.512-520
    • /
    • 2007
  • The design of a ground-source heat pump system includes specifications for a ground loop heat exchanger where the heat transfer rate depends on the effective thermal conductivity of the ground and the effective thermal resistance of the borehole. To evaluate these heat transfer properties, in-situ thermal response tests on four vertical test boreholes with different grouting materials were conducted by adding a monitored amount of heat to circulating water. The line-source method is applied to the temperature rise in an in-situ test and extended to also give an estimate of borehole effective thermal resistance. The effect of increasing thermal conductivity of the grouting materials from 0.818 to $1.104W/m^{\circ}C$ resulted in overall increases in effective thermal conductivity by 15.8 to 56.3% and reductions in effective thermal resistance by 13.0 to 31.1%.

A Study on the Heat Transfer Characteristics of Various Construction of SCW Type Ground Heat Exchanger (다양한 형상의 SCW형 지중 열교환기 열전달 특성에 관한 연구)

  • Chang, Keun-Sun;Kim, Min-Jun
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.10
    • /
    • pp.460-466
    • /
    • 2014
  • This paper uses in-situ thermal response tests to present the characteristics of the ground thermal conductivities of three different SCW GHX. These SCW GHXs were installed in the same site in Seojong City. The three different cases are distinguished by the flow direction and the presence of a filler. The first type (A) is constructed for water to flow downstream. The second (B) and third (C) types are designed for water to flow upstream, and a filler is additionally inserted into the third type. The results of the in-situ thermal response tests, indicate that the ground thermal conductivity for types (A), (B) and (C) are of $4.84W/m{\cdot}K$, $3.40W/m{\cdot}K$, and $11.62W/m{\cdot}K$, respectively.

The Effects of the Installation Conditions of Ground Loop Heat Exchanger to the Thermal Conductivity and Borehole Resistance (지중열교환기 설치 조건이 지중 유효 열전도도와 보어홀 열저항에 미치는 영향)

  • Lim, Hyo-Jae;Kong, Hyoung-Jin;Kang, Sung-Jae;Choi, Jae-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.23 no.2
    • /
    • pp.95-102
    • /
    • 2011
  • A ground loop heat exchanger in a ground source heat pump system is an important unit that determines the thermal performance of a system and its initial cost. A proper design requires certain site specific parameters, most importantly the ground effective thermal conductivity, the borehole thermal resistance and the undisturbed ground temperature. This study was performed to investigate the effect of some parameters such as borehole lengths, various grouting materials and U tube configurations on ground effective thermal conductivity and borehole thermal resistance. In this study, thermal response tests were conducted using a testing device to 9 different ground loop heat exchangers. From the experimental results, the length of ground loop heat exchanger affects to the effective thermal conductivity. The results of this experiment shows that higher thermal conductivity of grouting materials leads to the increase effective thermal conductivity from 22 to 32%. Also, mounting spacers have increased by 14%.

Evaluation of Thermal Fatigue Lifetimes of Cast Iron Brake Disc Materials (제동 디스크용 주철의 물성 및 열피로 특성평가)

  • Goo, Byeong-Choon;Lim, Choong-Hwan
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.36 no.8
    • /
    • pp.835-841
    • /
    • 2012
  • We measured the mechanical and thermal properties of four types of cast irons used for manufacturing the brake discs of railway vehicles. It was found that these properties could be controlled by varying the composition of Ni, Cr, and Mo. Thermal fatigue tests were carried out by using a thermal fatigue tester in which thermal cycles could be controlled. Thermal crack initiation and propagation were measured on cylindrical specimens. Finally, we simulated the thermal fatigue test procedure by finite element analysis and calculated the thermal fatigue lifetimes by Manson-Coffin's equation and the maximum principal strain. The estimated thermal fatigue lifetimes corresponded to the measured lifetimes when the total crack length was $40{\mu}m{\sim}1mm$.

Evaluation of Performance of Grouts and Pipe Sections for Closed-loop Vertical Ground Heat Exchanger by In-situ Thermal Response Test (현장 열응답 시험을 통한 수직 밀폐형 지중열교환기용 그라우트와 열교환 파이프 단면의 성능 평가)

  • Lee, Chul-Ho;Park, Moon-Seo;Min, Sun-Hong;Choi, Hang-Seok;Sohn, Byong-Hu
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.7
    • /
    • pp.93-106
    • /
    • 2010
  • In performing a series of in-situ thermal response tests, the effective thermal conductivities of six vertical closed-loop ground heat exchangers were experimentally evaluated and compared one another, which were constructed in a test bed in Wonju. To compare thermal efficiency of the ground heat exchangers in field, the six boreholes were constructed with different construction conditions: grouting materials (cement vs. bentonite), different additives (silica sand vs. graphite) and the shape of pipe-sections (general U-loop type vs. 3 pipe-type). From the test results, it can be concluded that cement grouting has a higher effective thermal conductivity than bentonite grouting, and the efficiency of graphite better performs than silica sand as a thermally-enhancing addictive. In addition, a new 3 pipe-type heat exchanger provides less thermal interference between the inlet and outlet pipe than the conventional U-loop type heat exchanger, which results in superior thermal performance. Based on the results from the in-situ thermal response tests, a series of economic analyses have been made to show the applicability of the new addictives and 3 pipe-type heat exchanger.

Conjugate Simulation of Heat Transfer and Ablation in a Small Rocket Nozzle (소형 시험모터의 노즐 열전달 및 삭마 통합해석)

  • Bae, Ji-Yeul;Kim, Taehwan;Kim, Ji Hyuk;Ham, Heecheol;Cho, Hyung Hee
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.2
    • /
    • pp.119-125
    • /
    • 2017
  • Ablative material in a rocket nozzle is exposed to high temperature combustion gas, thus undergoes complicated thermal/chemical change in terms of chemical destruction of surface and thermal decomposition of inner material. Therefore, method for conjugate analysis of thermal response inside carbon/phenolic material including rocket nozzle flow, surface chemical reaction and thermal decomposition is developed in this research. CFD is used to simulate flow field inside nozzle and conduction in the ablative material. A change in material density and a heat absorption caused by the thermal decomposition is considered in solid energy equation. And algebraic equation under boundary layer assumption is used to deduce reaction rate on the surface and resulting destruction of the surface. In order to test the developed method, small rocket nozzle is solved numerically. Although the ablation of nozzle throat is deduced to be higher than the experiment, shape change and temperature distribution inside material is well predicted. Error in temperature with experimental results in rapid heating region is found to be within 100 K.

우주용 카메라 열제어장치(Cooling Unit) 개발

  • Lee, Deok-Gyu;Lee, Eung-Sik;Jang, Su-Yeong;Lee, Seung-Hun;Gang, Seok-Bong
    • Bulletin of the Korean Space Science Society
    • /
    • 2009.10a
    • /
    • pp.50.1-50.1
    • /
    • 2009
  • 광학탑재체 열제어 시스템(Cooling Unit)은 광학카메라가 우주환경 하에서 작동시 영상검출기(FPA)에서 발생하는 열을 효과적으로 발열하여 영상검출기의 온도를 최적으로 제어하는 시스템이다. 영상검출기(FPA)의 1회 orbit은 100분이며, 예열기간(Preheating) 최대 10분 동안 147W를 발열하고, 촬영기간(Imaging) 10분 동안 147W를 발열하여 1회 orbit 평균 32.6W를 발열하고, Parasitic heat load 15W를 고려하면 1회 orbit당 평균 총 50W를 발열 한다. 열제어 시스템은 50W를 효과적으로 발열하여 영상검출기의 온도를 $14^{\circ}C{\sim}26^{\circ}C$로 제어한다. 열제어 시스템은 Buffer Mass, Heat Pipe, Radiator로 구성된다. 열제에 시스템의 성능규격은 열주기시험, 열진공하 열전도시험 및 진동시험을 통하여 검증한다. 이 논문에서는 국내 기술로 개발되는 우주용 카메라 열제어 장치의 설계 및 해석, 제작현황 등을 소개하고자 한다.

  • PDF

The Comparative Analysis of Numerical and Experimental Results for Prediction of Workpiece Temperature in the Commercial Reheating Furnace (상용급 재가열로에서 소재 온도 예측을 위한 해석과 실험 결과의 비교 분석)

  • Lee, Chunsik;Lee, Jae Yong;Ryu, BoHyun;Rhim, DongRyul
    • Journal of the Korean Institute of Gas
    • /
    • v.23 no.4
    • /
    • pp.74-79
    • /
    • 2019
  • Specially designed test material was used for workpiece temperature measurement in the commercial reheating furnace and a linearized thermal model was applied for real time temperature prediction. The applied furnace is a walking beam type and specification of the workpiece is a STS302 which is 160mm in width, 160mm in height and 8100mm in length. Also six thermocouples were installed in width, height and length direction for temperature measurement. Ambient temperature in the furnace was raised to 1265 Celsius degrees and it took about 2.5 hours from loading to discharging of the workpiece. As a result of the experiment, temperature of the workpiece at discharge was 1257 Celsius degrees on the average in the range of 1256 to 1259 Celsius degrees, and predicted average temperature through the thermal model was 1251 Celsius degrees. Therefore, the deviation of the analysis and test results is about 6 degrees, which is within the range of 10 degrees required by the industry.

핵융합로 부품에 대한 고열유속 시험조건 결정

  • Bae, Yeong-Deok;Lee, Dong-Won;Kim, Seok-Gwon;Yun, Jae-Seong;Hong, Bong-Geun
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2010.02a
    • /
    • pp.273-273
    • /
    • 2010
  • 고열부하 환경에 노출되는 핵융합로의 플라즈마 대향부품은 주로 낮은 원자번호 물질-열전도가 좋은 물질-구조체의 순으로 다층 구조를 이루고 있으며, 이들 간의 우수한 접합성은 부품의 성능을 좌우하는 핵심 요소이다. 이러한 플라즈마 대향부품의 건전성을 평가하기 위해서는 고열속의 열부하를 반복적으로 인가하는 시험이 요구되며, 이를 위해 본 연구원에서는 KoHLT-1, 2의 시험시설을 운용하고 있다. 본 시설에서는 열부하원으로서 그라파이터 히터를 사용하며, 히터는 두 개의 시험 대상부품 사이에 설치되고, 히터에 고전류를 인가하여 복사열에 의해 시험 부품에 열부하를 가하게 된다. 고열부하 환경에서 열피로 시험을 위해 히터에 인가되는 전류를 시간에 따라 일정한 패턴으로 반복적으로 ON-OFF 하게 된다. 본 논문에서는 이러한 고열부하시험을 수행함에 있어 고려해야 할 여러 가지 요소에 대해 논의하였다. 우선 인가하는 열유속(heat flux) 값은 일차적으로 시험시설의 최대 출력에 의해 좌우되며, 시험대상물의 운전조건 및 열부하 반복횟수에 의해 결정된다. 열부하 반복횟수는 주어진 열유속 값에 대해 total strain이 파단에 이르는 수준에 의해 결정된다. 열부하를 인가하는 시간은 히터에 전류를 인가했을 때 요구되는 온도로 상승하는 데 걸리는 시간과 시험대상물의 온도가 더 이상 증가하지 않는데 걸리는 시간에 의해 좌우된다. 냉각시간은 길수록 시험대상물의 온도가 냉각수의 온도에 접근하게 되나 너무 길어지면 시험시간이 급격히 증가하게 되므로, 온도 감소 곡선을 검토하여 적절한 시간을 정하게 된다. 열유속 측정은 냉각수의 온도 상승값과 유량으로부터 계산하게 되며, 정확한 측정을 위해서는 열부하를 인가하는 시간이 충분히 길어야 한다. 또한 시험대상 부품에서 열부하가 인가되는 면적을 정확히 정의해야 하며, 냉각관로에 열부하가 인가되어서는 않된다. 또한 시험대상부품을 지지하는 지지구조체를 통한 열손실을 최소화해야 정확한 열유속을 측정할 수 있다. 시험대상부품을 설치할 때 히터와의 간격 또한 결정해야 할 중요한 요소이며, 간격이 좁을수록 최대 열유속 값을 증가시킬 수 있으나, 너무 가까운 경우 히터의 열변형에 의한 접촉 및 아크 방전의 가능성이 있으며, 이 경우 히터와 시험대상부품의 손상을 가져오게 된다. 시험대상물이 국제열핵융합로(ITER)의 일차벽과 같이 베릴륨이 포함되어 있는 경우 방전에 의한 손상은 인체에 유해한 오염의 원인이 될 수 있다. 또한 순간적인 방전은 고가의 고전류전원의 고장을 유발할 수도 있다. 열부하 시험 중 시험대상물의 온도를 정확히 측정하는 것은 필수적이며, 온도 변화 곡선으로부터 시험대상물의 건전성 여부를 판단할 수 있다. 이를 위해 변화를 가장 잘 탐지 할 수 있는 위치에 온도 센서를 설치하는 것이 관건이며, 이는 사전 분석을 통해 알 수 있다.

  • PDF

Effect of initial ground temperature measurement on the design of borehole heat exchanger (초기 지중온도 측정이 지중 열교환기 설계에 미치는 영향)

  • Song, Yoon-ho;Kim, Seong-Kyun;Lee, Kang-Kun;Lee, Tae-Jong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.600-603
    • /
    • 2009
  • We compared relative importance of thermal conductivity and initial ground temperature in designing borehole heat exchanger network and also we test accuracy of ground temperature estimation in thermal response test using a proven 3-D T-H modeler. The effect of error in estimating ground temperature on calculated total length of borehole heat exchanger was more than 3 times larger than the case of thermal conductivity in maximum 20% error range. Considering 10% of error in estimating thermal conductivity is generally acceptable, we have to define the initial ground temperature within 5% confidence level. Utilizing the mean annual ground surface temperature and the geothermal gradient map compiled so far can be a economic way of estimating ground temperature with some caution. When performing thermal response test for estimating ground temperature as well as measuring thermal conductivity, minimum 100 minutes of ambient circulation is required, which should be even more in case of very cold and hot seasons.

  • PDF