Proceedings of the Korean Institute of Building Construction Conference
/
2015.05a
/
pp.123-124
/
2015
The project participants make use of floats for their benefits. The owner may consume floats in an event of issuing change order(s) and may avoid the risk factors attributed by them; the contractor may reduce activities' costs by substituting the activity with alternative construction method and by leveling the resources, hence consuming floats. There are a lot of disputes and claims involved in the float ownership issue. The ownership of floats should be stipulated in the contract stage. To alleviate these disputes and claims, it is commendable to develop a computational method that quantifies the float value. This paper presents the method that computes the values of total floats which changes over the project life span. The system calculates CPM, compute the ratio of area of banana curve which is enclosed by earliest start curve and latest start-curve.
Proceedings of the Korea Information Processing Society Conference
/
2013.11a
/
pp.54-56
/
2013
가상머신을 사용자에게 좀 더 빨리 서비스하기 위해서 서비스 제공자들은 여유 가상머신이나 여유 이미지를 두는 방식을 취해왔으나 이는 근본적인 해결책이 되지는 못했다. 본 논문에서는 가상머신 이미지를 복사하는 시간을 LVM을 이용하여 최소화함으로써 가상머신이 필요한 순간에 필요한 이미지를 이용하여 실시간으로 생성될 수 있도록 설계하였다. 특히 가상머신 이미지의 크기에 무관한 시간이 소요되며 다수의 이미지를 동시에 생성할 시에도 좋은 성능을 보였다.
Ki, Hyungseo;Park, Dongjoo;Kim, Dongsoo;Kim, Haengbae
Journal of the Korean Society for Railway
/
v.15
no.6
/
pp.638-644
/
2012
In this study, we numerically estimated available and unavailable time of conventional railway by examining 60% which is known as average range of track utilization efficiency. We also estimated track repair time for maintenance which is the main factor of making track utilization change and analyzed appropriate estimated time. The railway's safety should be guaranteed by appropriate railway operating plan and by adequate rail facilities maintenance. At the same time, daily railway train 'Dia's recovery power should be reflected to the management plan. Considering these factors, we examined mechanical equipment and the national rail network in order to rationally estimate track repair time of the maintenance and to secure spare time in case of train delays. It was found that track utilization efficiency was more or less 60%.
This paper proposes the hybrid heuristic method to apply the opportunity time to solve the vehicle routing and scheduling problem with time constraints(VRSPTW). The opportunity time indicates the idle time which remains after the vehicle performs the unloading service required by each customer's node. In this proposed heuristic, we add the constraints to VRSPTW model for the opportunity time. We also obtain the initial solution by applying the cost evaluation function to the insertion strategy considering the opportunity time. In addition, we improve the former result by applying the opportunity time to the tabu search strategy by swapping the customer's node. Finally, we suggest the construction strategies of initial routing which can efficiently acquire the nearest optimal solution from various types of data in terms of geographical condition, scheduling horizon and vehicle capacity. Our experiment show that our heuristic can get the nearest optimal solution more efficiently than the Solomon's I1 heuristic.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.68-74
/
2007
Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.
Kim, JungHoon;Lee, EunSol;Choi, DongCheol;Kim, MinSeok;Kim, SungJin;Choi, NakJin;Choi, JaeHong;Lee, JunDong
Proceedings of the Korean Society of Computer Information Conference
/
2020.01a
/
pp.71-72
/
2020
본 논문에서는 시간과 공간의 제약없이 작물의 생육환경을 관측하고 자동 및 원격으로 제어할 수 있는 스마트팜 플랫폼을 설계 및 구현하였다. 스마트팜 플랫폼은 환경 데이터 수집을 위한 다양한 아두이노 센서 모듈, 웹과 데이터베이스 서버, 애플리케이션을 이용한 자동 및 원격 제어, 총 3가지 기술로 구성된다. 사용자가 앱을 통하여 언제 어디에서나 농장 주변의 환경 정보를 조회하고 원격으로 제어하면 농사에 대한 노동력 절감 뿐만 아니라 시간적·공간적 구속으로부터 자유로워져 여유시간도 늘고 삶의 질도 개선될 수 있을 것으로 기대된다.
The purpose of this study is to find out the most effective evacuation alarm sound which is the one of the most important element of the evacuation guidance system as a fundamental mechanism to minimize the damages of a fire. In this regard, a survey was conducted against the firefighting officers and the general public with questions about the general awareness of fire and their preference to various kinds of fire alarm sounds. The result showed that 1) even though the awareness of the interviewees on fire was improving while there were in familiar places like homes or works. But, when they were situated in unfamiliar locations, the fire safety awareness could not be deemed to be strong. This in turn calls for the education of the public and improvement of the existing policies for the enhancement of the fire related safety awareness in unfamiliar environments. 2) For the question about the possible time they could survive in a fire or the time required for safe evacuation, it turned out that the interviewees were thinking of the time required for evacuation to be short, which calls for proper actions. 3) When the visibility in a fire situation is highly limited, the most preferred answer for the alarm sound was a female voice, saying "The emergency exit is this way," accompanies with flashing lights of sirens for the emergency evacuation guidance.
The Journal of The Korea Institute of Intelligent Transport Systems
/
v.7
no.2
/
pp.26-36
/
2008
Currently, the pedestrian signal timing model has no consideration on the characteristics of different land use patterns and pedestrian behaviors during pedestrian signal timing calculation. This study intended to propose pedestrian signal timing models that could reflect the inherent characteristics of pedestrian and land use patterns. For this study, three major variables affecting the length of signal timing were identified: walking speed, perception-reaction time, and density-delay time. Then, the representative values of each variable were estimated through the field studies. By combining this information, several pedestrian signal timing models were developed. The data in this paper can be used for future references, and the walking environments for pedestrians could be improved by applying the models suggested in this paper.
Main Memory storage system can increase the performance of the system by assigning enough slack time to real-time transactions. Due to its high response time of main memory devices, main memory resident data management systems have been used for location management of personal mobile clients to cope with urgent location related operations. In this paper we have developed a multi-threaded main memory storage system as a core component of real-time retrieval system to handle a huge amount of readers and writers of main memory resident data. The storage system is implemented as an embedded component which is working with the help of a disk resident database system. It uses multi-threaded executions and utilizes latches for its concurrency control rather than complex locking method. It only saves most recent data on main memory and data synchronization is done only when disk resident database asks for update transactions. The system controls the number of read threads and update threads to guarantee the minimum requirements of real-time retrievals.
Journal of the Korea Society of Computer and Information
/
v.19
no.3
/
pp.155-161
/
2014
The objective of this study is to weight analysis portable backpack system of infantry weapon systems for ergonomic design in manual materials handling tasks. For the product design, we analyzed the ergonomic guidelines and status of similar weapon systems by comparing the efficient operation performance provide for the basic data. Result of this study, the relationship between portability and mobility presented for schematic. In the short distance of the short biomechanical criterion, 1-2 hours in the middle of moving psychophysical criterion, 4 hour or more long-distance criterion applied for the physiological criterion for easy of trade-offs that need to be considered. This study suggests for 4 research items for infantry backpack system in manual materials handling tasks. Throughout the result of anthropometric populations, the 5%tile body weight for -0.91kg but 95%tile in 34.17kg considered to be margin for free, easy and efficient operation for the weight margin between portability and mobility in manual materials handling tasks.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.