• Title/Summary/Keyword: 업무프로세스 모델

Search Result 318, Processing Time 0.027 seconds

Automation of Information Extraction from IFC-BIM for Indoor Air Quality Certification (IFC-BIM을 활용한 실내공기질 인증 요구정보 생성 자동화)

  • Hong, Simheee;Yeo, Changjae;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.63-73
    • /
    • 2017
  • In contemporary society, it is increasingly common to spend more time indoors. As such, there is a continually growing desire to build comfortable and safe indoor environments. Along with this trend, however, there are some serious indoor-environment challenges, such as the quality of indoor air and Sick House Syndrome. To address these concerns the government implements various systems to supervise and manage indoor environments. For example, green building certification is now compulsory for public buildings. There are three categories of green building certification related to indoor air in Korea: Health-Friendly Housing Construction Standards, Green Standard for Energy & Environmental Design(G-SEED), and Indoor Air Certification. The first two types of certification, Health-Friendly Housing Construction Standards and G-SEED, evaluate data in a drawing plan. In comparison, the Indoor Air Certification evaluates measured data. The certification using data from a drawing requires a considerable amount of time compared to other work. A 2D tool needs to be employed to measure the area manually. Thus, this study proposes an automatic assessment process using a Building Information Modeling(BIM) model based on 3D data. This process, using open source Industry Foundation Classes(IFC), exports data for the certification system, and extracts the data to create an Excel sheet for the certification. This is expected to improve the work process and reduce the workload associated with evaluating indoor air conditions.

Design and Implementation of A Real-time Collaborative Group ICN Editor (실시간 협업지원 그룹 ICN 에디터의 설계 및 구현)

  • 류재광;김광훈
    • Journal of Internet Computing and Services
    • /
    • v.2 no.5
    • /
    • pp.1-7
    • /
    • 2001
  • Recently, there are two important research trends in the literature the red-time collaborative computing end electronic business process automation. This paper is one of those efforts that would establish an effective business office working and computing environment hough the integration of those two cutting-edge technologies. That is, we try to develop a workflow modeling tool that is semantically based upon the information control net(ICN), which is a typical workflow model for specifying office work procedures(business processes), and that is systemically based upon the real-time collaborative operations by a set of actors, which is called group, We name it "group ICN editor". This paper describes the design and implementation of the group ICN editor that is operable under the real-time collaborative computing environment. We use the Flexible rJAMM toolkit that enables the ICN editor to operate among multiple actors(group) through the event-driven collaboration platform, Consequently, a set of workflow and business processes defined through this editor is not only stored onto database but also transformed into the format of the workflow process definition language(WPDL) that is a standardized workflow description and specification language proposed by the workflow management coalition(WfMC).ion(WfMC).

  • PDF

A Hybrid Modeling Tool for Human Error Control of in Collaborative Workflow (협업 워크플로우에서의 인적오류 제어를 위한 하이브리드 모델링 도구)

  • 이상영;유철중;장옥배
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.10 no.2
    • /
    • pp.156-173
    • /
    • 2004
  • Business process should support the execution of collaboration process with agility and flexibility through the integration of enterprise inner or outer applications and human resources from the collaborative workflow view. Although the dependency of enterprise activities to the automated system has been increasing, human role is as important as ever. In the workflow modelling this human role is emphasized and the structure to control human error by analysing decision-making itself is needed. Also, through the collaboration of activities agile and effective communication should be constructed, eventually by the combination and coordination of activities to the aimed process the product quality should be improved. This paper classifies human errors can be occurred in collaborative workflow by applying GEMS(Generic Error Modelling System) to control them, and suggests human error control method through hybrid based modelling as well. On this base collaborative workflow modeling tool is designed and implemented. Using this modelling methodology it is possible to workflow modeling could be supported considering human characteristics has a tendency of human error to be controlled.

Development of BIM-based CPLM System for Civil Project Management (토목 프로젝트 관리를 위한 BIM 기반 CPLM 시스템 개발)

  • Lee, Kwang-Myong;Lee, Chang-Woo;Han, Song-Yi;Kang, Hyoung-Seok;Noh, Sang-Do
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.24-29
    • /
    • 2011
  • BIM technology, based on 3D model of civil engineering structures, creates and manages information of the structures throughout four stages: Planning, design, construction, and maintenance. BIM is now used around the globe for improvement of the construction productivity. However, in order to expect the efficient engineering work, collaboration system between participants in a construction project is necessary. Therefore, in this paper BIM based CPLM (Construction project lifecycle management) system was designed and developed by analyzing the requirements of participants of a construction project. CPLM system offers an environment which enables the sharing and management of information according to the each stage of construction. CPLM is expected to aid cooperative decision-making during the overall construction process through the process innovation and the efficient data management.

A Study on Development for Construction Management System of Private Infrastructure Project (SOC민간투자사업의 CM 운영체계 개발에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Dae-Young;Cho Hun-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.404-407
    • /
    • 2004
  • This Research suggested direction of development and analyzed necessity and given condition of CM(Construction Management) operation system of SOC private infrastructure project which is judged to grow up continuously from now on, Direction of development which is suggested in this research is largely there, (1)development of SOC private infrastructure project CM work standard process guide, (2)development of SOC Private Investment project feasibility study Performance standard, (3)checklist of SOC by stages and functionally private investment projects risk. Through this development, later we judge effect not only supply of a model case to artivate CM system but heightening of efficiency in domestic construction industry.

  • PDF

IFC test between commercial 3D CAD application using IFC (IFC를 중심으로 한 상용 3D CAD의 호환성테스트)

  • Lim, Jae-In;Kim, Jae-Woo;Kwon, Hyuk-Do;Yoon, Su-Won;Kwon, Soon-Wook;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.85-94
    • /
    • 2008
  • The process of construction industry basically consists of many complicated phase, such as planning, design, construction, MO&R(Maintenance, Operation, and Repair), and deconstruction. And various participants communicate each other during every phase of process. Since construction components have become more complex and diverse recently, many researches on how to exchange and standardization of building. However, in Korea research on IFC(Industry Foundation Classes) which is a standard for international data exchange have been conducted with only study limited Issues, such as studies on the development of 2D extension model for IFC, researches on 3D or 4D based IFC extension, and etc. This stuff covers tests of the compatibility among commercial 3D CAD programs using IFC file format. Several problems of the current IFC model are retrieved as a result.

A Study on the Bid MIS in Construction by Object-Oriented Methodology (공공건설 입찰관리 정보시스템에 관한 연구 - 객체지향 방법론에 의한 공사실적관리를 중심으로 -)

  • Cheon Bong-Gi;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.131-138
    • /
    • 2002
  • Traditional bidding process and activities in public construction area has many problems in terms of the clearness and fairness of administration. And, it causes many cost consumption to suppliers. As part of the efforts to solve these problems, some public institutions developed the electronic bidding systems. But these systems have still problems in diverse aspects. Therefore, the purpose of this study is to analyze current bidding systems through literature survey and questionnaire, to compare the result of the analysis with the developed electronic bidding systems and to suggest the improvement for the coming bidding systems.

  • PDF

Study of CMM base Information Technology company level estimation (CMM 기반 정보기술 업체 수준평가에 관한 연구)

  • Kim Tai-Dal
    • Journal of Internet Computing and Services
    • /
    • v.5 no.1
    • /
    • pp.33-39
    • /
    • 2004
  • In this paper, so that government official in target extent of relevant shame capacitates CMM measuring achievement result by each process as quantitative because do standard, repeat and achieves gap analysis and estimation solidify knowledge management of information base enabling "Quality control, production management, cost control, integral management of knowledge", Solidify customer service through "high-quality, differentiation" of information. Establish administration and supervision item to reach 4 steps level in information ability measurement in formation to prove business efficiency through process optimization and improves formation maturity through voluntary effort of formation continuously. Suggested model who analyze and evaluates application in domestic SI specialty company.I specialty company.

  • PDF

Development of the Common Model for Reuse of GIS Components in Local Governments (재사용을 위한 지자체 GIS 공통모델 연구)

  • Kim, Eun-Hyung
    • Journal of Korea Spatial Information System Society
    • /
    • v.1 no.2 s.2
    • /
    • pp.81-98
    • /
    • 1999
  • The purpose of this study is to provide a common model and implementation strategies for reusing GIS components in local governments. The common model includes several solutions to remove stumbling blocks step by step in reusing or exchanging GIS application systems between local governments. Elements of the model are component architecture, common business process model, common function model, and data model. The elements are the minimum standards for reusability. In order to realize the desirable common model at present, however, the following problems remain : usable components are insufficient in spatial domains and existing GIS application systems require reinvestment to accommodate the new component technology. Three questions are raised to maximize reusability from a monolithic structure toward layered and the componentized GIS application systems : (1) How can the application systems be reused within a local government?, (2) Can the systems be exchanged when they are in the same computing platform?, and (3) When the systems are componentized by standardized interfaces, are the components replaceable between the systems in local governments? Some strategies are presented to accomplish the objectives implicated in the questions. For the actual implementation, several issues such as evaluation procedures for component products, ownership and commercialization issues, will be brought up in the future. Central and local governments, and commercial party need to co-operate each other to maximize the reusability. Reducing overlapping investments in local governments and obtaining competitive component technology in the commercial party should be recognized as critical tasks for the more efficient and economical GIS implementation.

  • PDF

Development of Engineering Checklist Model for Case-based Evaluation of Plant EPC Project (플랜트사업 설계사례의 체크리스트기반 평가모델에 관한 연구)

  • Lee, Sang-Youb;Son, Jae-Ho;You, Young-Hun;Han, Choong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.146-152
    • /
    • 2008
  • Since the year of mid 2000, the EPC industry in Korea has the highest amount of orders received due to tremendous need form middle east asia region. However, the quality requirement from the owner is getting critical, which lead to the more competitive engineering capacity equipped. In order to do so, the development of objective and quantitative evaluation model of engineering process is essential. In order to develop the engineering checklist model for case-based evaluation of EPC project, first, the general description of worldwide EPC industry as well as the literature review of prior study have been performed. Then, the survey interview with experts in the engineering area of EPC project was performed In order to Identify the engineering work tasks and the critical check items, which should be checked during engineering process. Based on these checklist, the weights of check items as well as engineering work tasks also have been defined. The developed checklist model evaluated the two EPC project cases of S company in Thailand in order to explore its applicability. From the analysis of evaluation results, it is expected that the continuous implementation of evaluation based on checklist model can help the EPC practitioner check the critical items in engineering process more efficiently and take an appropriate action for better engineering performance, which finally can lead to the Korea EPC industry being more competitive.