Browse > Article

Development of Engineering Checklist Model for Case-based Evaluation of Plant EPC Project  

Lee, Sang-Youb (건국대학교 부동산학과)
Son, Jae-Ho (홍익대학교 건축공학과)
You, Young-Hun (홍익대학교 대학원 건축공학과)
Han, Choong-Hee (경희대학교 토목건축대학)
Publication Information
Korean Journal of Construction Engineering and Management / v.9, no.3, 2008 , pp. 146-152 More about this Journal
Abstract
Since the year of mid 2000, the EPC industry in Korea has the highest amount of orders received due to tremendous need form middle east asia region. However, the quality requirement from the owner is getting critical, which lead to the more competitive engineering capacity equipped. In order to do so, the development of objective and quantitative evaluation model of engineering process is essential. In order to develop the engineering checklist model for case-based evaluation of EPC project, first, the general description of worldwide EPC industry as well as the literature review of prior study have been performed. Then, the survey interview with experts in the engineering area of EPC project was performed In order to Identify the engineering work tasks and the critical check items, which should be checked during engineering process. Based on these checklist, the weights of check items as well as engineering work tasks also have been defined. The developed checklist model evaluated the two EPC project cases of S company in Thailand in order to explore its applicability. From the analysis of evaluation results, it is expected that the continuous implementation of evaluation based on checklist model can help the EPC practitioner check the critical items in engineering process more efficiently and take an appropriate action for better engineering performance, which finally can lead to the Korea EPC industry being more competitive.
Keywords
Evaluation Model; Checklist; EPC project; Engineering Process;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 이태식외 12명 (2005). 국내 CM활성화를 위한 제도적.기술적 발전방안 연구 및 CM평가기법 개발을 통한 적용성과 분석(건설기술기반구축사업 1차년도보고서), 한국건설교통기술평가원
2 최민수.김무한 (2005). "건설공사 품질시험 및 검사 체계의 개선 방향." 대한건축학회논문집 구조계, 제21권 제12호, 대한건축학회, pp143-148
3 홍정석.배대권.김재준 (2005). "건설현장 안전관리 성공요인 분석을 통한 안전관리 활동 개선방안." 한국건설관리학회논문집, 제6권 제5호, 한국건설관리학회, pp148-156   과학기술학회마을
4 최흥식 (2007). "세계플랜트EPC사업의 지속적 참여를 위한 한국의 준비." 플랜테크 저널, 제3권 제2호, (사)한국플랜트학회, pp2-4
5 송상훈.이현수.박문서 (2006). "활동 중심의 건설프로젝트 품질비용 측정 및 분석." 대한건축학회논문집 구조계, 제22권 제3호, 대한건축학회, pp129-138
6 고성석.송혁.이한민 (2005). "재해사례와 위험도 지수를 활용한 건축공사 안전정보 시스템 개발." 대한건축학회논문집 구조계, 제21권 제6호, 대한건축학회, pp113-120
7 한승헌.선승민.박상혁.정도영 (2006). "해외건설공사 수익성 영향인자의 계층구조 및 사례적용에 관한 연구." 한국건설관리학회논문집, 제7권 제5호, 한국건설관리학회, pp64-70   과학기술학회마을
8 이명흔 (2007). "플랜트EPC산업의 전문인력 양성에 관한 연구." 플랜테크 저널, 제3권 제2호, (사)한국플랜트학회, pp17-19
9 김선국.박종규.손기영.박찬식 (2007). "화력발전소 발주방식 비교를 통한 적정 발주방식 선정 모형", 한국건설관리학회논문집, 제8권 제1호, 한국건설관리학회, pp66-77   과학기술학회마을