• Title/Summary/Keyword: 업무분류체계

Search Result 288, Processing Time 0.025 seconds

Regional snows scenario for the support systems Analysis (지역별 제설 시나리오 응원체계 구축연구)

  • Kim, Heejae;Oak, Youngsuk;Kim, Geunyoung
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.2
    • /
    • pp.163-172
    • /
    • 2017
  • Because of abnormal weather, a heavy snow on the Northern latitudes occurs frequently. This has resulted in significant damage and recovery costs. In korea, it has been declared a special disaster area due to heavy snowfall in Gangneung and Pohang 2004, 2005 and 2011, so there was a revision of action instruction for the road snow removal. Although, in our current system, snow removing methodology, regional equipment holdings, and snow responsible interval, respectively, has been classified by the National Highway, near cities and provinces support system not yet prepared. Only, if snow removing is not possible within the region itself, which contained the contents of "support and assistance to military or nearby offices requests". In this thesis, we studied the disaster scenario development according to heavy snow and the response and support system to the features of each regional. For the scenario deduction, we preferentially collected day snowfall and disaster yearbook data to regionals, classified similar pattern and plotted GIS snow map. We also classified heavy snow disaster by region and type and we deduced five-step scenario. The five-step scenario is nationwide(1st-stage), the National Capital region(2nd-stage), the Chungcheong Provinces(3rd-stage), the Kangwon province(4th-stage) and the Ch?l a provinces(5th-stage). Therefore we build near provinces support system according to five-step scenario.

Exploration on the Affecting Factors in Goal Planning (목표계획과정의 영향요인 탐색연구)

  • Yoo, Jae-Wook;Huh, Keun
    • Management & Information Systems Review
    • /
    • v.32 no.2
    • /
    • pp.1-19
    • /
    • 2013
  • The purpose of this study is to provide the model for goal planning system and explore the affecting factors in suitability of goal planning system and possibility of goal attainment. The findings in a factor analysis of the sample of Korean firms indicate that the factors suggested by theories and previous studies can be summarized to 40 implications and then 7 groups including attachment of top managers, systemicity, participation system, motivation, alignment of top-down & bottom-up. adjustment for environmental changes, goal content. In addition, the findings in multiple regression analyses show that goal content, alignment of top-down & bottom-up, and adjustment for environmental changes are positively, significantly influence the recognition level of employees on the suitability of goal planning system. On the other hand, goal content, attachment of top managers, and motivation are significantly influence the recognition level of employees on the possibility of goal attainment. This study provides the checklist for the suitability of goal planning system and various implications for practitioners.

  • PDF

Evaluating Spatiality of Green-House Gas Emission in Building Site ("대" 지목에 의거한 온실가스 분포의 공간성 평가)

  • Kim, Jun-Hyun;Um, Jung-Sup
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2010.06a
    • /
    • pp.94-102
    • /
    • 2010
  • These days the land category is the most specific basis of legal for land use or land use form that is determined by the main use of land. Even if same land building site, it is used very various like a detached house, a row house, a multiplex house, a villa, an apartment, a mixed-use Apartments, commercial building, fallow land etc. There is a need of variety analysis in order to apply greenhouse gas emission or statistics assessment for standard of classification. Therefore, This study measured carbon dioxide by for different government agencies of maps by land use time, season, elevation, space, area of floating population. As a result, The emission characteristic was high l.78 times, on average of l.35 times in winter compared with summer, when the temperatures increased 11C, the carbon dioxide is 22ppm high in the afternoon, A commercial building is high 4.04 times compare with detached house.

  • PDF

Identification of Business Process in the Closure Phase of Construction Programs (건설프로그램 종결단계의 업무프로세스 도출)

  • Lee, Woo-Yeon;Lee, Seung-Hoon;Cha, Yongwoon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.70-78
    • /
    • 2020
  • Construction program management requires more systematic management than traditional management methods due to the complexity of the project and various stakeholders. In particular, the systematization of closure phase of the process is in urgent need as there is a difference between the owner's expectations and the contractor's deliverables, resulting in delayed handovers, conflicts, frictions, and increased legal disputes. This study identified the process and activities of closure phase through domestic and international literature and case studies for the successful closure of the construction program. Further, the proposed processes and activities were verified through expert verification for appropriateness and the possibility of application to the site. By utilizing the processes and activities proposed in this study, the project aims to overcome the limits of closure phase and improve the satisfaction of the owner, as well as to enhance the global competitiveness of domestic construction companies.

Development of evaluation model on PMIS function using CMM - Focused on Project Communication Management - (CMM개념을 활용한 건설 PMIS 평가 모델 개발 - 프로젝트 의사전달관리를 중심으로 -)

  • Park Jeong-Ha;Shin Kyoo-Chul;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.460-463
    • /
    • 2002
  • The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports. A major problem for constriction companies is the lack of project assessing model for project management. One method of solving the problem is through the systematic management of construction processes. A development of model for assessing PMIS practice is attempting to develop a stepwise process assessment framework for the construction industry using Capability Maturity Model. This paper have provided further insights into the understanding of the framework, as well as its value for construction sector.

  • PDF

A Study on the Improvement Plan for Royalty System in the National R&D Programs for Industrial Technology (산업기술지원 연구개발사업의 기술료 제도개선에 관한 연구)

  • Park, Jung-Hee;Moon, Jong-Beom
    • Journal of Korea Technology Innovation Society
    • /
    • v.12 no.2
    • /
    • pp.430-456
    • /
    • 2009
  • The industrial Technology Development Program enables the recipient to set up technology infrastructure and to facilitate technology diffusion. In return, government charges royalties to the program recipient. However, the current royalty system is not effective form. This study analyzes the various aspects of royalty collection methods applied to the Industrial Technology Development Program and recommends the following: a) to establish a royalty collection system with appropriate charges for both fixed royalties and running royalties, dependent upon type of technology development b) to seek a method to setup different collection periods for industrial categories in consideration of product life cycle c) to review on ownership of intangible property. In addition, in order to manage the entire royalty process effectively, prompt establishment is needed in order for a responsible evaluation institute to create task forces to evaluate technology value, to transfer technology, to support technology commercialization, to collect and manage royalty and expand and report result.

  • PDF

A Study on the Application of Construction Management Delivery System by Characteristics of Facility (건설사업관리 발주방식의 시설물 특성에 따른 적용방안에 관한 연구)

  • Gee, Hyoung-Kwon;Kang, Hyun-Wook;No, Jae-Deuk;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.449-454
    • /
    • 2008
  • The purpose of this study is to analyze, applications of the construction management delivery systems according to characteristics of facilities. The adapted research method is to selected four mall in the capital region and then divided them into two groups: CM for Fee or CM at Risk. After analyze each applications and administrations, it could propose proper applications of CM for fee according to CM at Risk. The results of this study are as follows: 1) the CM for Fee was suitable for the projects focused on completing on time and constructing the effective business plan of quality control, and 2) the CM at Risk was suitable for the projects concentrated on the cost reduction through shorten the construction time and the related businesses on quality control.

  • PDF

Study on the Improvement of Proposal Works for PPP Project: Focused on Operation and Maintenance Cost (민간투자사업의 제안서 작성 업무 개선에 관한 연구 - 운영관리비 산정 업무를 중심으로 -)

  • Koo, Ja Kyung;Lee, Dong Wook;Shim, Myung Seob;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.655-662
    • /
    • 2010
  • As the national competitive power indicator, the infrastructures have been constructed with government's SOC budgets. However, even SOC budget is decreased, Public-Private Partnership Project (PPP project) has been introduced to solve demands on extending infrastructures, and among PPP projects, road projects take high portions. This study analyzes the operation & management item of financial model which is connected to the O&M cost and project proposal of previously proposed road project and analyzes the Korea Expressway Co.,'s project cost items and O&M tasks to reflect the characteristics of road projects. Based on results, this study suggests necessity of the O&M cost breakdown structure and the cost calculation standard on each cost item. Also, for the existing task execution tools, O&M cost calculation tool and finance analysis task tool will be integrated, and the system is suggested web-based system. Thus, it is expected that it contributes to the securing overall business values on PPP project and expending profit-base infrastructures.

A Study on the Maintenance of Communication Facilities using the Standardized Database (표준화된 데이터베이스 구축을 통한 지하철 통신설비의 효율적 관리방안 연구)

  • Kim, Gil-Dong;Shin, Jeong-Ryol;Lee, Woo-Dong;Kang, Seung-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2004.07e
    • /
    • pp.99-102
    • /
    • 2004
  • 21세기 정보화시대에 맞추어, 도시철도운영기관의 전략적 발전과 도시철도의 정보화 기술 축적 및 표준화된 정보 인프라 구축의 일환으로 도시철도 시설물 유지보수체계를 표준화하고 정보화시스템을 구축중에 있다. 이중, 도시철도 통신 설비의 효율적인 유지보수를 위해서 유지보수체계의 표준화 및 정보화시스템 구축을 통한 실시간 정보의 구축 및 기존 유지보수작업 이력정보의 관리가 매우 중요하다. 본 연구에서는 도시철도 통신 설비의 효율적인 유지관리를 위한 데이터베이스 설계 및 구축방안에 대하여 제시하였다. 통신 설비의 데이터베이스 구축을 위하여 표준분류체계를 수립하였고, 관리항목 및 유지보수작업항목을 표준화하였으며, 유지 보수업무절차를 표준화하고 도면 및 각종 문서양식을 표준화하였다. 통신 설비의 데이터베이스는 개체관계모델(ERB)을 사용하여 설계하였고 특히, 통신 설비는 위치정보와 밀접한 관계를 가지고 있으므로 일반 데이터 외에 GIS용 공간 데이터베이스를 구축하여 서로 연관된 Key를 가지고 상호조회가 가능하도록 설계하였다. 그리고, 통신 설비에 대한 기초 데이터를 구축하기 위한 방안으로 엑셀조사 양식을 통하여 방대한 기초 자료를 작성하고, $SQL^*$Loader 등의 데이터 변환프로그램을 활용하여 데이터베이스에 일괄 등록되도록 하는 방안을 제시하였다 또한. 도면반입절차서 및 표준도면작성지침서, 그리고 GIS DB 구축지침서를 통하여 표준화된 데이터베이스 구축이 이루어지도록 하였다.

  • PDF

A Study on the Maintenance of Signal Facilities using the Standardized Database (표준화된 데이터베이스 구축을 통한 지하철 신호장치의 효율적 관리방안 연구)

  • Kim, Gil-Dong;Shin, Jeong-Ryol;Lee, Woo-Dong;Kang, Seung-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2004.07e
    • /
    • pp.130-133
    • /
    • 2004
  • 21세기 정보화시대에 맞추어, 도시철도운영기관의 전략적 발전과 도시철도의 정보화 기술 축적및 표준화된 정보 인프라 구축의 일환으로 도시철도 시설물 유지보수체계를 표준화하고 정보화시스템을 구축중에 있다. 이중, 도시철도 신호 장치의 효율적인 유지보수를 위해서 유지보수체계의 표준화 및 정보화시스템 구축을 통한 실시간 정보의 구축 및 기존 유지보수작업 이력정보의 관리가 매우 중요하다. 본 연구에서는 도시철도 신호 장치의 효율적인 유지관리를 위한 데이터베이스설계 및 구축방안에 대하여 제시하였다. 신호 장치의 데이터베이스 구축을 위하여 표준분류체계를 수립하였고, 관리항목 및 유지보수작업항목을 표준화하였으며, 유지보수업무절차를 표준화하고 도면 및 각종 문서양식을 표준화하였다. 신호 장치의 데이터베이스는 개체관계모델(ERD)을 사용하여 설계하였고 특히, 신호 장치는 위치 정보와 밀접한 관계를 가지고 있으므로 일반 데이터 외에 GIS용 공간 데이터베이스를 구축하여 서로 연관된 Key를 가지고 상호조회가 가능하도록 설계하였다. 그리고, 신호 장치에 대한 기초 데이터를 구축하기 위한 방안으로 엑셀조사 양식을 통하여 방대한 기초 자료를 작성하고, SQL*Loader 등의 데이터 변환프로그램을 활용하여 데이터베이스에 일괄 등록되도록 하는 방안을 제시하였다 또한, 도면반입절차서 및 표준도면작성지침서, 그리고 GIS DB 구축지침서를 통하여 표준화된 데이터베이스 구축이 이루어지도록 하였다.

  • PDF