• Title/Summary/Keyword: 안전리스크

Search Result 266, Processing Time 0.031 seconds

Development of Standard Risk Indicators for the Prevention of Serious Accidents in Mobile Crane Operations (Focused on Construction Industry) (이동식크레인 작업의 중대재해예방을 위한 표준 리스크 평가 지수 개발 (건설업을 중심으로))

  • Jonggook Choi;Jongwoo Lee
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.719-728
    • /
    • 2023
  • Purpose: Mobile cranes are machines that contribute to high mortality, and the High Risk Factor (SIF) information, which analyzed 2,574 accidental deaths in the construction industry in the past 6 years (2016~2021), resulted in a total of 61 mobile crane accidents. Despite safety measures in the field, it is not used properly. In this study, we present standard risk assessment indicators that contribute to accident prevention. Method: Through expert interviews, fatal accident case analysis, field analysis, and literature research, we present the standard risk assessment index method of the 4M risk assessment method. Result: As a result of analyzing the risk assessment of eight sites, it was concluded that it cannot make a significant contribution to disaster prevention and should be applied as an improvement measure of the Standard Risk Assessment Index Law. Conclusion: Switching to the standard risk assessment index method at construction sites has been proposed to make it easier for health and safety personnel and workers to use, contributing to the reduction of accidents.

A Study of SIL Allocation with a Multi-Phase Fuzzy Risk Graph Model (다단계 퍼지 리스크 그래프 모델을 적용한 SIL 할당에 관한 연구)

  • Yang, Heekap;Lee, Jongwoo
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.170-186
    • /
    • 2016
  • This paper introduces a multi-phase fuzzy risk graph model, representing a method for determining for SIL values for railway industry systems. The purpose of this paper is to compensate for the shortcomings of qualitative determination, which are associated with input value ambiguity and the subjectivity problem of expert judgement. The multi-phase fuzzy risk graph model has two phases. The first involves the determination of the conventional risk graph input values of the consequence, exposure, avoidance and demand rates using fuzzy theory. For the first step of fuzzification this paper proposes detailed input parameters. The fuzzy inference and the defuzzification results from the first step will be utilized as input parameters for the second step of the fuzzy model. The second step is to determine the safety integrity level and tolerable hazard rate corresponding to be identified hazard in the railway industry. To validate the results of the proposed the multi-phase fuzzy risk graph, it is compared with the results of a safety analysis of a level crossing system in the CENELEC SC 9XA WG A0 report. This model will be adapted for determining safety requirements at the early concept design stages in the railway business.

A Study on the Development of Safety Cases Based on International Standards (국제규격에 기반한 철도종합안전대책기술서 개발에 관한 연구)

  • Caskie, Alan;Wang, Jong-Bae;Maeng, Hee-Young;Kim, Young-Sang
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.289-294
    • /
    • 2007
  • 새로운 시스템이나 제품이 철도운영환경에서 이용할 수 있을 만큼 안전하다는 것은 체계적인 문서화를 통해 입증해야 한다. 이러한 적정성을 제공하기 위해서는 안전성 관련 사항들은 논의에 대한 유효성을 판단하기에 앞서 독립적인 검증기관이나 자체적인 전문 평가를 수행하는 기관(또는 관리기관)에 제시되어져야 한다. 이러한 유효성은 종합안전대책기술서 형태로 제공되어지며 이는 사실에 대한 단순한 열거가 아니라 해당 시스템이나 제품의 실제 사용시 안전하다는 확신을 해당 기관에게 줄 수 있도록 고안되어 있는 일련의 논의들이다. 종합안전대책기술서는 관계자가 시스템 및 제품의 신규도입으로부터 발생되는 모든 리스크에 대한 분석 및 평가 수행여부와 이러한 리스크를 어떻게 관리하고 개선시켜 왔는지를 나타내주는 문서이다. 또한 관리가 효과적이고 지속적으로 적용되었음을 확인하기 위한 관리시스템을 제시해 주기도 한다. 본 연구는 유럽의 철도산업 범주내에서 종합안전대책기술서 그 자체의 특성과 시스템의 형태 및 적용 가능한 제품에 대해 정의를 내리는데 그 목적이 있으며 기술서의 취지와 구조, 보조문서 및 관련법규에 관한 사항에 초점을 맞출 것이다.

  • PDF

자율운항선박 사이버안전체계 구축방안

  • 임정규;최상훈;박개명
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2022.06a
    • /
    • pp.350-352
    • /
    • 2022
  • 자율운항선박을 IMO 자율화등급 3단계 이상으로 운용하기 위해서는 내·외부 통신시스템의 사이버보안뿐만 아니라 실시간으로 데이터를 교환하는 데이터 및 시스템 사이버안전에 대한 고려가 필수적으로 요구된다. 본 연구에서는 자율운항선박 사이버안전체계 구축방안에 대해서 살펴본다. 자율운항선박 사이버안전체계 구축을 위해서는 선박 내 사이버위협을 실시간으로 탐지하고 영향을 모니터링하는 통합 보안 시스템 구축이 필요하며, 선박 사이버안전 설계 타당성을 검증하는 사이버리스크평가 기술, 사이버안전체계를 검증하기 위한 CVE(Common Vulnerabilities Enumeration)기반 취약성 진단 및 침투테스트 기술, V-Model을 활용한 통합 소프트웨어 품질인증 기술, ISO 25024 기반 데이터 무결성 검증 기술 적용이 필요하다.

  • PDF

Risk Assessment with the Development of CAES (Compressed Air Energy Storage) Underground Storage Cavern (CAES(Compresses Air Energy Storage) 지하 저장 공동 개발에 따른 리스크 사정)

  • Yoon, Yong-Kyun;Seo, Saem-Mul;Choi, Byung-Hee
    • Tunnel and Underground Space
    • /
    • v.23 no.4
    • /
    • pp.319-325
    • /
    • 2013
  • The objective of this study is to assess risks which might occur in connection with the storage of the highly compressed air in underground opening. Risk factors were selected throughout literature survey and analysis for the characteristic of CAES. Large risk factors were categorized in three components; planning and design phase, construction phase, and operation & maintenance phases. Large category was composed of 8 medium risk groups and 24 sub-risks. AHP technique was applied in order to analyze the questionnaires answered by experts and high-risk factors were selected by evaluating the relative importance of risks. AHP analysis showed that the operation & maintenance phases are the highest risk group among three components of large category and the highest risk group of eight medium risk groups is risk associated with the quality and safety. Risk having the highest risk level in 24 sub-risks is evaluated to be a failure of tightness security of inner containment storing compressed air.

항로표지 리스크 평가에 기초한 시설운영률 산정에 관한 연구

  • Jeon, Min-Su
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2014.10a
    • /
    • pp.336-338
    • /
    • 2014
  • 항로표지시설은 선박안전통항 유도시설로서 등광, 형상, 색채, 음향, 전파 등을 수단으로 선박에 지표가 되는 시설로서 그 설치는 주변의 해양환경, 해상교통 및 위험정도에 따른 객관적 판단에 의하여 설치되어야 한다. 본 연구에서는 항로표지의 신설 및 평가 시 적용가능한 리스크평가에 대하여 연구하고 그 방법을 제안한다. 정량적 리스크평가에 대한 IMO(국제해사기구), 및 IALA(국제항로표지협회)의 관련 기준을 연구하여 아국 항로표지시설의 리스크평가를 위한 기초자료로 활용하였다. 본 연구의 결과는 항로표지 시설의 설치, 유지 및 관리를 담당하는 해양수산부의 시설물 평가에 효율적인 판단 자료로 활용될 것으로 기대한다.

  • PDF

Development of Standard Systems through Analysis of Business Process the Risk Factors for the Korean Construction Management Firms (국내 CM기업의 리스크 인자별 관리 업무 프로세스 분석을 통한 표준업무체계 개발)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.73-83
    • /
    • 2015
  • Construction management firms in Korea have mainly focused on the key management areas of time, cost, quality and safety management in line with a rapid change of construction industry recently. However, a risk management is considered comparatively less important found from our research on an investment by the firms for training, system establishment. This has been identified that the construction management firms have taken an approach of dealing with risks with their experience, insight rather than managing risks with a systemized principles or proper tools. Therefore, the current system for risk management was identified by analyzing risk factors and work process in this research and systemized process for risk management of the identified risk factors was suggested. This research is expected to be a basis on establishing standard gudiance for risk management and risk management tools.

원전의 지진위험도 평가

  • 한국원자력산업회의
    • Nuclear industry
    • /
    • v.8 no.8 s.66
    • /
    • pp.79-97
    • /
    • 1988
  • 일본원자력연구소에서는 현재 원자력발전소의 확율논적 안전성평가방법을 개발$\cdot$작성하고 있다. 이 평가에서는 원자력발전소의 지진에 의한 리스크도 대상으로 하고 있으며, ${\ulcorner}$지진위험도평가${\lrcorner}$도 지진리스크 평가의 일환으로 수행되는 것이다. ${\ulcorner}$지진위험도${\lrcorner}$란 용어의 정의가 확정되어 있지는 않지만, 본고에서는 원자력발전소의 사이트에 어느 정도 레벨의 지진이 어느정도 빈도로 발생하는지로 정의한다.

  • PDF

Risk-Informed Allowed Time Extension for Transmission Line Isolation (리스크정보활용 원전 송전선로 휴전작업 허용시간 연장)

  • Chi, Moon-Goo;Jeon, Ho-Jun;Lim, Hyuk-Soon
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.152-153
    • /
    • 2011
  • 원자력발전소(원전) 터빈발전기에서 생산된 전력은 송전망과 발전소 운전에 필요한 기기 작동을 위해 소내로 공급되도록 설계되어 있다. 최근 신규원전의 전원 공급을 위해 가동중 원전의 송전선로 휴전 작업시 운영기술지침서의 운전제한시간을 초과한 휴전작업에 대한 안전성 문제가 대두되었다. 본 논문에서는 정상운전중인 원전의 송전선로 1개 휴전 작업중 운전중인 송전선로 상실시 리스크를 분석하여 허용기준 만족 여부를 평가하고, 리스크관리 대책을 수립하여 전력계통의 신뢰성 및 안전성 향상에 기여하고자 한다.

  • PDF