Development of Remodeling Prototype Plans in 1st-Phase New Town Aged Apartment - Based on '2 Bay Type' of 1st-Phase New Town Representatives - (1기 신도시 노후 공동주택 리모델링 평면 프로토타입 개발에 관한 연구 - 2 Bay 형식의 1기 신도시 대표유형을 중심으로 -)

  • Choi, Jaepil;Choi, Junho;Kim, Youngsun;Moon, Sunghoon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.6
    • /
    • pp.67-76
    • /
    • 2018
  • A prototype of remodeling floor plans are proposed in this study. They are researched base on the majority floor plan type which forms 19% out of representatives 1st-Phase New Town Aged Apartment compositions. In order to examine possible scenarios of the prototypes, prototype planning model is derived from the president studies on aged apartment remodeling. The prototype plans reflect residents' preference survey and lead 6 different kinds of prototype plans regarding 3 different remodeling scenarios. Prototypes consider characteristics of multi-complex buildings and households which applicably various remodeling planning options; story-Increase remodeling, residents custom remodeling etc. The study has significance to be basic planning materials for remodeling of association and local government.

Development of Change Management System for Urban Development Project (신도시 건설사업의 변화관리시스템 구축에 관한 연구)

  • Cho, Jinyoung;Jang, Ounsung;Yu, Junhyuk;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.79-86
    • /
    • 2014
  • Construction project become larger and more complicated. Korea go through government complex relocation Mega-size program including many sub-projects which were complicated, long-term, and need extensive funding. Effective change management is very important for this kind of mega-project since it has many stakeholders and can't avoid continual change of schedule, budget, etc. Especially, change management process and system is very important for program success. When each project have changes, program is impacted by these changes. So, Change management is very important for effective program budget and time management. This study try to develop change management process and framework considering continuous changes in project level for effective program management. In addition, this study developed change management system and applied it to new mega-size program and analyze the effectiveness.

PAZ-based Parking Supply and Operation Planning Model Considering Land Use (토지이용을 고려한 주차분석존(Parking Analysis Zone) 기반 주차 공급 및 운영 계획 모형)

  • Yu, Jeong Whon;Hur, Kyum;Ryu, In Gon;Jeon, Gyo Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.5
    • /
    • pp.659-669
    • /
    • 2022
  • Recently, parking problems have repeatedly occurred not only in the residential areas of the old town, but in detached residential areas, neighborhood living facilities, and commercial areas of the planned New Town. This study suggests a strategy to minimize parking problems before constructing a New Town by reviewing these parking problems at the new city district planning stage. Parking problems can be divided into supply-demand and non-supply-based, and the solution strategy is reviewed in terms of supply and operation. The procedure for applying the solution strategy is proposed according to the effectiveness and ease of application.First, this paper suggests the PAZ (Parking Analysis Zone) as the basic analysis unit. Second, the supply-based parking problem in the concerned area based on the land use plan of Hanam Gyosan is reviewed. Last, solutions to a parking problem for each PAZ are presented.

A Study on the Trend of New Town Planning of Malaysia (말레이시아 신도시 주거단지 개발 경향 연구)

  • Ju, Seo-Ryeung;Choi, Yun-Kyung;Lee, Li-Na
    • Journal of the Korean housing association
    • /
    • v.21 no.5
    • /
    • pp.103-113
    • /
    • 2010
  • The post-war period has witnessed the emergence of new towns in a number of countries in Southeast Asia. The new town development in Malaysia started with Petaling Jaya (PJ) as a satellite town in 1953 to accommodate the rapid growing population of Kuala Lumpur (KL). Shah Alam (SA), Subang Jaya (SJ) are all located in the Klang Valley and act as an important social and economic development hub in the nation. New towns have been designed in accordance with the British town planning principles, which were based on the model of a modern ideal city. They constituted a new regional character because they were developed taking into consideration factors such as local technologies as well as site and, climatic conditions. The initial goal of the new town construction and planning, which focused basically on resettling squatters, was later changed to focus on the improvement of the quality of living. This phenomenon was related to the emergence of the middle class, which had grown rapidly ever since. With the public agencies, the private sectors have played an important role in providing viable and sustainable human units of settlement that address the new design issues of new town planning. The goal of this study is to identify the identity of the recent new town planning principles of Malaysia, how they were developed over time and how they were regionalized and transformed in a cultural and regional context. For the analysis, we chose 3 new towns which are located in Klang Valley and which are representative recent projects of two major housing development companies in Malaysia. To identify the planning principles, we analyzed these projects in the viewpoint of the urban space, street system, and housing blocks and units.

Emergence of New Towns and Changes in Commuting patterns of Seoul Residents (수도권 신도시 건설과 서울 거주자의 통근통행패턴 변화)

  • Kim, Hyun-Woo;Kim, Ho-Yeon
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.14 no.3
    • /
    • pp.437-451
    • /
    • 2011
  • The purpose of this study is to identify the factors that influence commuting patterns of Seoul residents after the construction of new towns. To find the determinants of commuting time for residents with jobs in Seoul, a multiple regression analysis is performed using household survey data. Overall, the findings present a plausible picture of the spatial configuration in Seoul, where younger residents with growing families move out to the suburbs to become owners of apartment homes, and drive or use mass transportation to get to work. As they get older and wealthier, other things being equal, they gravitate towards the city centre in order to reduce the time wasted on commuting. While their occupations appear to play little role, it seems that the entrapment hypothesis on female workers is supported as well. In addition, excess commuting is still prevalent due to jobs-housing mismatch in Seoul, although it is less severe than in the past. Based on these results, planners should devise better strategies to solve the inefficient commuting problem.

  • PDF

현장탐방 - 이라크 비스마야 신도시 건설 PC플랜트 및 아파트 기계.소방설비공사 윤창기공(주)

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.295
    • /
    • pp.57-68
    • /
    • 2015
  • 내전 후 전쟁 상처를 복구 중에 있는 이라크는 주택, 인프라, 사회 서비스망 구축의 필요에 따라 지난 2010년 이라크 기획청(Ministry of Planning, MOP)이 이라크의 삶의 질 개선을 위한 국가개발계획(Iraq National Development Plan, 2010 ~ 2014)을 수립하고 15개 주정부와 쿠르드 자치정부 지역에 100만호 주거 시설 제공을 위한 국가 주택 프로그램을 발표했다. 이에 따라 2017년까지 주택과 교통인프라, 에너지, IT, 의료, 보안 등에 걸쳐 총 2,750억불(약 300조원)을 이라크 재건사업에 투자할 계획이다. 또 2030년까지는 에너지 분야에 5,000억불 투자 등 정유공장, 발전소, 도로, 인프라, 공공시설 및 군시설 등 다양한 분야에 최소 7,000억불에 달하는 예산을 투입할 예정이다. 한화건설은 지난 2012년 80억 달러 규모의 이라크 비스마야 신도시 건설공사를 수주해 우리나라 해외건설 역사상 최대 규모의 프로젝트 기록을 세웠다. 또한 이 계약으로 우리나라 해외건설 누적 수주액 5,000억 달러 돌파에 크게 기여했다. 윤창기공(주)(대표 백종윤)는 비스마야 현장에서 PC 플랜트 현장의 기계설치공사와 하우징 현장의 기계설비 및 소방공사를 담당하고 있다. 본지는 이라크 현장에 있는 윤창기공(주) 정몽준 소장과 김용우 소장을 이메일로 만나 보았다.

  • PDF

IT infra Performance Ways in Different Types of City for Echo-friendly u-city Implement (환경친화적인 u-City 구현을 위한 도시 유형별 IT infra 구현 방안)

  • Eom, Ki-Bok;Yu, Gwang-Uk;Yun, Yong-Jin
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.11a
    • /
    • pp.556-560
    • /
    • 2006
  • u-City는 첨단 정보통신 인프라를 바탕으로 유비쿼터스 정보서비스를 제공함으로써 도시의 문화와 역사를 반영한 환경 친화적이고, 경제적이면서 도시의 가치를 높이는 스마트한 미래형 첨단 도시이다. 그래서, u-City는 신도시를 중심으로 정부와 지자체, 토지개발사업자, 통신업자, 대형 SI, 솔류션 제공사업자에 의하여 수행되고 있다. 하지만 신도시 뿐 만 아니라 기존도시에서도 u-City를 구축할 것으로 기대되며, 도시유형별 IT Infra 구현 방안의 필요성이 요구되고 있다. 따라서 본 논문에서는 미래지향적인 기업유치가 용이하고 경제성을 극대화 할 수 있는 지속 성장 가능한 도시건설을 위하여 환경친화적인 u-City 구현을 위한 도시 유형별 IT infra 구현을 목적으로 한다.

  • PDF

인물 포커스 - 경기도시공사 권재욱 사장

  • 사)한국건설안전기술협회
    • Journal of the Korea Construction Safety Engineering Association
    • /
    • s.45
    • /
    • pp.8-13
    • /
    • 2008
  • 설립 10주년이라는 길지 않은 역사에도 불구하고 낙후된 지역을 획기적인 생산 주거의 대명사로 일군 파주 LCD 단지를 비롯해 명품 주거공간으로 탈바꿈될 광교신도시 개발 등으로 경기도를 획기적으로 개혁하고 있는 주체 경기도시공사 권재욱 사장으로부터 모든 국민이 관심을 갖고 있는 경기도의 미래에 대해 들어보았다.

  • PDF

조경기술사회 탐방

  • 한국기술사회
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.1
    • /
    • pp.6-7
    • /
    • 2009
  • 조경기술사회는 1989년 9월 25일 조경기술사들이 모여 분회를 구성하여 조경기술사의 지위향상과 권익보호에 힘쓰고 있다. 조경기술사의 신기술 및 기술보급을 통하여 국토환경의 보전, 공원녹지, 공지확충계획, 신도시의 개발과 기존도시의 정비 등에 경관계획, 조성 및 관리에 적극적으로 노력하고 있는 한국기술사회 조경기술 사회를 탐방하여 김기성 회장을 만나보았다.

  • PDF

2008년 하반기 유망 분양 단지-도심 속의 아파트가 뜬다

  • Park, Ji-Min
    • 주택과사람들
    • /
    • s.218
    • /
    • pp.74-77
    • /
    • 2008
  • 압축 도시(Compact City)란 도시 용지의 이용 효율성을 높이기 위해 직장과 주거지의 거리를 좁히고, 자연 공간을 최대한 확보할 수 있도록 하는 신개념 도시를 말한다. 압축 도시 형태의 개발이 최근 국내에서 신도시를 비롯해 인기를 끌고 있다. 올 하반기에 분양하는 유망 단지들 역시 이런 트렌드에서 크게 벗어나지 않는다. 어떤 분양 단지가 유망한지 짚어본다.

  • PDF