Program-level Maintenance Scheduling Support Model for Multiple University Facilities (프로그램레벨 다수 대학시설물 유지보수 일정계획 지원 모델)

  • Chae, Hong-Yun;Cho, Dong-Hyun;Park, Sang-Hun;Bae, Chang-Joon;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.303-312
    • /
    • 2018
  • The university facility is made up of multiple buildings and has many maintenance items. In addition, administrative constraints need to be handled within a limited period. Most maintenance work is small scale and multi-work construction, such as waterproofing, needs to be organized. The facility manager makes annual unit price contract with a maintenance company and carries out the maintenance work. On the other hand, delay and rework is occurring because existing maintenance work performed without scheduling based on the manpower input. This study proposed a scheduling model that can support the facility manager to manage maintenance works of multiple university facilities at the program level. The model consists of three stages in order. In object analysis, details of the maintenance items were analyzed and the quantity is calculated based on the quantity takeoff sheet. In resource analysis, the craftsmen and construction period of detailed works are derived for the effective input of craftsmen. In scheduling, the priority of each work and the optimal manpower input are derived. The optimal schedule is selected according to the goodness of fit. The applicability and effectiveness of the prototype was evaluated through a case study and interviews with case participants. The model was found to be an effective tool to support the scheduling of maintenance works for the facility manager.

A Study on the Actual Condition of Electrical Construction Supervision and Countermeasure of It (전력시설물공사 감리제도의 현황과 실태분석 및 개선방안에 관한 연구)

  • Seo, Hwang-Hyeon
    • Proceedings of the KIEE Conference
    • /
    • 2008.09a
    • /
    • pp.15-17
    • /
    • 2008
  • 본 논문은 현행 전력기술 관리법에 의하여 시행되고 있는 전력시설물공사 감리제도의 제도개선에 관한 연구로서 연구자의 현장 실무경험과 감리제도의 일반사항, 감리업자와 감리원에 대한 사항, 감리업자 선정 및 입찰에 관한 사항을 조사하여 전력시설물공사 감리제도의 현황과 실태분석 및 개선방안을 제시한 내용으로 연구결과는 다음과 같다. 첫째, 법적 및 제도적 측면에서 시급히 개선될 사항이다. 정부는 1995년 12월 법률 제5,132호로 전력기술관리법을 제정하여 전력시설물에 대한 공사감리 업무를 별도 분리 발주하여 전문성을 높이도록 전기 분야 전문기술자에 의해 수행토록 하는 것을 골자로 하는 책임 감리제도를 도입하여 오늘에 이르고 있다. 그러나 공사 준골단계에서 전기사업법 제98조 2항에 의해 위탁업무를 하고 있는 전기 안전공사가 사용전 검사를 함으로서 책임 감리제도의 도입 취지를 무색케 한 정도로 심각한 국면에 접어들었다. 전력기술관리법이 제정되어 13년이 지난 오늘까지도 책임 감리제도가 성공적으로 정착되지 못한 근본적인 문제는 사용전 검사를 전기 안전공사에서 대행하고 있다는 것이다. 물론 그동안의 많은 노력으로 어느 정도의 개선은 있었지만 근본적인 문제가 해결되지 않고서는 전력시설물공사의 감리기술의 전문화를 기대하기 어려운 실정이다. 따라서 책임 감리계도의 성공적인 정착을 위해서는 전기사업법 제98조 2항에 의한 위탁 업무인 사용전 감사 제도를 감리업자에게 돌려줌으로서 책임과 권한을 실질적으로 부여하고 감리회사 자체의 기술력 및 기술자 확보와 기술개발에 필요한 운영자금 및 투자 확대를 유도해 나가야 하며, 무엇보다도 확실한 법적 제도적 뒤받침이 선행되어야 한다. 둘째, 제도적 측면에서 일반건축물은 사업주가 전력시설물공사 감리업자를 임의선정 및 수의계약에 의해 감리업자를 지정하고 해당 공사기간동안 전기 감리원을 투입토록 되어 있어 인건비에 미치지 못하는 저가수주와 다음계약을 위해 어쩔 수 없이 사업주에게 종속되는 경우가 많으며, 이로 인해 감리수행에 혼란이 야기되고 책임소재의 불분명 책임 감리원의 조정 및 통제기능이 약화되는 부작용이 나타나고 있다. 전력시설물공사의 감리는 전력시설물의 안전사고, 비효율 및 부실소지 둥을 방지하기 위해서 필수적이고 발주자 감리업자 시공업체에게 모두 도움을 주는 업무이며, 일정규모이상의 건축물은 자발적인 참여로 유도할 수 있도록 적격심사제도(PQ심사)도입이 적극 필요한 실정이다. 셋째, 운용측면에서 공동주택의 주택법에 의한 전력시설물공사 감리는 사업승인권자가 사업수행능력 평가기준(PQ 심사)에 따라 감리업자를 지정하고 해당 공사기간 동안에 전기 감리원을 투입토록 되어 있으나 평가기준이 세대수에 따라 정해져 있어 효율적, 기술적 측면에 미치지 못하는 경우가 많다. 수준 높은 감리를 수행하려면 그에 맞는 적정한 감리원의 투입이 필수적이다. 넷째, 운용 및 제도적 측면에서 공공발주 건축물(공동주택 포함)의 전력시설물공사는 사업수행능력 평가기준(PQ 심사)에 따라 감리업자를 지정하고 해당 공사기간 동안에 전기 감리원을 투입토록 되어 있으나 발주자 소속직원의 감리수행 근거에 의해 자체 감리를 함으로서 시장경쟁 및 민간경제 활성화의 제약, 부정부패 및 비효율 등 사회에 전반적으로 악영향을 끼쳐 하루 빨리 민간 감리업자에게로의 개선이 시급한 실정이다.

  • PDF

Study on Telemedicine system in Medical Law (의료법상의 원격의료 제도에 관한 고찰)

  • Joung, Soon-Hyoung;Park, Jong-Ryeol
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.12
    • /
    • pp.241-249
    • /
    • 2012
  • The rapid development of the current information and communication brings big changes and progress in the health service delivery system. And it is becoming the worldwide trend increasingly. As the name of medical information, by more rapid, detail and more quickly to the patients and diagnosis of the disease it provides not only a high level of health care services but also hospitals and related institutions are making increase the efficiency of the work. Among them, the Telemedicine, that system has many advantage which can expect the shorten the waiting time and the uniform high level of medical, etc. without visiting medical institutions. Especially, the most advantage is it can increase the accessibility of information about extensive medical, without regard to the time and place. But this is the reality, which compared speed the development of modern science and technology with lack of operational regulations and mindset. Current in our Medical Law, it regulates the Telemedicine, but it has Institutional, facility, and environmental constraints. Because, there is no detailed legal relationship. And it takes that in terms of a special form called by a non-face-to-face contact with medical practice rather than the scene. Therefore, in this paper will find a way out to activate the Telemedicine by presupposes the development potential is infinite and find the legal issues and improvements.

Development of an evaluation index based on supply capacity for practical evaluation of drought resilience (현실적 가뭄대응력 평가를 위한 공급가능일수 기반의 평가지표 개발)

  • Kim, Gi Joo;Kim, Jiheun;Seo, Seung Beom;Kim, Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.1
    • /
    • pp.11-21
    • /
    • 2023
  • This study suggests the drought resilience index as S-day as a means of preparing for the recent extreme drought, allowing for the actual operational identification of each drought countermeasure's priority as well as the vulnerability of water resource facilities to drought. Although each dam's drought measures are unique in this case, the representative examples include adjusting the water supply, linking the functioning of various facilities, and considering emergency capacity. Here, 15 multipurpose dams and water supply dams in Korea were inspected. Under the return period of 20-year drought, most of dams showed stable by adjusting the water supply overall. The measures, however, did not seem to be able to resist a multi-year drought lasting more than two years. Besides, Hoengseong and Anodong-Imha Dam only lasted a year under the 100-year drought return period with other measures. Without the deployment of drought mitigation strategies, it is expected that the Hoengseong Dam, Andong-Imha Dam, Gunwi Dam, Unmun Dam, Daecheong Dam, and Juam Dam would not be able to meet the all water demand for a year under the 20-year drought condition. The ideal capacity for each drought measure was then suggested. Additionally, by increasing or decreasing the current supply contract by 10% in order to account for demand changes resulting from socio-economic instability, the drought response capacity of all 15 dams was re-evaluated. By lowering the supply contract amount by 10%, it was possible to endure a severe drought.

Development and Prospective of Day-neutral Strawberry Cultivars for Year-round Production (딸기 연중생산을 위한 중일성(Day-neutral) 품종 개발과 전망)

  • Jong Nam Lee;Do Yeon Kim
    • Proceedings of the Plant Resources Society of Korea Conference
    • /
    • 2023.04a
    • /
    • pp.3-3
    • /
    • 2023
  • 우리나라 딸기는 시설재배 발전과 품종개발로 겨울을 대표하는 과일로 변신하였다. 이는 저온단일에서 꽃이 만들어져 착과되는 생태적(일계성)특성 때문이다. 우리나라의 딸기 정식기는 95%이상이 촉성작형으로 9월 중순 정식한 후 11월 하순부터 이듬해 5월 하순까지 약 6개월간 수확한다. 반대로 여름작형은 고온장일에서 꽃이 만들어져 착과되는 사계성 품종을 이용하는데 우리나라 500m 이상의 산간 고랭지에서 3-4월에 정식한 후 6월부터 11월까지 수확하지만 생산량은 전체의 0.3% 미만이다. 또한 여름딸기는 제과용으로만 사용되고 있어 6월부터 11월 사이에 신선딸기의 단경기가 발생된다. 이러한 문제를 재배적으로 해결하기 위해 일계성 품종을 이용하여 겨울부터 봄까지 포기냉장한 후 여름과 가을에 꺼내어 정식하면 45일 내외에 수확하는 주냉장 억제작형을 시도하였으나 우리나라에선 실용성이 떨어져 사라져간 기술이다. 그러나 네덜란드는 우리나라와 같은 주냉장기술을 활용(Waiting bed system, Table top system)하여 여름과 가을철에도 딸기를 생산하고 있다. 이 작형은 냉장기간이 길고 재배기술도 까다로울 뿐만아니라 1화방만 수확하여 수량성이 낮은 단점이 있다. 한편 미국에서는 일계성 품종이 품질은 좋으나 고온기에 꽃대발생이 어렵고 사계성은 품질이 떨어지는 단점을 극복하기 위해 일장의 길이와 관계없이 꽃대가 형성되는 중일성 딸기 품종을 보급하여 세계적으로 가장 많은 재배면적을 점유하고 있다. 연중생산이 가능한 중일성 품종을 개발하기 위해 먼저 유전자원을 수집하였고 품질이 좋은 일계성 품종을 중일성 품종과 교배하여 채종하였다. 교배종자를 파종하여 묘를 만든 후 정식하여 실생개체를 선발한 결과 고온장일 조건에서 개화되는 사계성(중일성)율은 약 10-20% 범위로 매우 낮았다. 선발된 우량계통은 영양번식을 통해 증식하여 생산력, 특성, 지역적응성 검정과정을 통해 품종을 개발하였다. 이렇게 단교잡에 의한 중일성 품종 선발육종은 선발율이 0.05%으로 매우 낮았다. 이렇게 우리나라 최초의 중일성딸기 '고슬' 품종이 개발되었다. 이 '고슬'은 9월부터 수확이 가능한데 이 때의 딸기 가격이 kg당 20,000원 이상으로 높으며, 수확기간은 '설향'보다 4개월 더 길게 재배가 가능하다. 연중재배를 위해서는 항상 8-25℃의 범위을 유지해야 품질이 높아지므로 재배관리가 중요하다. 흰가루병에는 저항성이 있으나 시들음병과 탄저병에는 약하고 당도와 경도가 높고, 향이 매우 진하다. 식물공장에서 매우 인기가 있는데 안정된 꽃대발생과 대과, 고당도와 함께 수술의 화분량이 많아 수정이 잘되는 특성으로 식물공장 사업이 확장되고 있는 중동나라에서도 로열티 계약(UAE 등)이 예정되어 있다. 1년 연중 개화되고 착과되는 특성으로 가정에서 기르는 반려식물로도 인기가 있다. 또한 아열대 고랭지대는 항상 서늘한 날씨이기 때문에 한번 정식후 1년 연중생산이 가능하여 2023년 베트남과 로열티 계약(1.6억원)을 하였다. 또한 '고슬'은 우리나라 신선딸기 수출 단경기에 생산되어 주년생산 수출체계에도 기여할 것으로 본다.

  • PDF

Comparative Study of Security Services Industry Act and Police Assigned to Special Guard Act - Focused on special guards and police assigned to special guard duty - (경비업법과 청원경찰법의 비교 연구 특수경비원과 청원경찰을 중심으로)

  • Noh, Jin-keo;Lee, Young-ho;Choi, Kyung-cheol
    • Korean Security Journal
    • /
    • no.57
    • /
    • pp.177-203
    • /
    • 2018
  • Police Assigned to Special Guard Act was legislated in 1962 to solve issues regarding the protection of various staple industrial installations, and in 2001, the Security Services Industry Act was revised to establish an effective security system for important national facilities. Thereby the Special Guards System was instituted. The current law has two parts, with the Police Assigned to Special Guard System and Special Guards System, and many scholars have actively discussed the appropriateness of the integration of both systems to solve problems caused by a bimodal system. However, in spite of these discussions taking place in the academic world, the idea of unification lost its power when the guarantee of status regulation was established for the police assigned to special guard. Strictly speaking, police assigned to special guard is a self-guard, and a special guard is a contractual guard. So, both of them have pros and cons. Thus, it would be desirable to give a legal, constitutional guarantee for both systems by strengthening each of them and making up for the weakness of each of them rather than trying to unify police assigned to special guard and special guard. To begin this process, we need to revise unreasonable legal provisions of Security Services Industry Act and Police Assigned to Special Guard Act as below. First, since the actual responsibilities of special guards and police assigned to special guard duty are the same, we need to make the facilities which they use equal. Second, legal provisions need to be revised so that a special guard may perform the duties of a police officer, according to the Act on the Performance of Duties by Police Officers, within the facility that needs to be secured in order to prevent any vacancy in the guarding of an important national facility. Third, disqualifications for the special guards need to be revised to be the same as the disqualifications for the police assigned to special guard duty. Fourth, it is reasonable to unify the training institution for special guards and for police assigned to special guard duty, and it should be the training institution for police. On-the-job education for a security guard needs to be altered to more than 4 hours every month just like the one for police assigned to special guard duty. Fifth, for a special guard, it is not right to limit the conditions in their using weapons to 'use of weapon or explosives' only. If one possesses 'dangerous objects such as weapon, deadly weapon, and so on' and resists, a special guard should be able to use their weapon against that person. Thus, this legal provision should be revised. Sixth, penalty, range of fines, and so on for police assigned to special guard duty need to be revised to be the same as the ones for a special guard. If we revise these legal provisions, we can correct the unreasonable parts of Security Services Industry Act and Police Assigned to Special Guard Act without unifying them. Through these revisions, special guards and police assigned to special guard duty may develop the civilian guard industry wholesomely under the law, and the civilians would have a wider range of options to choose from to receive high quality security service.

A Study on NOS Model System for The Construction Work Planing and Management (건설 시공 계획 및 관리 업무의 적용을 위한 NOS 모델 구축 연구)

  • Choi, Jaejin;Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.10-18
    • /
    • 2016
  • This study presented a new NOS model through the following suggestions to apply the construction work planing and management to NOS(Network Operating System). First, This study presented CIMS(construction information classification system) reflected the characteristics of facility classification - functional component classification - functional component classification - work classification - resource classification. Based on this system. this study presented how to establish PMMB(performance measurement management baseline) with proposed master target equation which analyzed the trend of performance measurement management baseline and proposed work target equation which analyzed the execution results. Finally, this study presented NOS model that can be applied to fixed price method and cost plus fee method through the theoretical verification of executive performance analysis method.

On the Forest Development Act (a Proposal) and Law of Forest Development Fund (a Proposal) (산림개발법(안)(山林開發法(案)) 및 산림개발(山林開發) 금고법(안)(金庫法(案))에 대(對)하여)

  • Park, Tai-Sik;Lee, Eung-Rae;Shim, Chong-Supp
    • Journal of the Korean Wood Science and Technology
    • /
    • v.10 no.3
    • /
    • pp.200-200
    • /
    • 1982
  • 1. 전국의 산림은 산림개발의 유행에 따라 마음과 같이 3개권역으로 구분한다. 가. 용재림 개발권 주요산맥을 연하는 오지대(奧地帶) 나. 풍치림 개발권 고속도변(좌우 4km범위) 도시주변 공원지구, 기타 토지대 다. 농용림 개발권 전 가, 나 속에 속하지 않는 야산지대 2. 3대 개발권별로 우선 개발할 지역을 연차적으로 지정한다. 3. 개발지역을 지정시는 미리 산림의 용도를 구분하여 시정 고시한다. 4 개발지역내의 산주는 개발우도에 따라 개발의무를 진다. 5. 산주가 개발의무 불이행시는 대집행(代執行)으로 개발을 수행한다. 6. 대집행(代執行)은 가. 산림개발공단 나. 산림 경영을 하고 있는 능력있는 개인 또는 법인 다. 산림조합(산련, 산림포함)으로 하며, 산림청장이 지정한다. 13. 개발지역 내에서의 확정된 개발계획은 기존영림 계획에 우선한다. 14. 개발지역 내에서의 개발사업 수속절차는 이 법으로 일원화 한다. 7. 산주가 대집행자에 대하여 비용변상이 없는 한 이 양자간에는 수익(收益) 분배를 하여야 하며, 본계약의 장기 보장을 위하여 저당권 설정을 한다. 8. 산림개발의 중추적 대집행자인 동시에 경영자로서 시범적이며, 집단적인 산림개발과 임도시설 관리를 전담하는 산림개발 공단을 설립한다. 9. 장기처리와 융자지원을 위하여 산림개발 자금을 200억원 한도로 설치하고 이의 관리 운영을 전담할 산림개발 금고를 별도 법율로서 설립한다. 10. 산림개발 기금은 다음 재원으로 조성한다. 가. 국유임야 관리 특별회계의 잉여금 나. 임목의 벌채자 및 원목 수입이용 가공 판매자에 과하는 기금부담금 다. 매년 정부 예산에서 정하는 재원 11. 개발지역내에서는 취득세, 소득세, 등록세, 상속세, 양여세, 기타 공과금의 감면등 세제상의 특전을 부여한다. 12. 개발지역내에서의 산림도벌 무허가벌채등 산림 사범은 가중 처벌한다.

  • PDF

The Study on Application of Fast Track Method for Dam Project Life Cycle′s Analysis (댐 공사에서의 Fast Track을 적용한 생애주기분석에 관한 연구)

  • Yoon, Jae-Ho;Moon, Young-Il
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.715-724
    • /
    • 2003
  • It is true that SOC facilities, such as dams, need long life cycles since more time has to be invested for the phases of planning, examination, feasibility study, design, contract, construction, and maintenance. This longer life cycle is easily exposed to the risk. And thus, brings additional cost by the delayed project, convenient loss according to the additional run of use, and benefit lose of not to using the facilities. So, the purpose of this study is to try to find a solution to reduce these time consuming problems which could diminish the whole national competition. Hence, this study is to show efficient, systematical project performance and network model by using reciprocal analyses between the construction period and cost based on economical analysis of each phase of life cycles. In addition, on the basis of these outputs, the Fast Track Method is suggested as an alternative solution as a new Approach in Life Cycle's Analysis.

The Improvement of Work Structure in the Private Investment SOC Project (민자 SOC사업의 시공단계 업무체계 개선방향)

  • Kim Daejin;Shin Seungtae;Lee Younghwan;Woo Sungkwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.486-489
    • /
    • 2004
  • To enlarge the international competition and construction productivity, the domestic construction market attracts the private capital and expands the facility of :iocial Overhead Capital(SOC). However, the application of the business system used at the public project didn't utilize the effect of social overhead capital. It caused problems that parties' business was inefficient and their allotment of the risk was inadequate. This paper presents the course to reorganize the business system which the coincides with the origin aim of the SOC. For the reformation of the supervisor's work scope and business system and the government's overall project management, in other words, this paper proposes the professional organization to replace the superintendence and the formation of optimal business system. This paper confirms the privity of contract among parties of SOC project and parties' work scope and system between relative laws and concession agreement that government made a contract with Special purpose Company (SPC).