The composite system, which is consisted of the steel girder and reinforced concrete column has some advantages in the structural efficiency and the construction productivity by complementing the shortcomings between the two materials. This research is aimed at the development of the composite beam-column connection system by which the steel beam can be connected to the R/C column with smooth stress transfer. And, to ensure safety of this system, the tests of moment and shear resisting performance have been carried out for actual size specimen. From the test, the connection system has been preyed to take good resistance and stress transfer between steel girder and reinforced concrete column.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.187-192
/
2001
High-Rise Building Construction Project which has high uncertainty and complexity, causes lots of problems under construction. In particular, the integration between design phase and construction phase highly affects a construction project in terms of cost and time. To possibly make the flexible response and preliminary verification against the construction planning problems in high rise building project, this paper proposes the Engineering-Construction Management System based on 4D CAD that put the time factor together with 3D CAD. The usefulness of this system has been verified through the actual project. It could helps the reducing trials and errors during construction phase by catching the factors on problems of project. Ultimately it will allow users to save project cost and duration by field application.
Kim, Seon-Hyung;Lee, Won-Suk;Kim, Sun-Kuk;Lee, Dong-Hoon
Journal of the Korea Institute of Building Construction
/
v.10
no.5
/
pp.11-20
/
2010
With the amendment to the Building Act in November of 2005 that offered incentives in terms of floor area ratio and number of stories to apartment buildings adopting the Rahmen structure to facilitate remodeling, the construction industry is paying more attention to PC structures. As connections between PC columns and beams require complex design, it is very difficult to install and remove forms. Since forms made of plywood for such connections are fabricated and installed on site, a significant amount of labor is required, and constructability is low. Furthermore, after concrete casting, the forms are removed in a state in which they cannot be recycled, which leads to a significant amount of construction waste. For this reason, a solution to address such issues needs to be studied. However, many researchers have focused only on the structural performance of PC structures in Korea and elsewhere, ignoring the need for research on the forms used in building PC structure connections. Therefore, this research aims to develop a form that can improve the productivity of PC structure connection construction, and compare it with conventional forms to highlight its contribution to gains in productivity and economic viability.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.548-553
/
2006
Activity-based productivity data can be used as an significant reference in many areas of project management such as performance evaluation and project planning. However, the existence of various factors influencing construction productivity makes it difficult to collect and analyze the productivity data. In the most of the domestic construction sites, there is no systematic method to collect and analyze the productivity data along with information on influencing factors; it is common to heavily rely on experience and intuition of field managers when dealing with construction productivity data. Therefore it is necessary to develop a management system for collecting and utilizing the productivity data as well as the factors influencing construction productivity. The main objective of this research is to define the construction productivity and its influencing factors at the activity level. In addition, methodologies on how to analyze the productivity data and to estimate productivity of future projects are proposed.
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.1
/
pp.153-166
/
2017
Recently, the construction industry has been pursuing economical construction by introducing improved construction equipment and methods. However, in many cases, the equipment operation according to the intuition of the field manager and in the manner of traditional methods impedes the increase in effectiveness in terms of productivity and economy. The performance of new construction equipment has rapidly improved; however, the maximum effect of mechanized construction cannot be obtained unless the effective management and operation methods are implemented. According to the expert survey, it has been discovered that the problems of conventional construction equipment operation methods can be classified into several categories: allocation of construction equipment that is not suitable for the construction work, the combination of equipment that does not take into consideration real-time field situations, the decline in the skill of the construction equipment drivers, and lack of real-time access to necessary information. This paper proposes a construction equipment management system to solve these problems. The construction equipment management system can provide a method to maximize the work rate of the construction equipment fleet by developing an equipment allocation plan based on field conditions, whenever necessary, and transferring this information to the construction equipment drivers in real time. Ultimately, it is believed that the application of the construction equipment operation system in the field will make it possible to reduce carbon emissions by improving productivity and reducing fuel consumption.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.938-942
/
2007
The importance of process improvement under construction has arisen from recent issue, lower productivity in the construction site. The various 3D modeling program is utilized in the procedure of construction as an alternative solution. However, it's still shortage of the consideration about a specific technical application. The purpose of the study in this paper is helpful to improve the productivity of construction site using 3D realization of constructing place as one of extensive modeling technologies, which leads to not only efficient management of construction site allowing people to check the real time situation in the place but also the revitalization of information flow about building process control and prgress, Therefore, I research into modeling algorithm and extensive construction site realization technology. 3D realization of building place would reduce the safety concerns by providing the real time information about construction site, and it could help to access easily to similar project through collecting and appling the database of sites. Furthermore it can be an opportunity to develop the procedure of production in construction industry and to upgrade the image of this field.
Kim, Yun-Sik;Cho, Jae-Kyong;Kim, Min-Ji;Cho, Kyu-Man;Hyun, Chang-Taek
Journal of the Korea Institute of Building Construction
/
v.10
no.2
/
pp.33-40
/
2010
Recently, the scale of construction work has been growing, and buildings are becoming higher. To enable greater efficiency of construction work, the use of vertical transportation equipment has been radically increasing. In this context, many studies have been conducted on tower cranes. While these studies have discussed issues such as the selection of tower cranes, the optimization of locations, and the hoisting time of tower cranes, there has been no research on the installation of tower cranes. As such, the installation of tower cranes on construction sites has been accomplished based on subjective judgment and technical assistance, and the experience of workers in equipment companies. Therefore, this study analyzes the productivity of tower cranes using simulation methodology, and proposes a generalized model of the installation process of tower cranes in order to offer a basic resource that site managers can directly utilize.
지하에 설 치된 맨홀의 구조물이 노후되거나, 내부에 수 용된 시설물로 작업 공간이 협소하여 맨홀 구조물을 대개체 할 펼요가 있을 경우, 지금까지는 대부분 현장 콘크리트 타설에 의한 방법을 사용하였다. 이러한 방법은 거푸집 시공, 콘크리트 타설, 콘크리트 양생, 거푸집 철거 등의 공정이 소요되어 공사 기간이 장기화 되고, 도심지에 위치한 맨홀인 경우에는 차량과 보행자의 통행 불편을 초래하기도 하였다. 또한, 통상적으로 사용되고 있는 프리캐스트 맨홀에 비해 시공 품질이 낮아 향후 맨홀의 운용 및 유지관리에 많은 어려움을 겪는 원인이 되기도 하였다. 본 논문에서는 이러한 문제점들을 해결하기 위해, 폴리머 콘크리트를 이용하여 하부, 벽체, 상부로 구성된 다수의 세그먼트를 생산한 후, 현장에서 이들 세그먼트를 조립하여 맨홀을 설치하는 방법을 연구하였다. 가변형 거푸집을 이용한 세그먼트 제작과 조립식 블록에 의한 관구를 사용하여 현장 적용성을 높임은 물론, 프리캐스트로 생산되는 폴리머 콘크리트 맨홀 수준의 시공 품질을 확보할 수 있도록 하였다.
본 논문에서는 선체 설계 시에 의장 장비의 설치를 위해서 시공되는 의장홀이 생성되는 과정 및 이에 관련해 업무부서 간에 발생되는 각종 프로세스에 관해서 알아본다. 의장홀의 설계는 설치되어야 하는 의장 장비와 이미 설계되어 있는 선체 구조물을 바탕으로 의장 부서에서 이루어지지만, 선체 구조물에 직접 시공은 각종 제한 조건의 검토가 필수적이며 충분한 고려 후에 선체 부서에서 수행된다. 의장 설비의 특성상 해당 작업은 설계 및 생산과정에서 빈번하고 반복적으로 발생되고 선체 설계에 있어서 큰 병목현상을 발생시킨다. 본 논문에서는 의장홀 시공에 필요한 다양한 프로세스와 정보의 흐름을 자동화하여 조선 설계 및 생산의 효율성을 향상시키는데 기여 하고자 한다.
Proceedings of the Korean Information Science Society Conference
/
2010.06b
/
pp.144-147
/
2010
국토해양부에서는 건설산업의 투명성을 제고하고 생산성을 향상시키기 위해 1990년대 후반부터 건설사업정보화(CALS : Continuous Acquisition and Life-cycle Support) 사업을 진행중에 있다. CALS는 제조업의 모든 상품, 즉 주요장비 또는 다양한 상품 등을 획득하기 위한 설계, 생산과정, 또는 보급, 조달 및 이를 운영하는 운용지원과정을 연결시키고, 이들 과정에서 사용되는 각종 정보를 표준이라는 공통 창구를 통해 디지털화하여 컴퓨터상으로 정보를 통합하여 자동화시키는 개념이다. 이는 컴퓨터 네트워크를 이용해 상호 교환이 이루어지는 자동화되고 통합된 환경으로 변환시키는 정부와 기업간의 경영전략이라고 볼 수 있다. 이러한 개념에서 확장된 건설CALS는 건설공사 전 과정, 즉 기획, 설계, 조달, 시공, 유지보수 등의 과정에서 발생하는 각종 정보를 다양한 이해당사자가 교환하고 공유하기 위한 개념으로 출발하였으며, 현재 이를 지원하기 위한 5개의 단위시스템을 개발하여 운영중에 있다. 이중 용지보상시스템은 건설공사의 업무중에 시공단계에서 이루어지는 보상업무를 지원하는 시스템이다. 보상업무는 건설사업 과정 중에서 민원인과 직접대면하는 일이 많고, 액수도 클 뿐만 아니라 개인의 소유권과 밀접한 관계가 있기 때문에 분쟁의 소지가 매우 많다. 이에 본 논문에서는 보상업무 수행시 다양한 이해당사간의 각종 보상자료 교환체계 확립을 통한 업무 선진화방안 제시를 통해 업무의 투명성을 최대화하고 민원을 최소화하여, 보상업무 담당자에게는 업무의 효율성을 제고하고 민원인들에게는 국가행정에 대한 신뢰도를 높일 수 있는 보상업무 선진화 방안을 제시하고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.