1 |
Elazouni AM, Ali AE, Abdel-Razek RH, Estimating the
Acceptability of New Formwork Systems Using Neural
Networks, Journal of Construction Engineering and
Management, 2005;131(1):33-41.
DOI
ScienceOn
|
2 |
Hanna AS, Willenbrock JH, Sanvido VE, Knowledge
acquisition and development for formwork selection
system, Journal of Construction Engineering and
Management, 1992;118(1):179-198.
DOI
|
3 |
Jeong BJ, Hong KP, Ha SW, The Flexural Behaviour
of Reinforsed Concrete Beams with Precast Lighr
Weight Concrete Formwork, Journal of the
Architectural Institute of Korea, 2009;25(5):95-102.
|
4 |
Son JH, Seok HS, Lee SH, Park JW, Simulation
Analysis of Productivity and Economic Efficiency of
the PC and Steel Structures According to the
Beam-Column Connection Type, Journal of the
Architectural Institute of Korea, 2009;25(7):137-144.
|
5 |
EL DEBS MK, Montedor LC, DE HANAI JB,
Compression tests of cement-composite bearing pads
for precast concrete connections, Cement & concrete
composites, 2006:28(7);621-629.
DOI
ScienceOn
|
6 |
Kim TH, Lee HM, Kim YJ, Shin HM, Performance
assessment of precast concrete segmental bridge
columns with a shear resistant connecting structure
shear resistant connecting structure, Engineering
Structures, 2010.
DOI
|
7 |
Ahn YS, Lee LH, Survey and Analysis on the Work
Process and Working Time Characteristics of
Formwork Operation, Journal of the Architectural
Institute of Korea, 1993;9(3):191-196.
|
8 |
Kang SM, Kim OJ, Domestic and Foreign Present
Situation Analysis of a PC Method, Daelim Technology
Research Institute, 2006
|
9 |
Park CL, Kim MH, Chung IY, An Experimental Study
on the Structural Properties of Beam-Column Joint
Using Half Precast Beam, Journal of Construction
Engineering and Management, 1994;10(3):117-125.
|
10 |
Lim JH, Lee KM, Moon JH, Lee WH, Kim SY, Lee KC,
Structural Capacity Evaluation of Precast Concrete
Joints used for Underground Parking System, Journal of
the Architectural Institute of Korea,2008;10(2):265-274.
|
11 |
Yoo DH, Lee HB, Ahn JC, Kang BH, A Study on the
Economical Analysis of the Composite Precast Concreate
Method, Journal of Construction Engineering and
Management, 2007:113-118.
|
12 |
Yang SW, Cho HH, Kang KI, Development and
Application of Unit Table Form using Euro Form for
High-rise Building Construction, Journal of the Korea
Institute of Building Construction, 2008;8(2):45-53.
DOI
|
13 |
Hyun KM, Choi IW, Kim OK, Development of the
form-work system for quality improvement on the
kick-up of wall in the apartment house construction,
Journal of the Architectural Institute of Korea,
2005;21(4):173-178.
|
14 |
Kim SH, Choi JH, Kim SK, Lee DH, Improvement Plan
for Connecting Form of PC Member -Focused on
Apartment Buildings-, Journal of the Korea Institute of
Building Construction, 2010;10(1):9-12.
|
15 |
An SH, Lee UK, Kang KI, A Study on the Proposal
about the Improvement of PC in Construction Industry,
Journal of the Architectural Institute of Korea,
2004;20(7):133-140.
|
16 |
Kim TH, Kim OJ, Kim GH, Lee DB, An Analysis of
Rapid Construction and Productivity of Formwork
System by Using Aluminum Panel Form System with
Dropping Beam, Journal of the Architectural Institute of
Korea, 2008;28(1):523-526.
|