• Title/Summary/Keyword: 시공 단계

Search Result 1,340, Processing Time 0.03 seconds

Improving Constructability Analysis Tasks by Applying BIM Technology (시공성 분석업무 개선을 위한 BIM 기술의 적용방안)

  • Park, Chan-Sik;Park, Hee-Teak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.137-146
    • /
    • 2010
  • Becoming construction projects larger and more complicated, and utilizing more varied and complex contracting and delivery systems in the industry, integrating information and managing constructability from project inception to completion became the most critical tasks for the successful project management. However, current industry practices of constructability analysis which are too much dependent on field engineers and managers' experiences, are not performed efficiently and also not managed effectively. Then the scope, method, and procedure in performing analysis tasks are not certain as well as not systematic, In addition, due to using 2D based drawings and documents, information required at project phases for the analysis is inconsistent and inaccurate. This study aims to suggest the use of BIM technology and functions for solving various problems of current constructability practices. In particular, constructability analysis tasks performed at design and construction stages are identified and their adaptability, applicability, and benefits of BIM are investigated through interviews on constructability and BIM professionals in the industry.

CM으로 효율적인 건설안전관리 체계구축 방안에 관한 연구

  • 김영수;안병수;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2002.05a
    • /
    • pp.23-30
    • /
    • 2002
  • 최근 우리나라의 건설산업은 Project의 규모가 대형화됨에 따라 기계화 시공 신공법 도입등 공정작업이 다양해지고 새로운 방법들이 많이 시도되고 있으며 건설산업도 기획, 설계, 발주, 시공, 유지관리라는 연속적 단계를 통하여 각 단계가 상호 유기적 연관성을 가지므로 건설현장의 근원적 안전성 확보를 위해서 건설 시설물의 Life cycle 전 단계를 걸쳐 안전관리 개념과 기법이 도입되어야 한다. 따라서 본 연구에서는 CM에 의한 단계로 안전성 확보에 주력하고 미국 CMAA의 단계별 기능별(phase, 6Function) 업무내용에서와 같이 Safety Management를 한다. 또한 CM제도 정착에 따른 초기단계를 규정하는 안전관리 법령 재정을 하여 단계적으로 자율적 안전 관리를 유도하여 재해예방을 하도록 해야한다.

  • PDF

Application of Partnering and Constructability in the Design Development Phase of Public Design-Build Projects (공공부문 일괄사업 실시설계단계의 파트너링과 시공성 분석 적용방안)

  • Nam, Yong-Ho;Yeon, Hee-Jung;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.531-534
    • /
    • 2007
  • In the current domestic design-build contract, design and construction are separated due to prohibition of outside work. but instead the design-build contract adopts a method of fulfilling each assignment as a joint venture, which makes it difficult for participants to communicate each other and often require changes of design. also, It is difficult to performance efficiency project that they don't want to share useful information related to design and construction. In this study suggests how to maxmize the effiency of the project by proposing a process model connected with an efficient partnering and constructability in a deign development phase of design-build constract.

  • PDF

Considerations in the early stage of Designing the Unit Modular Building (유닛모듈러 건축물의 설계 초기 단계에서의 고려 사항)

  • Lee, Young-Ho;Lee, Du-Heon;Kim, Kyoon-Tai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.133-142
    • /
    • 2012
  • With the recent changes in building environments such as low-carbon green growth, there have been increasing demands for the new building system that is eco-friendly and can maximize efficiency such as the unit modular system. For the unit modular system, more than 80% of the whole process is carried out in the factory while in the field, mostly unit module assembling and finish work are done. Thus, the quality at the pre-construction stage when design and manufacturing are done determines the quality of the building as a whole. In the country, the unit modular method was first applied in 2003 to school buildings and has gradually expanded afterwards, but due to the lack of examples and related information as well as the small scale of modular manufacturers, its characteristics have not been sufficiently reflected in design, manufacturing and field constructions. This study, as an attempt to improve the design quality of unit modular buildings, points to the problem in manufacturing and field construction, compares and analyzes its causes, and suggests major points to be considered in the early stage of designing the unit modular buildings.

Analysis on Learning Effects of the Education Program Applying the Team-based Learning Method for Building Construction (팀 기반 학습을 이용한 건축시공 교육의 학습효과 및 만족도 분석)

  • Kim, Jae-Yeob;Won, Jongsung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.1
    • /
    • pp.101-109
    • /
    • 2017
  • This study aims to quantitatively analyze impacts of the team-based learning (TBL) method on learning of architectural engineering students. A TBL-based education program, consisted of preparation, readiness assurance, and application phases, was proposed by considering characteristics of architectural engineering education in South Korea and was applied in building construction classes. In order to measure learning effects and satisfaction levels of the proposed TBL-based education program, a set of questionnaires was conducted with students who took the building construction classes. As the results, learning effects and satisfaction levels of the TBL-based approach were higher than those of traditional approaches. Individual and team readiness assurance tests in the readiness assurance phase were the most effective and satisfactory items, while assessment in the application phase was the least effective and satisfactory item.

Evaluation and Adjustment of Lateral Displacement of Complex-shaped RC Tall Buildings Considering the Displacement by Tilt Angle of Each Floor (층경사각에 의한 횡변위를 고려한 비정형 고층건물의 횡변위 평가/보정)

  • Kim, Yungon
    • Journal of the Korea Concrete Institute
    • /
    • v.27 no.5
    • /
    • pp.551-558
    • /
    • 2015
  • Lateral displacement in the most complex-shaped tall buildings is caused by eccentric gravity loads which are induced by the difference in location between a center of mass and a center of stiffness. The lateral displacements obtained from analysis, using conventional procedures, are prone to overestimate the actual values because much of realignment efforts made during construction phase are ignored. In construction sequence analysis, the self-leveling of slab and the verticality of columns/walls could be considered at each construction stage. Moreover, the displacement compensation can be achieved by manual process such as re-centering - locating to global coordinates through surveying. Because the lateral displacement increases with the building height, it is necessary to set up adjustment plan through construction stage analysis in advance in order to result in displacements less than the allowable limits. Because analytical solution includes lots of assumptions, the pre-adjusting displacement should be reasonably controlled with considerations for the uncertainty due to these assumptions.

A study on the Development of the Building Facade Panelizing Technologies in use of Architectural Geometry Control (3D 엔지니어링 설계 도구를 활용한 비정형 건축물의 외장제작 도면화 개발에 관한 연구)

  • Choi, Jeong-Min;Kuea, Soon-Ho;Ko, Ki-Woong;Kim, Dai-Ock;Ock, Jong-Ho
    • Proceedings of the KAIS Fall Conference
    • /
    • 2009.05a
    • /
    • pp.565-570
    • /
    • 2009
  • 국내의 비정형 건축물은 현재 도입기로, 동대문디자인파크, 전곡선사박물관, 부산국제영화센터 등이 건설 계획 되어지고 있지만 대부분이 실시설계 또는 착공단계에 머물고 있고, 아직까지 구체적인 시공단계에 이른 건축물이 없는 실정으로 비정형외장재의 이중곡률 (Non-Uniform Rational B-Spines)을 반영한 프로토타이핑(Prototyping), 패널화(Panelizing), 현장조립 시 기하학 통제기법, 시공오차 측정기법, As-Planned 도면과 As-Built 도면의 비교를 통한 준공도면의 작성기법 등에 대한 준비가 절실히 필요한 상황이다. 그러나 현재 비정형 건축물의 설계는 초기계획(Concept Design) 단계에서 건축가와 구조기술자의 협업 중요성만 강조되고 있고, 건축물이 비정형화됨에 따라 기하학적으로 설계 및 시공되어야 하는 건축물의 외장재에 대한 설계방법과 시공단계에서 시공품질 확보방안, 시공 하자를 유발시키는 다양한 변수에 대한 대응방안 등은 아직까지도 그 중요성을 인식하지 못하고 있는 실정이다. 따라서 본 연구에서는 비정형 건축물의 설계에 사용되는 Architectural Geometry Control 도구 중 그 활용성이 부각되어 지고 있는 Bentley 사의 Generative Components를 활용하여 비정형 건축물의 이중곡률 곡면외장재의 부재생산을 위한 패널화, 제작도면 추출에 관한 연구를 수행하고자 한다.

  • PDF

Three Dimensional Construction Stage Analysis and Deformation Monitoring of a Reinforced Concrete Highrise Building (철근콘크리트조 초고층건물의 3차원 시공단계 해석 및 시공중 변형 계측)

  • Jeong, Daegye;Yu, Eunjong;Ha, Taehun;Lee, Sungho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.6
    • /
    • pp.573-580
    • /
    • 2014
  • In this paper, axial strains and lateral displacements of columns in a 58-story reinforced concrete building were measured using vibrating wire gauge and laser scanner, respectively, and compared with predicted values. Predictions were obtained using ASAP, which is a 3D construction stage analysis program developed based on PCA report. Comparisons indicated that columns in the middle of floor plan showed good correlation with predictions. However, the columns in the corners showed some deviations. Lateral displacement of columns between measurement and estimation showed similar trends but considerable deviations, which are seemingly caused by construction error of column faces, and inaccuracy in differential vertical displacement prediction.

Investigation of Optimal Construction Procedures for Concrete Underpass Structures Considering Heat of Hydration (수화열을 고려한 콘크리트 지하차도 적정 시공법 분석)

  • An, Zu-Og;Kim, Seong-Min;Kim, Dong-Ryun
    • International Journal of Highway Engineering
    • /
    • v.11 no.2
    • /
    • pp.229-238
    • /
    • 2009
  • This paper describes the methods to propose the optimal material properties and construction steps that prevent cracks due to the thermal stresses induced by the hydration heat under the construction of the concrete underpass structures. To achieve the goal of this study, the heat transfer theories were employed and the three-dimensional finite element model of the underpass structure was developed and used for the structural analyses. If the volume of the concrete member that is placed at one time is significantly large, the member is assumed to be the mass concrete and is easy to induce cracks. In order to minimize the cracks during the construction, two different methods can be utilized: one is to arrange the construction steps optimally and the other is to change the materials to reduce the probability of the crack occurrence. In this study, the analyses were performed by considering the changes in material properties with time, the characteristics of the hydration heat generation for cements and admixtures, the volume of the concrete placement at one time, and the environmental conditions.

  • PDF

A Preliminary Study on the Analysis of Constructability Issues in High-Rise Office Buildings (고층사무소 프로젝트의 시공성 항목 분석에 관한 기초연구)

  • Kwon Dong-Hyuk;Kim Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.235-238
    • /
    • 2002
  • The successful completion of a construction project requires a thorough understanding of all stages and phases of the project, and enhanced through integration of design and construction during the pre-construction stage. Constructability is a major factor in measuring the success or failure of construction project. During the pre-construction stage, lack of construction knowledge integration in the planning and design process is a major factor that leads to constructability problems during the construction stage. this study is to find out such problems based on interview and questionnaire in the structure's work of High-Rise Office Buildings. The objective of this study is to Identify Impact aspect of the structure's work of High-Rise Office Buildings.

  • PDF