• Title/Summary/Keyword: 시공현황

Search Result 417, Processing Time 0.024 seconds

Development of Reliability for Conceptual Cost Estimates in Construction Projects (건축프로젝트 개산견적 신뢰도 향상 방안)

  • An, Sung-Hoon;Kang, Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.175-180
    • /
    • 2006
  • Total conceptual cost estimates and the assessment of the reliability of these estimates are critical in the early stages of a building construction project. The purpose of this study is to propose the method to clients or estimators for improving the reliability of conceptual cost estimates by evaluating the reliability of conceptual cost estimates. The data from 83 building construction projects were collected for this study. The results showed that the proposed method can propose alternatives to clients or estimators for improving the reliability of conceptual cost estimates with the process of evaluation, review and feedback. This process can assist clients in their evaluation of the reliability of the estimated cost and the probability of exceeding the target cost, and in their re-estimation after dealing with the elements that influence the conceptual cost estimate badly.

  • PDF

Strengthening Plant Market Competitiveness in the Construction Firms;A Corporate Strategy (해외 플랜트 건설 분야의 현황 분석을 통한 경쟁력 강화전략 도출)

  • Lee, Tai-Sik;Lee, Kkoch-Nim;Koo, Ja-Kyung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.317-321
    • /
    • 2006
  • Construction companies do not take necessary steps for sudden change in the Construction market, In order to over come the problem, it is necessary to make Corporate Strategy through correct Market analysis. If construction companies want to secure continuance profits, they must prepare proper strategy to advance into plant market. This research performs both external and internal environment analysis, External environment analysis is for overseas construction market and advanced foreign companies, and internal environment analysis is the current status of domestic companies. The research identifies some of the Key points, growth in foreign plant market is huge, but domestic companies do not have abundant construction experience on the same field and also they lack in high value-added techniques. They are far behind the advanced companies; they don't have proper skills of Procurement, engineering and project management. This study suggests a strategy for domestic companies to take necessary step to advance into plant construction market.

  • PDF

A Study on the Status and Major Achievements on Mine Subsidence Prevention Technology (광해방지 지반침하방지 기술개발 추진 현황 및 주요 성과)

  • Yang, In Jae;Lee, Seung Ah
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.357-365
    • /
    • 2017
  • The mine subsidence prevention technology has been promoted based on the field test for design, construction, automation measurement and monitoring optimized for investigation, design and mine-filling efficiency customized in Korean mining environment. Based on the R&D roadmap ('07~'16) of the 1st and 2nd stage, mine reclamation technology development has been focused on developing method of evaluating subsidence stability, development of filling material and optimum filling technology, and development of measuring instrument. In the future, in order to systematic management for the subsidence risk areas, we intend to enhance technological capabilities and strengthen the technological infrastructure for business promotion in parallel with the discovery and introduction of new technology to prevent subsidence in the 4th Industrial Revolution era.

Correlation Analysis Between Crack and TQI in RC Slab Track (철도콘크리트 슬래브 궤도상의 균열과 TQI 상관성 분석)

  • Kwon, Sae Kon;Park, Mi Yun;Kim, Doo Kie;Park, Jae Hak
    • Journal of Korean Society of Disaster and Security
    • /
    • v.5 no.2
    • /
    • pp.71-79
    • /
    • 2012
  • Recently, in the total railroad construction field, the concrete slab track is adapted, not ballast track. Because the ballast track have the characteristics doing the ongoing maintenance and difficult to handle increasing maintenance costs, eventually the concrete slab track is selected as an alternative. However, owing to the hydration heat reactions and temperature affected shrinkage cracks related to concrete itself, a variety of studies to solve maintenance problems related to concrete slab track are underway. This study analysed characteristics of TQI values evaluating the track irregularity, searched the relationship between crack progress and TQI, and then evaluated of the correlation between the two values. Through this method, there is a need to complete the problems of the current method, only TQI is the main decision making tool in track maintenance, and also the need for the development of evaluation index considering the crack.

Service Life Prediction and Carbonation of Bridge Structures according to Environmental Conditions (환경 조건에 따른 교량구조물의 탄산화 현황 및 내구수명 예측)

  • Kim, Hun-Kyom;Kim, Sung-Bo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.126-132
    • /
    • 2010
  • Carbonation is the results of the interaction of carbon dioxide gas in the atmosphere with the alkaline hydroxides in the concrete. Reinforced steel corrosion due to concrete carbonation is one of main factors on the decrease in durability of RC structure. This study investigates the influence of carbonation on the bridges under various environment condition and quantifies the effect of carbonation various domestic field data. The failure probability of durability is evaluated on the basis of reliability concept. In addition, service life of the structures is predicted based on the intended probability of durable failure in domestic concrete specification. According to experimental results of the carbonation depth, the carbonation depth increased with structural age. It is analyzed that carbonation velocity of the structures under urban area and sea condition is 1.6-1.9 times faster than the river condition. Service life of the bridges under urban area and sea condition is decreased about 2.4-3.3 times than river condition.

Design Improvement of the Road Expansion on a Deep Thick Soft Ground (대심도 연약지반 도로확장 공사에서의 설계 개선)

  • Kim, Tae-Hyung;Park, Tae-Young;Kim, Sung-Ryul;You, Sang-Ho;Kim, Kook-Han;Kim, Yun-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.8
    • /
    • pp.89-99
    • /
    • 2012
  • The expansion of a road on soft ground could induce an additional settlement to the existing road because of the consolidation characteristics of the soft soil layer subjected to additional load by an adjacent banking. In such case, the existing road could be faced with various problems during the stages of the construction and maintenance, such as deterioration of not only the surface smoothness yielding the decrease in automobile performance safety but also the structural stability of the embankment. These kinds of problems are expected to occur more freguently especially for the deep ground level with a fairly thick soft soil layer. Therefore, they should be examined and studied adequately during the design stage. As a reference case study, this paper deals with the project named Namhae Expressway of 2nd Branch with the soft soil layer with the thickness upto about 50m. After a lengthy review of the original design, an improved design is proposed.

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.

  • PDF

An Analysis and Improvement of Progress Payment Regulations in Korea Using System Dynamics - Focusing on Public Construction Industry - (시스템다이내믹스를 이용한 국내 기성금 제도 현황 분석 및 개선방안 제시 - 공공건설분야를 중심으로 -)

  • Park, Moon-Seo;Lee, Jeoung-Hoon;Lee, Hyun-Soo;Hwang, Sung-Joo;Kim, Soo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.148-159
    • /
    • 2012
  • Recently construction companies' capital condition has been aggravated due to low profit, fierce competition and market contraction. For this reason, the companies rely on public construction projects that protect construction fee by regulations. Despite these regulations, problems regarding progress payment are constantly happening. Also, insufficient analysis on interaction between contractors makes policy making difficult. Thus, in this study, interaction between contractors are quantitatively determined according to delay of application and payment based on current public construction regulations on construction stage. A system dynamics model is used, which analyzes the problems based on an interaction between contractors, and solutions for progress payment application and payment delay are suggested according to the research results.

Methods of Ensuring Safety for Integrated Fire Protection Shutters at Elementary and Middle Schools (초등학교 및 중학교의 일체형 셔터 안전성 확보 방안)

  • Youn, Hae-Kwon
    • Fire Science and Engineering
    • /
    • v.30 no.5
    • /
    • pp.36-45
    • /
    • 2016
  • Integral fire shutters are installed indiscriminately, regardless of evacuation. There is always the risk of an accident because integral shutters are applied mainly to corridors, passages, and stairs of schools This study evaluated the problem of integral shutter's entrance, evacuation, construction management, and maintenance control through a fire shutter accident case, including present condition of fire shutter installed at school of Okgil, Bucheon and Dongtan, Hwaseong. The results suggest that emergency lighting or signs for passage be set up to check location of entrance easily and install obstruction sensors at fire shutter to reduce life damage. In addition, the number of efficiency tests of fire shutters should be increased by running a trial test monthly or weekly to maintain the performance of fire shutter. Schools need to install a fire shutter- applied sprinkler at the entire floor.

Suitability Assessment and Maintenance Planning of the Guided Drainage Method on Underpass Structure (유도배수공법을 적용한 지하차도 설계 및 유지관리방안)

  • Jin, Kyu-Nam;Lee, Jung-Min;Kim, Young-Jin;Park, Jae-Hyeon;Cho, Gye-Chun
    • Land and Housing Review
    • /
    • v.3 no.1
    • /
    • pp.97-109
    • /
    • 2012
  • For the design of underpass structures, -1.0m(G.L) ground water level guideline for the design of railway, subway, utility tunnel etc, is still being used in Korea. As a result, the underpass structure can be forced by buoyancy, and therefore the in-situ buoyancy anchor method is usually being applied to prevent the uplifting force. For the Yeongjongdo sky city project, the drainage method was applied to remove the buoyancy force. In this study we estimate the efficiency and safety of the applied design and propose the detailed guidelines for standard design and maintenance of the guided drainage technique. Especially, the auxiliary pumping well was operated to maintain the ground water level around the underpass. In the study site, the applied guided drainage method has advantages in both engineering and economic aspects.