Heavy Equipment Management Plan for BIM-Based Construction Project (BIM을 적용한 건설공사 중장비 투입 계획 방안)

  • Kang, Kyoung-Hwan;Kim, Sang-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.171-174
    • /
    • 2010
  • Recently, our construction industry progress using the BIM system in the construction designing part. However, there are not preparing government policy about BIM even if there are many good things using BIM system on planning of heavy equipment. Therefore, planning for a input system of heavy equipment using BIM will be a kind of first challenge in this part. However, we've tried using strength point of BIM system to make better condition of our construction fields. So this study will be expected to shorten the construction time and using heavy equipment effectively.

  • PDF

A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

해외건설공사 수행절차(5)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.10 s.219
    • /
    • pp.48-50
    • /
    • 2008
  • 해외건설공사를 성공적으로 수행하기위해서는, 낙찰통보전 낙찰가능시점부터, 현장소장을 비롯한 현장준비팀을 조직 운영하여, 계약서류상의 각종 요구사항, 승인사항, 인 허가사항, 현지법,공법,계약조건, 공정계획, 인원소요계획, 장비소요계획 등을 검토 한다. 또 현장답사 등을 통하여 견적시에 계획되고 작성된 모든 내용을 검토 보완, 수정 및 Update함과 동시에,선발대를 현장에 투입해 발주자로부터 현장을 인수하고 가설공사를 시작하며 조기착공에 서두른다. 단, 현장투입 전 발주자로부터 접수한 Letter of Intent(낙찰/계약의향서)상의 착공관련 조건을 확인하거나 Notice to Proceed(착공지시서)의 접수를 확인해야 한다. 시공자의 입장에서 건설공사의 궁극적인 목표를 이익의 극대화로 볼 때, 공사초기에서의 신속한 동원이야말로 목표달성에 이르는 지름길이며, 발주자 및 감리자로부터 신뢰를 받아 공사 전반에 걸쳐 순조로운 현장운영을 가능케 하는 것이다.

  • PDF

A Earth-Volume Estimate Model by System Dynamics (시스템 다이내믹스를 활용한 토공량 산정 모형 구축)

  • Hwang, Young-Jo;Won, Seo-Kyung;Han, Choong-Hee;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.467-470
    • /
    • 2006
  • The earth volume which is the basis of all the construction has gone through great development so far with the use of construction machine; however, systematic studies on the related area is in need since the appropriate compound engineering method of earth volume equipments which is a key factor for shortening the project duration and cost reduction is not systematically established and it is dependent on experience. Reasonable mechanical earth volume should take into consideration of performance and characteristics of the equipment, the kind of project, scale and conditions in advance. Also, the optimum compound engineering should be planned by selecting several available scales of equipment. In this study, the earth volume estimate model is established for optimum compound engineering of earth volume equipment for mechanized earth volume equipment loading and moving stage among many stages of earth volume task using system dynamics technique. The optimum compound engineering model of the earth volume equipment produced as a result of this is expected to make reasonable decisions in the shortest time in selecting earth volume facility.

  • PDF

Development of an Equipment Operating System for Effective Earthwork Operations (효율적인 토공작업을 위한 건설장비 운영시스템 개발)

  • Ahn, Seo-Hyun;Kim, Sung-Keun;Lim, So-Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.153-166
    • /
    • 2017
  • Recently, the construction industry has been pursuing economical construction by introducing improved construction equipment and methods. However, in many cases, the equipment operation according to the intuition of the field manager and in the manner of traditional methods impedes the increase in effectiveness in terms of productivity and economy. The performance of new construction equipment has rapidly improved; however, the maximum effect of mechanized construction cannot be obtained unless the effective management and operation methods are implemented. According to the expert survey, it has been discovered that the problems of conventional construction equipment operation methods can be classified into several categories: allocation of construction equipment that is not suitable for the construction work, the combination of equipment that does not take into consideration real-time field situations, the decline in the skill of the construction equipment drivers, and lack of real-time access to necessary information. This paper proposes a construction equipment management system to solve these problems. The construction equipment management system can provide a method to maximize the work rate of the construction equipment fleet by developing an equipment allocation plan based on field conditions, whenever necessary, and transferring this information to the construction equipment drivers in real time. Ultimately, it is believed that the application of the construction equipment operation system in the field will make it possible to reduce carbon emissions by improving productivity and reducing fuel consumption.

Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field (건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발)

  • Lee, Seung-Hak;Son, Jea-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.467-476
    • /
    • 2014
  • According to the expanding of construction machinery works, the number of civil complaints demanding compensations are increasing continuously from surrounding residents due to the noise from construction fields. However, the noise is usually managed restrictedly during the construction phase rather than prevented in advance. So, the efforts to solve the noise problem are occurring only after complaints have been made. Also, excessive cost and time consuming in order to solve the complaints negatively affects to construction companies. Therefore, the purpose of this study is to develop an optimized scheduling process model for controlling the noise in construction field by considering the planned time, cost, and the number of equipment before construction. In addition, this process model is expected to provide a useful information about the cost comparison between the original planned cost plus compensation and the optimized cost considering noise limitation so that the site managers can manage their projects effectively.

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance (도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구)

  • Jung, Dae-Kwon;Tae, Yong-Ho;Ahn, Bang-Ryul;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.85-94
    • /
    • 2009
  • In cost estimation of construction, several methods including quantity-per-unit costing, job costing, unit cost estimation and lumpsum estimation are being utilized in Korea. Among them, a Quantity-per-unit Costing Method is used as a standard of cost estimation in public and private works. This paper presents the realistic job-costing method on all road construction tasks through statistical analyses with field survey data to solve the problems induced by the existing quantity-per-unit costing method. Furthermore, it was found that the newly developed job costing method is able to produce a simple costing procedure and a more actual construction cost estimation by a case study, which was performed to compare particular construction costs produced by two different methods, existing quantity-per-unit costing and newly developed job costing. These methods is compared by Case-study about sub-base. In the case of Job costing method, the estimate is shorter than the other case about 50% and can make up for the weak point about instrument in the current Standard of cost estimation. And it can be depict by Job Costing method about progress of work for using by a plan about construction management.

  • PDF

A Multi-agent based Cooperation System for an Intelligent Earthwork (지능형 토공을 위한 멀티에이전트 기반 협업시스템)

  • Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.5
    • /
    • pp.1609-1623
    • /
    • 2014
  • A number of studies have been conducted recently regarding the development of automation systems for the construction sector. Much of this attention has focused on earthwork because it is highly dependent on construction machines and is regarded as being basic for the construction of buildings and civil works. For example, technologies are being developed in order to enable earthwork planning based on construction site models that are constructed by automatic systems and to enable construction equipment to perform the work based on the plan and the environment. There are many problems that need to be solved in order to enable the use of automatic earthwork systems in construction sites. For example, technologies are needed for enabling collaborations between similar and different kinds of construction equipment. This study aims to develop a construction system that imitates collaborative systems and decision-making methods that are used by humans. The proposed system relies on the multi-agent concept from the field of artificial intelligence. In order to develop a multi-agent-based system, configurations and functions are proposed for the agents and a framework for collaboration and arbitration between agents is presented. Furthermore, methods are introduced for preventing duplicate work and minimizing interference effects during the collaboration process. Methods are also presented for performing advance planning for the excavators and compactors that are involved in the construction. The current study suggests a theoretical framework and evaluates the results using virtual simulations. However, in the future, an empirical study will be conducted in order to apply these concepts to actual construction sites through the development of a physical system.

A Strategy to Improve Customer Service for Apartment Building Units (공동주택 상품의 고객서비스 개선 전략 연구)

  • Lee, Hyun-Min;Lee, Dong-Hoon;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.163-172
    • /
    • 2009
  • As customers are becoming increasingly important in corporate management, there is a growing demand for migration to customer-focused organizational structures. Unlike the manufacturing industry, the construction industry is non-iterative and non-standardized. As a result, a wide variety of materials, human resources, technologies and equipment must be mobilized in complex work activities to complete a structure. Consequently, surprises are bound to occur as such work activities progress. This paper intends to study a strategy that is designed to improve customer services for apartment building units. It aims primarily to focus on cost control and brand management. Housing tenants and industry experts are surveyed to collect input for issue analysis. In addition, the external circumstances and internal capabilities of major builders in Korea are analyzed, and a SWOT analysis is performed regarding market conditions related to customer service. These analysis results are utilized to develop a strategy implementation plan over different time frames, and the operational resources available for such strategy implementation are analyzed in order to forecast its performance. This research will facilitate communication between construction companies in Korea and their customers by proposing a customer service improvement strategy for apartment building units, and is expected to provide resource material for a strategic analysis of efforts to fully incorporate customer requirements