• Title/Summary/Keyword: 시공성개선

Search Result 782, Processing Time 0.029 seconds

Evaluation of the Structural Performance of Tetragonal Lattice Girders (사각 격자지보의 구조 성능 평가)

  • Kim, Seung-Jun;Han, Keum-Ho;Won, Deok-Hee;Baek, Jung-Sik;Kang, Young-Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.3
    • /
    • pp.267-278
    • /
    • 2012
  • In general, the H-shaped steel ribs or triangular lattice girders have been mostly used in constructing tunnels through the NATM construction method. The H-shaped steel rib has higher flexural and axial strength than the triangular lattice girder, but many unexpected gaps can occur in the concrete lining system after shotcreting if the H-shaped steel rib is used as the support system. To achieve better shotcreting quality, the triangular lattice girder was developed. However, in general, the triangle lattice girder has low flexural and axial strength. Likewise, the triangular lattice girder, which has circular sectional members, has so many fractures from welded points at the joints between the members. Finally, the new type of tetragonal lattice girder was developed to overcome those problems. In this study, the structural performance of the tetragonal lattice girders was evaluated through analytical and experimental studies. In the analytical studies, the four-point bending analysis, the traditional evaluation method to determine the flexural strength of the lattice girder, was performed. Moreover, the linear-elastic analysis and stability analysis of the arch structure made by the lattice girders were performed to measure structural performance. Experiments were likewise performed to compare the structural performances of the tetragonal girder with traditional triangular lattice girders.

Analysis of Importance by Defect Type in Apartment Construction (공동주택 건축공사 하자유형별 중요도 분석)

  • Kim, Do-Hyung;Lee, Dongyoun;Lee, Hak-Ju;Min, Yoon-Gi;Park, Insung;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.357-365
    • /
    • 2020
  • While numbers of apartment housing are continually rising in the domestic housing construction industry, apartment contractors are currently developing plane models, upgrading facilities, and relevant technology, and investing much efforts to meet the higher demands of consumers. However, the construction process of apartment housing involves the intricate properties of the construction industry such as materials, workforce, equipment, weather, and unpredictable situations. If any of these factors becomes discordant and results in interference and interruption of the construction process, then defects, both functional and aesthetic, are likely to occur due to errors in the plan of industry organizers and constructors. Therefore, this research identifies the types of defects in an apartment construction project and analyzes their relative importance. Firstly, this research reviews the previous research trends and will reduce the needs of this research. Afterward, defect repair costs corresponding to the different defect types are calculated by applying results of the research and performing frequency analysis on defect types included in 'Tenant preliminary research' on apartments constructed by Company A. As a result of analyzing the importance of defect type, the top six activities, including tile, floor, paper hanging, PL window, cabinetry, and kitchen cabinet, are found to be of high importance, and the top six activities in question need of repair and management of defects first. The results of this study will help establish a plan to initially respond to such problems as refusal to move in and filing a defect suit against delay in repairing defects.

A VE Incentive System for Construction Industry (건설VE 인센티브 제안)

  • Song, Yong-Chul;Song, Nak-Hyun;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1019-1022
    • /
    • 2007
  • Recent construction projects are becoming larger, more complex and higher rising. Accordingly, necessity of the VE is emphasized as more suitable for expense, function and quality. However, the VE is not functional because of difficulty of application process or of the methods in use in the field of construction. One of the alternative is to introduce the incentive system to activate the VE in the field of construction. By using the incentive system, employers can reduce the relevant project's prime cost and builders will maximize profit creation. In domestic case, they presented the systematic support policy 'Technical development compensation system' which is similar to the 1992 American's VE incentive system about builder's technical development effort but the result was not positive. This study investigates both domestic and other country's construction VE incentive system and reported problems in the construction VE incentive system to executives and construction VE experts. From this survey, conclusions were drawn about problems in the domestic construction VE incentive system's similarity system: 'Insufficiency of the construction VE incentive's article and standards', 'Insufficiency of the appraiser of the construction VE and of the full charge department' etc. I had interviews with the experts of the construction VE which were based on the above-mentioned problems and then presented 'Improvement of the construction VE's incentive system relevant law and system', 'Construction VE experts and construction formation' etc. for ways to bring acceptance of the construction VE in the construction industry.

  • PDF

Construction Process Modelling Method Improving the Traceability of ICT Applications (ICT 적용 추적성 개선을 위한 시공관리 프로세스 모델링)

  • Go, Taeyong;Lim, Taekyung;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.114-123
    • /
    • 2019
  • Tracking ICT applications on construction business processes is critical to the success of ICT-applied construction projects. Existing IDEF0 is a representative modeling method for visualizing and analyzing business processes. It defines a construction production process into a visual information model, hence, encouraging the project participant to understand the activities, their deliverable, and control flow of the process. However, IDEF0 dose not lend itself to ICT-applied construction processes, because it does not provide a mean to define how, in what order, by which each and every activity that ICT applied implements. This paper presents a new business modeling method that improves the traceability of ICT application (IAMB: ICT Application tracking Model for Business process) for construction management. The IAMB contributes to handle the sophisticated features of construction management processes to which ICT are applied. The method categorizes the process into three types: management, construction, and information exchange. The validity of IAMB was confirmed by analyzing the performance when it is used for tracking each modeling step of lift reservation process which making use of ICT. The test case provides an admissible evidence that the method encourage to define who, what, how, which order, and by which ICT tools the construction process exchanges production information.

Automatic Extraction of Fractures and Their Characteristics in Rock Masses by LIDAR System and the Split-FX Software (LIDAR와 Split-FX 소프트웨어를 이용한 암반 절리면의 자동추출과 절리의 특성 분석)

  • Kim, Chee-Hwan;Kemeny, John
    • Tunnel and Underground Space
    • /
    • v.19 no.1
    • /
    • pp.1-10
    • /
    • 2009
  • Site characterization for structural stability in rock masses mainly involves the collection of joint property data, and in the current practice, much of this data is collected by hand directly at exposed slopes and outcrops. There are many issues with the collection of this data in the field, including issues of safety, slope access, field time, lack of data quantity, reusability of data and human bias. It is shown that information on joint orientation, spacing and roughness in rock masses, can be automatically extracted from LIDAR (light detection and ranging) point floods using the currently available Split-FX point cloud processing software, thereby reducing processing time, safety and human bias issues.

A Study of Improving Project Management and Supervision Cost Estimation of Intelligent Transport Systems (ITS 사업관리 및 감리 대가기준 개선방안에 대한 연구)

  • Byun, Sang-Cheal;Lim, Sung-Han;Heo, Tae-Young
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.16 no.5
    • /
    • pp.197-205
    • /
    • 2011
  • Since Intelligent Transport Systems(ITS) is a complex project combining technology and system of transportation, information and communication and civil engineer, it needs a specialized management activities. However, it is difficult to judge who has responsibility for a shoddy and fault construction since the role between project management and supervision is very ambiguous. The aim of this study is propose an efficient project management and supervision for ITS reflecting the characteristics of ITS. Therefore, we suggest a statistical models using nonlinear regression model to prepare the project management and supervision compensation criteria, hence, we choose the realistic and validation statistical model.

Analysis of the Slit type Coastal Structures to the Field Application (슬릿형 해안구조물의 현장 적용성 분석)

  • Park, Sang-Gil;Lee, Joong-Woo;Kang, Sug-Jin;Kim, Suk-Moon;Gil, Moon-Mo
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2010.04a
    • /
    • pp.231-233
    • /
    • 2010
  • 최근 어항에도 친환경항만을 건설하기 위한 노력이 국제적으로 확산되고 있으며, 우리나라에서도 어항의 정비 및 재개발부분에서 적극적으로 수질개선을 위한 기술 적용이 본격화 되고 있다. 본 연구는 우리나라 남해의 소규모 어항 및 해수욕장에 슬릿형 해안 구조물이 시공된 실해역의 실측자료와 수치해석을 통해 현장적용성의 분석을 수행하였다. 수치실험으로는 파랑작용 평형방정식을 이용하는 SWAN 모델을 구성하고 수리모형실험에서 분석된 실린더 슬릿형 방파제의 반사와 투과계수를 모텔에 도입하였다. 수치실험은 한국해양연구원의 전해역 심해설계파 추정 보고서 II (2005)중의 심해설계파 제원을 사용하였으며, 대상해역의 1970년~2006년 (37년간) 관측된 연최대 풍속자료를 이용하여 모델에 반영하였다. 설리항에서 S, SSE, SE계열의 파랑의 내습에 대한 분석을 수행하였으며, 그 결과 구조물이 항내에서 정온도가 유지되며 해수순환에도 이점이 있음을 현장관측 자료분석과 수치실험결과를 통하여 확인할 수 있었다.

  • PDF

A study of a plan for better construction process of pre-construction phase in general contractor (종합건설회사내 Pre-construction 단계에서의 업무흐름개선에 관한연구)

  • Park Jang-Seob;Song Jong-Seok;Shin Soo-Am;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.481-484
    • /
    • 2003
  • Recently, the importance of Pre-construction is gradually increasing in construction business. In addition to increasing greatness, Pre-construction affect to success or failure of projects. However, current domestic construction business doesn't constitute exact concepts and systems, and there are a lot of problems such as disorganize management of construction because most of Pre-construction depends on supervisors' experiences. Therefore, according as doing this study, We are going to analyze the tendency of Pre-construction step and bring up designed operation systems between departments in construction company. So we can expect to develop efficiency by excluding unnecessary operation and formulating more improved operation process.

  • PDF

A basic study on the development of intelligent tower crane using IT (멀티미디어와 RFID 등 IT를 활용한 지능형 타워크레인 개발 기초연구)

  • Han Yong-Woo;Cho Hun-Hee;Lee You Seop;Kang Tai Kyung;Kim Jong Sum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.625-628
    • /
    • 2004
  • Even though the tower crane is a major equipment in a construction of high rise buildings, there are lack of studies of it. This study is presenting a framework of developing a intelligent tower crane applied with the technology of machine-vision, RFID(Radio Frequency Identification), or GPS(Global positioning System) and proposing the prototype of machine-vision module, sub module of this Framework. Through monitoring form CCTV(Closed Circuit Television) and LCD(Liquid Crystal Display) in machine-module the real time communication between in-site workers and crane operator is possible. this will improve the productivity and safety of the tower crane.

  • PDF

An Analysis of Satisfaction of Knowledge Management from the Perspective of Workers in Domestic Major Construction Companies (실무자 관점에서의 국내 대형 건설 회사 지식경영 인프라 만족도 분석)

  • Kim, Youn-Jung;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.3-10
    • /
    • 2011
  • Knowledge has been one of the key factors influencing the companies' competitive power. Domestic construction industries have introduced Knowledge Management from 1990s around major construction companies. However, construction organizations have recently give a skeptical response about Knowledge Management. The existing Knowledge Management in construction industries does not satisfy the demands of workers. Furthermore it makes workers do double business. Therefore, this study investigates the workers' satisfaction of Knowledge Management, and becomes the preliminary study to suggest how to improve Construction Knowledge Management.