• Title/Summary/Keyword: 시공불량

Search Result 158, Processing Time 0.024 seconds

A Basic Study for Single Shell Support System of Railway Tunnel (철도 터널의 싱글쉘 지보시스템 적용에 관한 기초 연구)

  • Jung, Daeho;Jeong, Cahnmook
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.1
    • /
    • pp.39-48
    • /
    • 2016
  • In this study, it can be shortened tunnel construction work period by introducing a single-shell tunnel does not placing the secondary concrete lining, a global research trend, reduction of the cost of the lining placement and number of benefits that can ensure the safety of long-term tunnel with a single shell it was to study the tunnel method. First, we analyze the design and construction practices relating to delete lining of the domestic design and construction practices and a comprehensive analysis of the stability study found a rock in good condition interval (1~3 grades), we propose that the lining uninstalled. In the case of domestic changes on the ground floor is very heavy underfoot conditions many so tunneling method by single shell as ground conditions are good and one preferred the water points that apply in less soil, the soil health and poor sections (4~5 grades) reflecting with respect to the concrete lining that is expected reasonable.

An Experimental Study on the Evaluation of EMP Shielding Performance of Concrete Applied with ATMSM Using Zn-Al Alloy Wire (Zn-Al 합금 선재를 이용한 금속용사 공법 적용 콘크리트의 전자파 차폐 성능 평가에 관한 실험적 연구)

  • Choi, Hyun-Jun;Park, Jin-Ho;Min, Tae-Beom;Jang, Hyun-O;Lee, Han-Seung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.3
    • /
    • pp.209-217
    • /
    • 2019
  • EMP (Electromagnetic Pulse) usually means High Power Electromagnetic Wave (HPEM). In the case of the shielding plate against the EMP, there is a possibility of deterioration of the electromagnetic wave shielding performance due to the skill of the constructor, bad construction, deformation of the shielding plate at the connection portion (joint portion). The inefficient use of space due to the separation distance is also pointed out as a problem. Therefore, this study aims to derive the optimum electromagnetic shielding condition by applying ATMSM to concrete as a part of securing electromagnetic wave shielding performance with reflection loss against concrete wall. Experimental parameters included concrete wall thickness and application of Zn-Al ATMSM. For the concrete wall, the wall thickness was 100 to 300mm, which is generally applied, and experimental parameters were set for the application of Zn-Al metal spraying method to evaluate electromagnetic shielding performance. Experimental results showed that as the thickness increases, the electromagnetic shielding performance increases due to the increase of absorption loss. In addition, after the application of Zn-Al ATMSM, the average shielding performance increased by 56.68 dB on average, which is considered to be increased by the reflection loss of the ATMSM. In addition, it is considered that the shielding performance will be better than that when the conductive mixed material and the ATMSM are simultaneously applied.

Behaviour Analysis of Crown Collapse under Tunnel Construction After Completing Reinforcement (보강완료 후 시공 중 터널 천단부 붕락 거동 분석)

  • Kim, Nagyoung;Baek, Seungchol;Min, Kyungjun;Kim, Bongsu;Heo, Yol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.4
    • /
    • pp.39-46
    • /
    • 2016
  • The final stability analysis of the tunnel structure is generally evaluated by performing site monitoring to determine whether or not the measured value through the convergence after the completion of excavation in the face. When the ground conditions are so poor, the reinforcement around the tunnel was applied for enhancing the stability of tunnels. For the additional tunnel crown collapse or excessive displacement have occurred under construction, correlation analysis were performed for the comparison construction and numeric analyses. In this paper, we investigated the collapse types, tunnel collapse were mostly occurs at the crown and they were analyzed because of the geological conditions in the collapse zone. And also, it was analyzed as being correlated in the crown of tunnel exists a fault fracture zone which extends to the surface part. Thus, in case of ground conditions such as fault fracture zone with a tunnel extending from the crown to the surface, the behavior is larger than the behavior predicted by numerical method.

A Study on the Evalution after Urban Park Construction by Geographic Information System - Namsangol Park , Junggu , Seoul - (GIS를 활용한 도시공원 시공후 평가에 관한 연구 - 서울 중구 남산골공원을 중심으로 -)

  • 장동수;김남규
    • Spatial Information Research
    • /
    • v.4 no.1
    • /
    • pp.93-105
    • /
    • 1996
  • The purpose of this study was to give some ideas to the improving direction and evaluation in order to solve physical' ecological problems appeared after urban park construction. This study selected Namsangol park as a site, because this park was constructed to the goal in order to rehabilitate the original landform as a part of "Namsan original landscape rehabilitation work". So this study was executed to investigate past and present landform change, soil condition, planting, water/climate etc., and then these were analyzed by GIS.- soil :pH, Ec, organic matter, the ability of moisture content, bulk density, porosity, etc.- planting:planting density, plant species- water/climate: the amount of rainfall, drainage and drainage-basin. And then this study overlayed soil+cut/fill, soil+pine tree, cut/fill + planting density, and cut/fill + plant species.t species.

  • PDF

Evaluation of Aggregates Properties Depending on Producing Sectors and Regions in Korea (전국 골재산지 권역별 콘크리트용 골재의 물성 평가)

  • Han, Min-Cheol;Lee, Jun-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.499-506
    • /
    • 2017
  • This study is to present empirical data about the needs for quality security of aggregate by randomly selecting aggregate from 4 major locations including A, B, C, D province in Korea, by investigating its quality status in terms of physical properties and particle distribution based on Korean industrial standards(KS). The test results indicated that wide variance in quality, and some of aggregate samples were far below the standard, still many of them are not satisfying KS standards. In addition, the current aggregate manufacturing process that does not include inspection of particle size distribution by sieving and fineness modulus, can induce a possibility of non-KS aggregate's distribution; this provide that the current status of aggregate quality security of Korea is seriously threatened. Thus, it is important to secure each aggregate's quality level under KS standards.

Development and Application of Backfill Material for Reducing Ground Subsidence (지반함몰 저감을 위한 하수관로 뒤채움재 개발 및 현장적용성 평가)

  • Lee, Dae-Young;Kim, Dong-Min;Ryu, Yong-Sun;Han, Jin-Gyu
    • Journal of the Korean Geosynthetics Society
    • /
    • v.14 no.4
    • /
    • pp.147-158
    • /
    • 2015
  • In this study, sewer backfill material was developed to prevent sewer damage and ground subsidence. Laboratory test was performed in the field of CA replacement ratio, accelerator type and replacement ratio and W/M. The compression strength of backfill material was 0.55~0.64MPa below in W/M 70% and 0.20MPa over W/B 80%. Ice block was used to simulate the ground cavity and subsidence caused by sewer damage in application study. The existing sand compaction and the new backfill material was comparative estimated in field. The ground settlement of cross section was 23.4cm and that of longitudinal section was 27cm in sand compaction section, but the ground had not sunk in backfill material section.

Study on the Operation and Status of Private Sewage Treatment Facilities (개인하수처리시설 운영 및 실태 연구)

  • Lee, Jang-Hown;SHIN, Hyun-Gon
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.28 no.2
    • /
    • pp.31-40
    • /
    • 2020
  • As private sewage treatment facilities in Korea are constantly concerned about the distribution and poor construction of defective products, minimum standards for each unit process applicable to the planning and design of sewage treatment facilities are deemed necessary. The problems and requirements of the analysis results of the operation status discussed in this study are as follows. 1) Strengthening education of supervisor of private sewage treatment facility. 2) Poor operation and management of Sewage treatment facilities. 3) A mandatory review of sewage treatment facilities for less than 2 ㎥/day of facilities other than sewage treatment zones. 4) Necessity of management of sewage treatment facility in feedstocks. 5) As a result of the technical review, Improvement plans for Ineligible facility are needed. It is also necessary to prepare a guidebook for design construction and maintenance by investigating and analyzing guidelines and data related to domestic and foreign private sewage treatment facilities.

Evaluation of the Performance on Coating on Roller Compacted Concrete Pavement for Bike Roads (자전거도로용 롤러 전압 콘크리트 포장의 코팅에 따른 성능 평가)

  • Lee, Chang-Ho;Lee, Seung-Woo;Kim, Seong-Kil
    • International Journal of Highway Engineering
    • /
    • v.13 no.1
    • /
    • pp.79-86
    • /
    • 2011
  • Recently, usage bicycle is encouraged to reduce fuel consumption and air pollution. For this purpose, bike road constructions are actively performed. However, types of pavement used in bike roads have high construction cost and performance comparing the required capacity of bike roads. Thus, an economical pavement type for construction is necessary for the effective development. Roller compacted concrete pavement have good requirements, such as easy construction and low costs, high structural performance of hydration and internal communication aggregation on compaction for bicycle roads. However, the pool landscape surface and resistance to deicer damage cannot be applied to the construction of bicycle roads. Thus, for solving this problem used coating which may have effect of improving the landscape and environmental resistance. To examine this effect were evaluated performance of roller compacted concrete pavement on the coating.

A Gas Accident Statistics and Analysis (가스사고 통계 및 분석에 관한 고찰)

  • Kwon, H.J.;Park, C.O.;Park, C.I.;Yeo, C.H.;Lee, J.W.;Hong, J.R.
    • Journal of Korean Institute of Fire Investigation
    • /
    • v.11 no.1
    • /
    • pp.59-65
    • /
    • 2008
  • Among the various cases of fire accident, gas accident which is roost essential have a lot of forms and causes. The quantity consumed of gas is increasing because of increment of gas-using families and variations of gas machinery. The quantity consumed of gas in 2007 was 35078 tons and the average rate of increasement was 9.4%. The amount of gas accident was on the peak at 1995 when 557 accidents occurred in a year. In 2007, 123 gas accidents was occurred and the average rate of diminution was 11.5%. Accidents by LP gas took 80% of the whole accident and city gas and high pressure gas took 20%. In case of LP gas, accidents were usually occurred because of lack of blocking after the removal of gas machinery and moveable butane burner. Especially, the accidents cause by carelessness of a provider is increasing. Gas accidents which generate damage of human life and property, are caused by users' carelessness, providers' carelessness, inferiority of structure and old products. In this thesis, We will classify the gas accidents. Furthermore through the classification of accidents by forms, causes and regions, this thesis going to be a reference to understand and prevent the accidents.

  • PDF

Behavior of Geosynthetic Reinforced Modular Block Walls with Settlement of Foundation (기초지반의 침하가 계단식 보강토 옹벽의 거동에 미치는 영향)

  • Yoo, Chung-Sik;Jung, Hye-Young;Song, Ah-Ran
    • Journal of the Korean Geosynthetics Society
    • /
    • v.4 no.4
    • /
    • pp.13-21
    • /
    • 2005
  • This paper presents the results of an investigation on the effects of settlement of foundation on the behavior of geosynthetic-reinforced modular block walls in a tiered arrangement using the finite-element method of numerical analysis. A parametric study was performed by varing the foundation condition and offset distance between the tiers and reinforcement length of the lower and upper tier using varified finite-element model. The finite-element analysis provided relevant information on the mechanical behavior of the wall and interaction mechanism between the upper and lowers that was otherwise difficult to obtain from the limit-equilibrium analysis based current design approaches. Practical implications of the findings obtained from this study to current design approaches are discussed in great detail.

  • PDF