• Title/Summary/Keyword: 시공감리자

Search Result 54, Processing Time 0.023 seconds

Analysis of Basic Capabilities for Building Demolition Experts - Focused on Domestic and International Cases (건축물 해체공사 전문인력을 위한 기본역량 분석 - 국내·외 사례를 중심으로)

  • Lee, Kyung-Koo;Shin, Yong-Seob;Lee, Hyung-Yong;Chun, Jae-Youl
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • The rising number of accidents during building demolition work has significantly heightened interest in this field. This study undertakes a comprehensive analysis of the essential capabilities required for building demolition experts, drawing on both domestic and international examples. This includes an examination of training courses for building demolition inspectors and the competencies mandated for structural demolition roles as per Korea's National Competency Standards(NCS). Furthermore, the study reviews the qualification tests and training programs for building demolition professionals in the United States, Japan, and England. The research concludes that the expertise needed for demolition construction professionals should be categorized into seven key domains: legal, structural, safety, planning, operational, constructional, and environmental aspects. These competencies are further divided across three professional tiers: technician, engineer, and manager.

Data Model for Document Exchange of Construction Projects (건설 프로젝트 문서교환을 위한 데이터모델)

  • An Sun-Ju;Son Bo-Sik;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.569-572
    • /
    • 2003
  • A construction process involves many designers, engineers, contractors, consulting engineers and government officials. Thus, it is essential to promote collaboration among such participants through of effective document exchange. There have been efforts to Improve efficiency of document exchange through Web. Also XML/EDI is recommended by its method. So the purpose of the research was to establish the data model for document information management in document exchange for construction participants using web-based XML/EDI. This research proposed a method of modeling document information for systemic management of document information that exchanged by XML/EDI in central and explained concept of application document information that stored in database. This research classified construction document according to its information relation.

  • PDF

Identifying the perception on the introducing of Construction Management(CM) in the civil infrastructure project delivery system (사회간접자본 프로젝트의 CM제도 활성화방안에 대한 인식분석 연구)

  • Jang, Won-Suk;Lee, Sang-Uk;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.91-100
    • /
    • 2013
  • Current environment in civil and construction industry has changed to actively adopt construction management (CM) in various areas. While it is found that exemplary CM projects have been carried out in many civil engineering sectors, concrete system framework has not been suggested due to ambiguous boundary between CM and supervision system, unclear perception of CM's role, and inexperienced organization and regime. This paper investigated the challenges faced in civil and construction industry, and analyzed the strategy that could improve the current immature CM system by conducting questionnaire survey from experts in various construction sectors. The results could provide valuable information that can involve diverse opinions and view points in project participants.

The Study of Quality Control in Engineering on the Turnkey Project(Focus on Change Orders at the Construction Phase) (턴키공사 설계품질관리에 관한 연구(시공단계의 설계변경을 중심으로))

  • Lee Yong-Jin;Lee Teck-Wn;Kim Jin-Young;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.58-66
    • /
    • 2001
  • Turnkey project, also called Design-Build project, has been expanding and diversifying its business into the Korean market. However, it has been experiencing numerous difficulties due to a large number of change orders on the public turnkey project. Change order during the construction phase impact on time deliveries, budget and quality on a turnkey project. In preparation for this, the government has to improve the awarding procedure and general conditions for turnkey projects. Contractors should also cooperate with their co-working partners and establish a standardized procedure, which provides change order control for efficient implementation on the construction site.

  • PDF

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Correlation Analysis between Organization Conflict and Job Stress of Construction Manager in Construction Site (건설현장 건설사업관리기술자의 조직갈등과 직무스트레스 상관관계 분석)

  • An, Sung-Hoon;Bitamba, Bauma Frigeant
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.367-373
    • /
    • 2020
  • As the supervision in site is integrated into construction management, the organization's work is expanded, and the perspective and goals of the work have changed, so there is a high possibility that the conflict situation within the organization will increase. Organization conflict increase a job stress of workers, so it acts as a negative factor in deriving organizational performance. Therefore, the purpose of this study is to analyze the correlation between organization conflict and job stress of construction manager in construction site. As a result of the study, the organization conflict of the construction manager was generally low, and the job stress was also less than that of other area's workers. In addition, correlation analysis revealed that organization conflict and job stress were related. The results of this study may help to improve the organization structure in the construction management site organization.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

A Study on the Reinforcement of Disaster Prevention for Construction Stakeholders in Korea (국내 건설공사 이해관계자에 관한 재해예방 강화 연구)

  • Ki-Taek Oh
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.192-198
    • /
    • 2024
  • Purpose: In order to establish a safety management system led by an orderer in the construction industry, the orderer should be positioned at the peak of the construction industry safety management system and a system that can effectively support safety supervisors who can assist the orderer's role should be reflected. Method: This study collected and analyzed data on the status of safety management of construction business owners through prior research on safety management of construction business owners and a survey on the actual condition of those involved in the construction business. Results: The top priority is to improve the safety awareness and safety management capabilities of the orderer, and through these efforts, the orderer-led safety management system will be established when a national consensus on the responsibility of the orderer, such as the Serious Accident Punishment Act and the Occupational Safety and Health Act, is formed in the event of an accident such as a serious accident. Conclusion: In order to establish a safety management system led by an orderer in the construction industry, it contributes to disaster prevention by positioning the orderer at the peak of the construction safety management system and reflecting a system that can effectively support safety supervisors who can assist the orderer's role.

Development of 3-Dimensional Rebar Detail Design and Placing Drawing System (3차원 배근설계 및 배근시공도 작성 자동화 시스템 개발)

  • Choi, Hyun-Chul;Lee, Yunjae;Lee, Si Eun;Kim, Chee Kyeong
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.27 no.4
    • /
    • pp.289-296
    • /
    • 2014
  • The rebar detailing is an important work influencing the final performance and quality of RC structures. But it is one of the most irrational and illogical activity in construction site. Many groups of workers, including main contractors, structural engineers, shop drawers, rebar fabricators, and etc., participate in this activity. A loosely-organized process for this activity is apt to produce a big amount of rebar loss or even degraded structures. A 3-dimensional rebar auto-placing system, called as Rebar Hub, has been designed and implemented in this research. Rebar Hub provides a totally integrated service from 3D structural modeling of buildings to rebar auto-placing considering anchorage, splice, and the length of ordered rebar. In addition, Rebar Hub can recognize the 2D drawing CAD files and then build 3D structural models which are used for the start point of 3D rebar auto-placing. After rebar auto-placing, each members of the 3D structural model have rebar information belonging to them. It means that the rebar information can be used for the afterward works such as quantity-survey, manufacturing and fabrication of rebars. Rebar Hub is showing outstanding performance while applying to practical projects. It has almost five times productivity and reduces the rebar loss up to 3~8% of the initially-surveyed amount of rebar.

A Study on the Post-Evaluation of Landscape Design Competition based on Ground Theory - Case of Gwanggyo Lake Park in Korea - (근거이론을 활용한 조경현상설계의 사후평가 - 광교호수공원을 사례로 -)

  • Hong, Youn-Soon;Park, Jae-Min
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.5
    • /
    • pp.92-102
    • /
    • 2016
  • While there have many completions of large parks recently under development, there has been a dearth of quality assessments. Studies focused on post-evaluation have been made to resolve this, but most of these are biased toward user satisfaction after completion and therefore behaviour analysis has limitations on solving problemsduring the actual design implementation processes. Therefore, this study examined the internal phenomenon and structure of the implementation process of design competition through the ground theory and microscopic independent perspective. As a result, maintaining the identity and differentiation of parks derived from the preserved design competition scheme contributed greatly to completeness and satisfaction. Outcomes were mainly caused by the trust of public officials as the ordering organization, the will of policy decision-makers, and the competence of operational enterprises, etc. Negative factors such as undermining the whole concept of the park and landscape occurred as external pressure and related subjects intruded on change design factors due to variations in social conditions. Additionally, illogical construction processes occurred, such as a reinvestigation of the budget for restoration after damaging on original landscape. There have been needs for the improvement of the work processing system. On balance, an interventional role is very important in the park construction process, especially the PA and operation committee in terms of maintaining the basic direction, landscape design supervision for detailed designs, and expert construction management on LA in terms of rational work management in the field. The study, using the microscopic perspective of the designer and ground theory, deliver significant meaning as an early study by suggesting alternative methods for the after-evaluation of large parks and structurally looking into main influence factors driven during the construction process.