• Title/Summary/Keyword: 시공간도

Search Result 14,277, Processing Time 0.035 seconds

Case Study of Friction Piles Driven into Clayey Soils on the Central Coast of Vietnam (베트남 중부 연안의 대심도 점토지반에 시공된 강관 마찰 말뚝의 항타시공관리)

  • Seol, Hoon-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.3
    • /
    • pp.19-31
    • /
    • 2024
  • In Korea, driven piles are generally penetrated up to weathered rock or harder strata. Friction piles have been used to some extent in the southwest coastal area with deep soils; however, friction piles are not extensively due to uncertainties about construction quality. The embedded pile construction method is primarily used due to noise and vibration complaints. However, in Southeast Asian countries (e.g., Cambodia, Myanmar, and Vietnam), where soft sediments are deep, the driven pile method is commonly used due to its economic advantages. Construction companies are increasingly entering overseas construction markets, e.g., Southeast Asia; thus, it is necessary to understand the behavior of driven friction piles in the soil and improve on-site engineering management to gain market competitiveness in these countries. In this study, the bearing capacity of friction piles driven into clayey coastal soils in Vietnam with time-dependent characteristics was evaluated based on the dynamic and static pile load tests. Based on the results, a modified Danish formula is proposed for on-site quality management.

A Technical Report on the Design and Construction of Hybrid Tension Roof Structure of Incheon Munhak Stadium (인천문학경기장 지붕구조의 설계와 시공)

  • Seok Hwangbo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.194-201
    • /
    • 2003
  • 대공간 구조시스템은 일반적으로 자중을 최소화하고 부재내력의 효과적인 사용이 매우중요하다. 따라서 준공후의 외력에 대한 구조적 거동에 대한 파악도 중요하지만 시공중의 거동에 대한 파악도 매우 중요하다. 특히 케이블 막구조의 경우 시각초기에 구조물이 불안정하지만 케이블에 장력이 도입되면서 점차적으로 구조물의 강성이 높아져 구조물이 안정화를 이루게 피므로 시공과정 해석 즉 안정화 이행과정해석이 시공계획을 설정하는 부분에서 매우 중요한 요소가 된다. 본고에서는 케이블 막구조의 실례로써 최근 완공된 인천문학 경기장 지붕구조를 대상으로 시공과정과 안정화 이행과정해석에 대한 소개를 한다. 인천문학경기장 지붕구조는 케이블에 장력을 도입하는 과정에서 발생되는 변형과 내력을 흡수하고 하부구조에 대한 영향을 최소화하기 위하여 마스크 지점의 회전과 이동이 가능한 특수공법을 채택하였으며 시공과정해석(안정화이행과정해석)을 통하여 제시된 단계별 목표장력 및 변위에 따라 시공과정이 계획되고 제어되었다. 특히 외국의 기술로 설계된 자료를 근거로 일방적으로 공사를 수행한 다른 구조물과는 다르게 국내의 기술력에 바탕한 구조 해석 등을 통하여 검증하여 최종 시공방법을 결정하였고 이러한 과정을 통하여 대공간 구조에 대한 기술력을 확보하고 확인할 수 있었으며, 그 결과 향후에는 국내의 기술력으로 이와 같은 대규모의 케이블 막구조의 설계와 시공이 가능할 것이라고 판단된다.

  • PDF

An Enhanced Operating Scheme of Evaluation System for Construction Works -Focused on the KNHC System (시공평가제도의 효과적 운영방안 -대한주택공사 제도를 중심으로)

  • Choi Jin-Woo;Jung Sang-Bong;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.279-284
    • /
    • 2001
  • The owner's evaluation system about the contractor's work performance is used to give the contractor some advantages or disadvantages. According to the result of evaluation of the contractor's performance in the given construction project, the owner identify the good contractors and give them some merits in the future project bidding. However, the system used in the Korean construction industry has caused many problems and has been operated improperly. As a case study, this paper investigates the current problems existed in the KNHC (Korean National Housing Corporation) evaluation system and suggests some directions for its efficient operation. In doing so, the study performed interviews with the KNHC officers and the related contractors, using a structured questionnaire

  • PDF

Analysis of the Impact of the Expansion of Direct Construction Works and Suggestions on the Application (직접시공 확대의 영향 분석 및 직접시공의무제도 적용을 위한 대응방안 제언)

  • Lee, Meesung;Kim, Siyeon;Yu, Ilhan;Han, Ju-yeon;Son, JeongWook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.15-23
    • /
    • 2021
  • As the construction production system is reorganized as part of the construction industry innovation plan, direct construction is expanding. According to this trend, this study analyzed the impact and problems of the expansion of direct construction through the position of the construction industry and a study of foreign cases. In addition, by diagnosing the impact of the measures to expand direct construction from various aspects, countermeasures were suggested to suitably apply the direct construction mandatory system. Also, for each alternative, effects and problems were evaluated through interviews with experts in policy/administrative and architecture fields. The alternatives for expanding and improving the efficiency of the direct construction mandatory system derived from this study are four items: granting the discretion of the client, differentiation by scale of construction, utilization of construction guarantee system, and introduction of flexible working group leader system. As a result of the expert interview, all of them were evaluated to have a positive impact directly and indirectly on the expansion of direct construction. This study contributes literature to the application of the direct construction mandatory system by examining the current status of direct construction, and suggests a direction for expanding direct construction through deduction of alternatives for applying the direct construction mandatory system and expert evaluation.

The Constitutional Directions of Construction Information Management System Between Design and Construction in the Building Project (설계/시공간의 효율적인 정보통합관리를 위한 건설정보처리시스템 구축 방안)

  • Oh Seung-Jun;Lee Kyung-Kook;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.464-467
    • /
    • 2002
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. This research proposed the optimization method of building system which is satisfied with performance of building, cost, constructability, and proposed the information management plan which is connected with that. And The construction information in this research is restricted to design/construction information which is considerate in design step.

  • PDF

Effect of Seismic Load on Residential RC Buildings under Construction Considering Construction Period (시공기간을 고려한 주거용 철근콘크리트 건물의 시공 중 지진하중 영향 분석)

  • Choi, Seong-Hyeon;Kim, Jea-Yo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.35 no.4
    • /
    • pp.235-242
    • /
    • 2022
  • Compared with buildings that have already been constructed, buildings under construction may be more vulnerable to such natural disasters as earthquakes because the concrete strength is not yet sufficient. Currently, Korean design standards present minimum performance targets for each seismic grade of buildings, but the seismic load for design is based on a return period of 2400 years. However, because the construction period of the building is much shorter than the period of use of the building, the application of the earthquake return period of 2400 years to buildings under construction may be excessive. Therefore, in this study, a construction stage model of buildings with 5, 15, 25, and 60 floors was created to analyze earthquake loads during construction of residential reinforced concrete (RC) buildings. The structural stability was confirmed by applying reduced seismic loads according to the return period. As a result, the structural stability was checked for an earthquake of the return period selected according to the construction period, and the earthquake return period that can secure structural safety according to the size of the building was confirmed.

Analytical study for effects of shoring stiffness and slab cracking on construction loads of flat plates (플랫 플레이트 시공하중에 대한 동바리 강성 및 슬래브 균열 효과 분석)

  • Kim, Jae-Yo;Hwang, Hyeon-Jong;Park, Hong-Gun;Hong, Geon-Ho;Lim, Joo-Hyuk;Kim, Yong-Nam
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.438-441
    • /
    • 2009
  • 휨강성이 작은 바닥시스템인 플랫 플레이트 구조는 응력조건 뿐만 아니라 사용성조건에 의하여 구조적 성능이 결정될 수 있으며, 특히 과도한 시공 하중의 작용은 시공 중 안전성에 대한 단기적인 손상 뿐만 아니라 사용성에 관련된 장기적인 손상을 발생시킬 수 있다. 이러한 플랫 플레이트의 시공하중은 동바리지지 층 수, 시공주기, 슬래브 콘크리트의 재료적인 강성 뿐만 아니라, 동바리의 강성과 슬래브에 발생하는 균열에 의한 영향에 의하여 결정된다. 본 논문에서는 다양한 설계조건에 대한 해석연구를 통하여, 동바리-슬래브의 강성비 변화 및 콘크리트 균열에 의한 단면강성저하가 슬래브들 간의 하중 분포에 미치는 영향을 분석하고, 이러한 동바리 강성 및 슬래브 균열의 영향을 고려한 시공하중 산정법을 제안한다.

  • PDF

도시가스분야 검사업무 지침 종합 - 시공감리, 전기방식 및 특정가스사용시설 등

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.118
    • /
    • pp.34-43
    • /
    • 2000
  • 아현동 도시가스 폭발사고와 대구 지하철 공사장 가스폭발사고 등 잇따른 대형 도시가스사고로 인하여 보다 적극적이고 체계적인 가스안전관리의 필요성이 제기되어 1995년 8월 4일 시공감리 등의 제도가 법제화되었으며, 새로이 마련된 시공감리제도 등의 시행을 위하여 1996년 초부터 시공감리업무 수행지침서와 각종 지시$\cdot$지침이 작성되어 가스사고예방을 위한 안전관리에 활용되어 왔다. 이러한 법령의 정비 및 관련지침에 따른 철저한 안전관리와 도시가스사업자 안전의식 향상의 결과 1995년 264건에서 1999년 26건으로 도시가스로 인한 사고발생이 90$\%$ 이상 획기적으로 감소하였다. 그리고 전면적으로 법 개정이 이루어진 1995년 8월 4일 이후 수 차례에 걸쳐 법령 및 관계고시의 개정으로 보다 효율적인 안전관리체계를 정립하여 왔으며 이에 따라 시공감리업무 수행지침서와 각종 지침의 수정이 불가피하게 되었다. 따라서 한국가스안전공사에서는 개정된 법령 및 관련고시에 맞게 시공감리업무 수행지침$\cdot$전기방식 검사업무지침 및 특정가스사용시설 검사업무지침을 수정하였고, 시공감리업무 운영을 위한 각종 운영지침으로 통합$\cdot$개정하였으며, 세부적인 신축흡수조치 방법을 명시한 입상관의 신축흡수조치 지침을 제정하였다.

  • PDF

Application of the Evaluation System of Rock Mass in a Mountain Tunnel Constructed by NATM (NATM 시공 산악터널에서의 암반평가시스템 적용 연구)

  • 김영근;장정범;정한중
    • Tunnel and Underground Space
    • /
    • v.5 no.4
    • /
    • pp.297-307
    • /
    • 1995
  • 터널은 긴 선상구조물로서 사정조사결과와 다른 지질조건이 나타날 수 있으므로, 안전하고 합리적인 터널공사를 위해서는 시공중 지질조건에 적합한 지보설계를 실시하는 것이 필수적이다. 이를 위해서는 시공중 터널주변자반에 대한 정량적이고 공학적인 평가가 매우 중요하다. 그러나 시공중 암반을 평가하는 것은 매우 어렵고 조사자의 경험과 지식의 차이에 의해 평가정도가 크게 달라져 그 불합리성이 심화되고 있는 실정으로 터널주변암반에 대한 합리적인 평가방법이 절실히 요구되고 있다. 본 연구에서는 터널화상처리, GeoCAD, 역해석으로 구성된 평기시스템을 개발하였다. 본 시스템은 터널막장에서의 조사.시험 및 화상처리기법을 통하여 암반분류.평가를 실시하고, 터널주변 지반구조 및 굴착/지보과정의 3차원 모델링을 통하여 전방지질을 예측가능하게 하며, 터널계측자료의 역해석을 통하여 터널주변 지반의 물성을 정량적으로 평가할 수 있는 체계적이고 종합적인 평가시스템이다. 또한 이를 NATM 공법으로 시공되는 터널현장에 적용하므로써 본 시스템의 현장적용성을 검증하였으며, 이를 통해 적절한 지보공을 시공하여 터널의 안정성을 확보하고 합리적인 시공관리를 달성할 수 있었다.

  • PDF

The Construction Method on the Arch-type Anchor Block by means of Hight-adjustable Auger-crane with Hydraulic Expansion (신축형 오거크레인용 유압식 확장기를 이용한 아치형 전주근가 시공법)

  • Kim, J.S.;Kwon, S.W.;Park, Y.B.;Kwon, S.W.;Mun, S.W.;Cho, S.M.;Kim, D.Y.;Kwon, Y.M.
    • Proceedings of the KIEE Conference
    • /
    • 2008.04b
    • /
    • pp.19-21
    • /
    • 2008
  • 현행 배전선로의 전주근가(1.2m 장방형)는 오거크레인을 이용한 건주공사 완료 후 전주근가 시공을 위한 별도의 인력 또는 백호우 장비가 추가로 투입피어 시공함으로써 인력으로는 공사시간이 장기간 소요되고 백호우장비로는 작업장 환경훼손과 시공원가 상승의 문제점이 있었다. 이러한 문제점을 해소하기 위하여 건주공사에 사용되는 오거크레인의 굴착 직경을 80cm까지 확장 가능한 '신축형 오거크레인용 유압식 확장기'와 원형 굴착공에 시공이 가능한 '아치형 전주근가'를 개발하고 이를 이용한 시공기술을 개발함으로써 동일장소에서 굴착작업이 수반되는 건주작업, 전주근가 매설작업을 가능하게 하여 장비활용성 증대, 작업장 환경개선, 공사기간 단축 및 시공원가 절감 등의 효과가 기대되는 기술을 개발하였다.

  • PDF