• Title/Summary/Keyword: 수주자

Search Result 97, Processing Time 0.028 seconds

Evaluation on the impact of Lowest Bid Contracts on Site Operations in times of Severe Economic Downturn (건설경기 침체기의 최저가 낙찰제 건설현장의 운영 실태분석과 개선 방안 도출)

  • Koo, Bon-Sang;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.146-153
    • /
    • 2009
  • The year 2008 was a hard year for Korea's construction companies. The real estate downturn resulted in halting new construction and stopping existing work, and inflation of global oil prices caused price hikes in rebar and concrete materials. As a solution to reducing the budget, the newly appointed government announced plans to increase low cost bid contracts from 10 billion to 30 billion won. When such economical and political factors negatively impact the construction market, projects based on low cost contracts are the hardest hit. Many problems already inherent in low cost bid contracts become accentuated. Consequently, this provides an opportune time to actually study and analyze the issues in these projects. This paper introduces the findings made from investigating four projects struggling to make ends meet in the year 2008. Results show that flow of cash (i.e., liquidity), or lack thereof, was the root cause which in turn was hampered by failed mechanisms for design changes, material inflation. Attributing cash flow risk to the bottom of the production structure (i.e., small business subcontractors) was also a problem within the industry. Contractors need a better way to prepare against material price fluctuations, and owners need to assist in expediting payment during times of extreme downturn.

Need to Reduce Industrial Accidents through the Introduction of an Prevailing Wage System (적정임금제 도입을 통한 산업재해 감축 필요성 고찰)

  • Choonhwan Cho;Yeoncheol Shin;Kyung-Bo Han
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.1-9
    • /
    • 2023
  • In order to carry out construction work, it is urgent to introduce a proper wage system so that the cost burden of projects that have been won due to bleeding competition among original government buildings based on low-priced bids can be transferred to subcontractors. Purpose: Construction with illegal multi-level industrial structure needs to improve the wage reduction environment leading to order (100%) → original contractor (80%) → subcontractor (65%) → load contractor (65%) and aims to ensure wages for end workers. Method: Investigate the current status of labor cost appropriate payment plan in the construction industry, and investigate the case of the appropriate wage system (P.W) in the United States. In addition, the effect and direction of the appropriate wage system are presented. Result: Individual minimum wage security was also mentioned in the Constitution, and many researchers suggested that only the introduction of an appropriate wage system could solve the problem of reducing worker labor and ensure quality and safety. Conclusion: The proper wage system in the construction industry will block illegal multi-level and illegal foreign work, improve the labor environment in the construction market, create an influx of young workers, and have a significant impact on the construction industry's competitive structure, safety, and quality.

The Relationship between Job Satisfaction and Turnover Intention among Fire Protection System Management Workers (소방시설관리업 종사자의 직무만족과 이직의도와의 관계)

  • Lim, Kyoung-Yeon;Kong, Ha-Sung
    • Fire Science and Engineering
    • /
    • v.33 no.6
    • /
    • pp.142-151
    • /
    • 2019
  • This study examined job satisfaction among fire protection system management workers in the fire industry and analyzed how job satisfaction affects turnover intention. The results revealed that, among the control variables, including age, rank, academic background, payment, total career, license, and tasks, significant differences in job satisfaction were found in the tasks between groups, while no significant differences in turnover were found in any control variable between groups. Additionally, the results revealed that, among the lower variables of job satisfaction, increased satisfaction with payment and organizational system affected the degree of turnover intention, while work and promotion did not. These results are to be used as data for human management of technicians and for creating alternatives. Future studies are required to establish a reasonable task rotation cycle for raising job satisfaction, to examine the current status of low-cost orders and countermeasures, and to analyze the direction of development of fire protection system management business.

A Study on China's One Belt, One Road Policy and South Korea's Measures for Facilitating Tourist Visits from China (중국의 일대일로(一带一路) 정책을 활용한 방한관광콘텐츠 전략)

  • Jung, In-Suk
    • Journal of Digital Contents Society
    • /
    • v.19 no.6
    • /
    • pp.1145-1150
    • /
    • 2018
  • In order to realize the new diplomatic development for the establishment of 'Asia Fate Community', Xi Jinping has adopted a "One Road, One Belt" policy. Based on five core philosophies, One Road, One Belt with neighboring countries has been established to full-sided cooperation and mutual benefit relations. In this paper, I would like to suggest some suggestions on how to use China's One Road, One Belt policy and Korea's Eurasian Initiative in Development strategy of tourism contents. First, The bridge role of Korean companies should lead to the development of tourism contents. Second, the promotion of tourism contents development for Chinese individual tourists should lead to another tourism contents. Third, we need to find ways to win joint orders with local companies in China so that they can lead to tourism contents. Fourth, seeking active use of workers and international students living in Korea. Fifth, the development of tourism contents based on cooperative relationship with North Korea.

Improvement of Procedures on Design Deliberation System for Turnkey and Alternative-Design Contracts (턴키.대안입찰 설계심의 및 평가제도의 개선방안)

  • Park, Hong-Tae;Lee, Yang-Kyoo
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.1
    • /
    • pp.31-38
    • /
    • 2011
  • Turnkey and alternative-design contracts was introduced operation in the country from january 2004 to February 2010. this was introduced operation. The selecting method of contractor for turnkey projects has being operated by an open forum type that consists of technical committee and appraisal committee in an integrated design approach deliberations. But to improve the operation of the problems, the government is operating design review committee consisting of the central, local and special design advisory committee in march 2010. But this system has also been suggested as still problems, too many contracts by large companies, increasing of design cost and excessive competition. This study is intended to contribute that turnkey and alternative-design contracts can be well operated in domestic construction markets. In this paper suggests some improvement methods and operational problems caused from application of an open forum type for selecting contractor of turnkey project.

An Application Plan of Cost Information through Actual Date Information DB Construction (공사실적정보 DB구축을 통한 원가정보 활용방안)

  • Kim, Soung-Jik;Kim, Tae-Hui;Min, Kyung-Seok;Kim, Ok-Gyu;Kim, Chan-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.495-498
    • /
    • 2007
  • The latest parceling-out price upper limit ancestor memorial service enforcement, Sale in lots circle is elated interest of society each floor for construction working expenses by open etc. but private investment law for society basis facilities, because circle that is presenting in parceling-out price upper limit ancestor memorial service back is different system (configuration item), cross is expected. A lot of study results connected with cost control expense arbor in the mountains etc. were presented until present, but persistent DB expulsion prohibition. Cost information is standardization unpreparedness of system. It is real condition that is hoarded since research and development by practical use plan presentation unpreparedness etc. Therefore, in this study, desire does actual date use plan presentation by purpose through DB construction after process by information form of good quality so that can collects efficiently and manages and utilizes at construction production step flag firm' s results data which is achieved. Can utilize to data of tool development that maximize ultimately comprehension about employer' s business and business order ability through persuasion, and diverts in cost control business hereafter.

  • PDF

A Study on the Presumption of Proper Construction Cost of Distribution Facilities by Analyzing Actual Construction Cost (실적공사비 분석을 통한 유통시설물의 적정공사비 추정에 관한 연구)

  • Go, Seong-Seok;Kim, Hyun-Sik;Lee, Hyun-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.108-117
    • /
    • 2008
  • The appearance of the large distribution facility of large enterprise putting first reaches get to the various effect until change of leisure life and life pattern of the consumers from the distribution industry of the interior of a country. Competition of the distribution facility upgrade of the distribution facility and it shows the aspect which becomes the semi-department store, and construction cost is appearing different in proportion to each form or scale. Therefore, purpose of this study was to facilitate amicable construction progress between the owner and the builder through estimating the proper construction cost. This study investigated and analyzed the actual cost of 15 domestic distribution facilities and these datums were used to estimate the proper construction cost. This cost shows that from new project accomplishment through analysis of prediction construction cost for feasibility study from initial plan and design step and can be utilizable elementary data bH decision method to whether or not to propriety of distribution facilities business.

A Study on the Product Qualification Criteria through Monte-Carlo Simulation and Association Rule Analysis (군수품 조달을 위한 물품적격심사기준의 조달특성 및 심사분야 배점의 적절성에 관한 연구)

  • Ahn, Namsu;Yeo, Yongheon
    • Journal of the Korea Society for Simulation
    • /
    • v.29 no.4
    • /
    • pp.65-72
    • /
    • 2020
  • The purpose of this study is to analyze the adequacy of product qualification criteria through Monte-Carlo simulation and association rule analysis. We first surveyed the similar procurement systems, then we simulated the bid situation that randomly generated several vendors participated in a bid, and they obtained the score according to the product qualification criteria's judgement area. Then, the company with the highest score will win the bid, and further analysis was performed in terms of performance indicator and satisfaction ratio. The results of this study can be summarized as follows; Although the items related to the credibility accounted for the largest number items, it did not affect the actual bid results. It was analyzed that it is desirable to increase the allocation points in the area of business status and technical capability review than the current one.

Critical Impact Factors Affecting the Performance of Domestic Construction Projects through Megatrend Analysis (거시 환경 분석을 통한 국내 건설 프로젝트 성과의 주요 영향지표 도출)

  • Lim, Hyunsu;Seo, Junghoon;Yoo, Wi Sung;Kim, Chang-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.207-218
    • /
    • 2022
  • Changes in megatrends occurring within the spatial range of the production process can be critical factors that affect the performance of unit projects in construction industry, one of the representative order industries. Although changes in the megatrend are a prerequisite for successful performance achievement, previous studies suggested methods for performance measurement and management within the production process as major results. Accordingly, this study analyzed the megatrend related to domestic construction projects and presented critical impact factors(CIFs) that can be affect a project's performance. CIFs were set by combining keywords derived by reviewing major contents of related laws and policies and future strategy reports, and the importance of each indicator was quantitatively analyzed using analytic hierarchy process(AHP). It is expected that the findings of this study can provide meaningful basic data that the various stakeholders in a construction project can refer to when establishing the strategies to achieve successful performance.

An Investigative Study on the Impact of Construction Policies on Market Entry and Exit of Construction Companies in Daegu and Gyeongbuk Province (건설정책이 대구·경북지역 건설기업의 시장 진입과 퇴출에 준 영향에 관한 조사연구)

  • Song, Jin-Hyang;Lee, Yoonseock
    • Knowledge Management Research
    • /
    • v.24 no.2
    • /
    • pp.211-240
    • /
    • 2023
  • The purpose of this study is to analyze empirically the effects of changes in policies of the construction industry on the entry and exit in the construction industry and to present the direction of changes in construction industry policies based on the analysis results. The purpose of this study is also to present by analyzing the factors influencing the increase and decrease of builders in the actual construction market. The results of the survey indicate that for general contractors in Daegu and Gyeongbuk, which are mostly small and medium-sized construction companies, the strengthening of registration standards (capital, technicians, etc.) has a significant impact on market entry and exit. However, on the other hand, many of the construction policies implemented to eliminate unqualified contractors in the construction market have had the effect of increasing the number of unqualified contractors. This suggests that construction policies in the construction cycle have not achieved their objectives.