A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

수익률의 측정간격과 베타계수

  • Kim, Dong-Hoe
    • The Korean Journal of Financial Management
    • /
    • v.13 no.1
    • /
    • pp.159-184
    • /
    • 1996
  • 재무모형의 검증과 포트폴리오의 성과측정 등에 이용할 목적으로 시장모형에 의한 베타계수를 추정할 때 대부분의 연구들은 측정간격을 달리한 수익률의 자료들 즉 일간, 주간 혹은 월간수익률의 자료들 중에서 임의적으로 하나를 선택하고 있다. 그런데 진정한 투자계획기간과 다른 기간간격에 대하여 계산된 수익률자료의 임의적 선택은 시장모형에 의한 베타계수의 추정치에는 물론 그러한 추정치를 이용한 재무모형의 검증 및 포트폴리오의 성과측정 등에 영향을 미칠 수 있다는 점이 몇몇 연구자들에 의하여 지적되고 있다. 본 연구는 기업규모와 베타의 크기에 따라 구성된 포트폴리오를 대상으로 하여 수익률의 측정간격이 시장모형에 의한 베타계수의 추정치에 어떠한 영향을 미치게 되는가를 실증적으로 살펴보고 있다. 1984년 1월 4일부터 1995년 12월 27일까지의 기간(총거래일수 3515일)에 걸쳐 수익률의 측정간격을 달리하여 산출한 연속복리수익률을 이용하여 분석한 결과에 의하면, 규모나 베타가 시장평균에 비하여 상대적으로 작은 포트폴리오에 있어서는 수익률의 측정간격이 길어짐에 따라 추정되는 베타계수는 더욱 커지고, 반면에 규모나 베타가 시장평균에 비하여 상대적으로 큰 포트폴리오에 있어서는 수익률의 측정간격이 길어짐에 따라 베타계수는 더욱 작아진다는 것을 알 수 있다. 그래서 월간수익률과 같이 장기수익률의 자료를 이용할 경우에 시장모형에 의해 추정되는 베타계수는 규모가 작을수록 크게 나타나지만, 일간수익률과 같이 단기수익률의 자료를 이용할 경우에는 규모가 작다(크다)고 해서 추정되는 베타계수가 반드시 크게(작게) 나타나지는 않는다. 그리고 본 연구는 수익률의 측정간격을 달리함에 따라 추정되는 베타계수에 차이가 나타나는 주된 원인이 각 포트폴리오의 단위기간수익률에 있어서 시장지수의 단위기간수익률에 대한 시점간 교차상관의 상대적 강도에 있다는 것을 보여주고 있다.

  • PDF

VAR를 이용한 금융위험 측정

  • Yu, Il-Seong;Lee, Yu-Tae
    • The Korean Journal of Financial Studies
    • /
    • v.10 no.1
    • /
    • pp.191-214
    • /
    • 2004
  • VaR에 의한 금융위험의 측정은 국제결제은행 바젤위원회의 내부모델 허용에 힘입어 금융산업에서 표준방식으로 확고한 입지를 차지하고 있다. 본 연구에서는 한국주식시장포트폴리오를 거래투자자산으로 보유한 경우의 VaR를 극단치이론에 입각하여 측정하고 이의 성과를 RiskMetrics의 성과와 비교하여 검토하였다. GPD의 모수적 추정에 의한 VaR의 사후검정결과는 표본내 사후검정이나 표본외 사후검정에서 어떤 신뢰수준에서도 기대되는 범위와 크게 벗어나지 않은 안정된 결과를 보였다. RiskMetrics의 EWMA방식도 역시 표본내와 표본외 사후검정 어느 경우에나 기대되는 범위에서 크게 벗어나지 않았지만 높은 신뢰수준에서는 그 성과가 GPD VaR에 비하여 상대적으로 불안정하였으며 위험의 과소평가 성향을 확인할 수 있었다. 비모수적 GEV추정에 입각한 VaR의 경우에는 위험을 과대평가하고 지나치게 보수적인 성향을 나타내었다. GPD의 모수적 접근에 의한 VaR 측정은 다양한 신뢰수준에서 정확한 검정결과를 보여주고 있으며, 시간적 흐름에 따르는 VaR의 행태도 지나친 변동성을 보이지 않아 외부규제 및 내부통제를 위한 금융위험의 측정지표로서 실용적인 가치가 있음을 확인할 수 있다.

  • PDF

The Impact of Key Success Factors and Implementation Typology of SCM on the Business Performance -Using the Balanced Scorecard- (공급사슬관리(SCM)의 핵심성공요인과 추진유형이 기업의 경영성과에 미치는 영향 -균형성과표(BSC)를 활용한 성과측정-)

  • Lee, Jae-Sik
    • Management & Information Systems Review
    • /
    • v.28 no.1
    • /
    • pp.45-69
    • /
    • 2009
  • Today, SCM is used as a important tool of management innovation for enterprise's survival and development. BSC forces managers to focus on balanced measures of business performance that are most critical. The purpose of this study is to find out the determinants of SCM adoption through the analysis which examine the relationship among the key success factors, and business performance using the BSC perspective. This study also gives the suggestion for the effective SCM implementation in the korean companies. This study has been conducted using the data collected from 107 companies implementing SCM. By analyses of the questionnaires, empirical results shows that the implementation of SCM has positive effect on organizational performance with 4 perspectives of BSC. The contribution of this study is that it provides a conceptual framework and empirical evidence of the causal relationship between key success factors, and business performance with 4 perspectives of BSC concept. This study showed that more consideration are essential to obtain balanced business performance for companies with SCM adoption plan.

  • PDF

A Study of the List for CM Product Measure Check-List through 4 Way View;Focusing on Owner, CMr, Designer, Constructor (4자관점을 통한 CM의 성과측정 체크리스트 항목에 관한 연구)

  • Ahn, Eun-Jin;Kim, Ju-Hyung;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.509-512
    • /
    • 2007
  • In Domestic, the beginning of CM system was at December 1996 by 'Construction Industry fundamental law'. Today the needs of CM is more and more during 10 years. Although the time of CM's induction and high-quality human resources are insufficiency, various studies and developments's level through theoritical base and academic level is good which are compared by developed countries's. But still now the effort of CM product measure part, especially public sector is not enough. Besides, the existing check-list is for project owner so it needs to make up for balanced view as organized 4way-view of owner, CMr, designer, constructor. On this study, produce the list of check-list and then weight of each list by view of owner, CMr, designer, constructor. The completec check-list will be useful for CM product measure objectively .

  • PDF

Development of Performance Indicators on Private Building Construction Sites using Supervisory Report (감리데이터 기반의 민간 건축현장 성과지표 개발)

  • Sung, Yookyung;Hur, Youn Kyoung;Lee, Seung Woo;Yoo, Wi Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.65-75
    • /
    • 2022
  • As performance measurement is important for systematic management, the key indicators for performance measurement have been consistently researched in the construction industry. However, there are only a few cases in which performance measurement is performed because it requires strenuous efforts to collect data for measurement. Unlike the public sector, which has been collecting project data through laws, the private sector has very little data to measure performance. In contrast, supervision work concerns important data necessary for the performance management on building construction sites in accordance with the Building Act. Therefore, in this study, we used the data from supervisory reports to measure the performance of private building projects. First, we derived 6 performance areas and 15 indicators through a few rounds of expert group discussions and 2 surveys. Then, we identified the performance indicators with high feasibility of data collection and computed their degree of significance via the analytic hierarchy process. It is expected that the performance indicators and their computational processes derived in this study can be used to systematically measure the performance and aid the speedy diagnosis of private building construction sites.

The System Development for Managing Outcomes based on URI (OntoStore-K$^{(R)}$: URI 기반 성과 관리 시스템)

  • Kim, Pyung;Lee, Seung-Woo;Lee, Mi-Kyung;Kuh, Nam-Ang;Kang, In-Su;Jung, Han-Min;Sung, Won-Kyung
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2006.10b
    • /
    • pp.209-212
    • /
    • 2006
  • 연구 활동의 결과물로 생성되는 성과물(논문, 특허, 보고서)은 연구 성과를 측정하는 중요한 척도로서 사용될 뿐만 아니라, 연구에 참여한 연구자 및 연구자가 소속된 기관의 연구 동향 정보를 판단하는데 활용될 수 있다. 본 논문에서는 제안하는 성과 관리 시스템(OntoStore-K$^{(R)}$)은 정보 자원의 식별을 위해서 인력, 기관, 부서, 성과물 등 사용되는 모든 자원에 URI를 할당하고, 이를 기반으로 성과 정보를 등록하고 관리함으로써 정확한 성과 관리를 지원한다. 또한 URI 기반의 성과 정보가 추론 규칙을 통해 확장되면서 다양한 부가 정보를 획득할 수 있는 기반을 제공한다. 본 시스템을 통해 연구 성과물에 대한 정확한 관리는 물론, 연구 성과물에 대한 효율적인 공유 및 접근이 가능함으로써 연구 활동을 촉진할 수 있는 기반이 마련될 수 있다.

  • PDF

A Study of Evaluation Process and Chart of PPC considering Variation (변이를 고려한 PPC 평가절차 및 평가차트 제안)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.75-83
    • /
    • 2009
  • PPC stands for the percentage of weekly assignments completed. It makes it possible to improve the performance of production planning and control systems. Recently, the cases of PPC application have been increasing because PPC is easy to apply to construction site. However, to evaluate the average of PPC or analyze PPC as time passes has some problem ; if PPC is the same, the average it is evaluated equally although there are variabilities in production system. Therefore, In order to evaluate the character of PPC in process of production this paper suggests the method of the evaluating PPC by using coefficient of variability besides PPC measurement.

A Study on the h-Index and Its Variants (h-지수 및 변형 지수에 대한 연구)

  • Lee Jae-Yun
    • Proceedings of the Korean Society for Information Management Conference
    • /
    • 2006.08a
    • /
    • pp.135-142
    • /
    • 2006
  • 인용을 통한 연구성과 지표인 h-지수는 2005년에 제안된 이후 공식의 간단명료함, 용이한 산출 방법, 지수의 강건성 등이 인정되면서 계량정보학 분야를 비롯한 학술 공동체의 활발한 후속 논의가 이례적으로 신속하게 이어지고 있다. 후속 연구는 주로 h-지수의 타당성 검토, h-지수를 이용한 특정 분야의 개인성과 측정 시도, h-지수의 타 영역에의 응용, h-지수의 보완 등을 주제로 전개되고 있다. 이 연구에서는 우선 h-지수와 이를 보완한 g-지수를 비롯한 변형 지수에 대해서 현재까지 전개되고 있는 논의를 살펴보았다. 그리고 인용빈도가 높지 않은 경우를 고려하여 개선한 지수를 제안하고 실험적인 측정을 시도하였다.

  • PDF

BSC Perspective of an Exploratory study of Developing CSF/KPI Pool in Korean Construction Industry (국내 건설 산업의 BSC관점의 CSF/KPI Pool 개발에 관한 연구)

  • Oh, Ic-Jin;Lee, Jung-Hoon;Lee, Choong-C
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.600-607
    • /
    • 2005
  • 최근 무형자산의 중요성과 함께 많은 선진기업들은 지속적인 가치창출을 위한 전략수립 및 수행절차를 통해 경쟁우위를 갖는데 노력하고 있다. BSC는 기업의 전략을 전사조직 차원에서 실행 시킬 수 있는 기반을 조성하며, 기업의 자원을 핵심역량에 집중시켜 전략의 실행력을 구체화하기 위한 경영기법 중 하나로 자리잡고 있으며, 이미 국내 다양한 공공 및 민간부문에서 BSC도입을 통해 기업전략과의 연계를 강화해 나가고 있는 추세이다. 그러나 특정산업에 따라 각 산업의 특성을 고려한 BSC기반의 CSF(사업핵심성공요소)와 KPI(주요성과지표) Pool에 대한 실질적인 연구는 다소 미흡한 실정이다. 국내 건설업인 경우, 관리의 복잡성으로 인해 아직까지 재무적 손익 중심의 성과측정에 주로 의존하고 있으며, 비재무적인 측면의 다양한 성과지표를 포함하지 못하고 있는 실정이다. 이에 본 연구에서는 건설산업에 적합한 BSC관점을 고려한 건설업의 CSF/KPI Pool를 제시하고 도출된 CSF가 기업의 경영성과와 어떤 상관관계를 살펴봄으로써 실제 의미가 있는지 알아보는데 목적을 두고 있다. 본 연구결과는 건설 산업에서의 성과측정의 기초자료로서 활용되어 체계적인 성과관리의 향상에 기여하고 미래 성과창출의 유인을 제공하고자 한다.

  • PDF