• Title/Summary/Keyword: 성과검증

Search Result 4,990, Processing Time 0.04 seconds

The Effects of R&D Process Maturity on Product Development Performance: Focused on Mediating Effect of R&D Project Performance (R&D 프로세스 성숙도가 제품개발 성과에 미치는 영향: R&D 프로젝트 성과의 매개효과를 중심으로)

  • Shin, Kyung Sic;Oh, Min Jeong;Kim, Won Ki;Park, So Hyun
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.7 no.7
    • /
    • pp.165-174
    • /
    • 2018
  • The purpose of this study is to verify the effects of R&D process maturity on product development performance and to verify whether R&D project performance mediating effect. The questionnaire was collected and analyzed to 131 persons related to the R&D work in 55 companies and public institutions performing R&D work. The results of this study are as follows, the effect of R&D process maturity on product development performance and mediating effect of R&D project performance were analyzed by simple and multiple regression analysis. Regression analysis was analyzed by SPSS statistical program. The higher the maturity level of the R&D process, the higher the product development performance and the R&D project performance, and the R&D project performance is partially mediated. It is concluded that it is important to establish and operate a systematic R&D process and to develop a project management methodology suitable for the characteristics of a company in order to improve product development performance. It is expected that if this study are utilized as practical R&D management methodology in corporate management, it will contribute to improvement of company product performance.

정보시스템의 자원, 능력, 품질이 기업성과에 미치는 영향

  • Gu, Ja-Hwan;Jeong, Ho-Won
    • 한국경영정보학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.69-74
    • /
    • 2007
  • 기업이 비용절감과 경쟁우위 등을 목적으로 정보시스템에 대한 투자를 확대함에 따라 정보시스템 성과는 경영자뿐만 아니라 연구자에게도 중요한 관심사항이다. 기존 연구는 정보시스템 성과에 영향을 미치는 요인에 대해 정보시스템의 자원이나, 능력, 품질 등 개별적인 관점에서 접근하였다. 그러나 본 연구에서는 정보시스템 자원과 조직자원이 정보시스템 능력에 영향을 미치고, 정보시스템 능력이 높아지면 정보시스템 품질과 업무프로세스 성과가 향상되어 기업성과도 높아질 것이라는 통합 연구모형을 제시하고 이를 실증적으로 검증하였다.

  • PDF

'QFD'활용 및 '성과지표 Positioning Map'을 적용을 통한 성과지표 분석

  • Im Ji-Yeong;Han Seok-Gi;Song Yong-Il;Jeong Yun-Cheol
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2006.05a
    • /
    • pp.113-127
    • /
    • 2006
  • 본 연구에서는 최근에 민간 부문 뿐 아니라 정부부처를 포함한 공공기관에서 확산되고 있는 BSC 성과관리 시스템을 통해 BSC관점에서 출발하여 구성되는 BSC 성과지표이 BSC관점 및 기관이 추구하는 가지고 있는 전략방향과 어떠한 상관관계를 얼마만큼 가지고 있는지를 확인하고, 이를 전략적으로 활용할 수 있는 도구로서 "성과지표 Positioning Map"을 제안하고, 이를 KIST의 BSC 주요성과지표의 내용으로 분석하여 이를 검증해보고자 한다.

  • PDF

The Study on the Generation of Verifying Rules for Consistency and Completeness of the Unified Modeling Language Diagrams (UML 다이아그램간의 일관성과 완전성을 위한 검증 규칙 생성에 관한 연구)

  • 김재웅;김진수;김치수;황선명
    • Journal of Korea Multimedia Society
    • /
    • v.3 no.3
    • /
    • pp.290-297
    • /
    • 2000
  • For verifying consistency and completeness of some UML diagrams as a representative of the graphic notations for object-oriented designs, we first give an analysis of some UML diagrams and apply simple ER model to the UML diagrams. Next, we formally define this graphical representation as a set of sets and a set of functions. According to the semantics of these functions, we derive a set of rules to assure the consistency and completeness of this graphical representation. These rules will be included with a CASE tool, which possesses both the diagramming facility and the consistency and completeness checking capability.

  • PDF

Development on the M&V Protocol for DSM Investment Program (수요관리 투자사업의 성과검증(M&V)모형 개발)

  • Cho, Sung-Hwan;Choi, Bong-Ha;Kim, Euy-Kyung;Jeon, Ho-Cheol
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.237-242
    • /
    • 2008
  • DSM(Demand Side Management) is reducing the load of energy supply utility through energy conservation and energy load distribution. This kind of program is necessary especially to our country which import above 97% of energy source. But the effectiveness of this kind program is not verified well even though our country is executing the various DSM programs. This study suggests M&V(Monitoring & Verification) guideline for DSM programs which are executing in Korea and shows the results which applied to verification of DSM programs.

  • PDF

데이터 마이닝 기법의 성과측정시 표본추출 및 표본구성비의 영향에 관한 실증적 연구

  • 김광용
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 1999.10a
    • /
    • pp.383-390
    • /
    • 1999
  • 본 연구의 목적은 이원화된 위험을 분류하는데 사용된 여러 가지 데이터마이닝(datamining) 기법들의 성과를 측정·비교하는데 있어서, 표본추출(sampling error)의 영향, 표본의 구성비 영향, 기존의 전통적 위험예측치의 문제점등을 살펴보고, 새로운 위험예측치를 제시하여 실증적으로 비교, 검증하는 것을 연구의 주목적으로 하고 있다.

  • PDF

Seismic Qualification of Plant Protection System Cabinet for Nuclear Power Plant (원자력발전소 보호시스템 캐비넷의 내진검증)

  • 정명조;황원걸
    • Computational Structural Engineering
    • /
    • v.6 no.2
    • /
    • pp.79-86
    • /
    • 1993
  • A method to verify seismic qualification of the plant protection system cabinet for a nuclear power plant is presented. A finite element model of the cabinet is developed and the dynamic characteristics are obtained. The results of the modal analysis provide insight into the fundamental dynamic properties of the structure, which correspond to the frequency of the peak values of the input seismic spectrum. It necessitates the design modification of the reference cabinet. Techniques for verifying structural integrity and operability are exemplified by summarizing response spectrum and time history analyses of the structure.

  • PDF

A VEE Algorithm Improvement Research for Improving Estimation Accuracy and Verification Responsibility of The AMI Meter Data (AMI 계량데이터의 검증 신뢰성 및 추정 정확도 향상을 위한 VEE 알고리즘 개선 연구)

  • Lee, Jaekwan;Shin, Jinho;Joo, Yongjae;Noh, Jaekoo;Park, YoungBae;Jung, Namjoon
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.4
    • /
    • pp.557-562
    • /
    • 2016
  • 계량데이터 관리 시스템은 수용가에서 검침된 계량데이터를 수집하고 관리하는 시스템이다. 이 시스템에는 검침된 데이터의 오검침과 유효성을 판단하는 검증과 누락된 검침값이나 오검침으로 판단된 구간값을 추정하는 VEE 알고리즘이 있다. 그러나 기존의 VEE 알고리즘은 현장 데이터의 특성을 반영하지 않고 검증하고 추정하기 때문에 그만큼 신뢰성과 정확도가 낮아지는 단점이 있다. 본 논문에서는 검증 신뢰성과 추정 정확도를 향상시킬 수 있는 차세대 VEE 알고리즘을 제안한다.

체계적위험과 비정상성에 관한 연구

  • Lee, Jin-Geun
    • The Korean Journal of Financial Studies
    • /
    • v.4 no.1
    • /
    • pp.233-258
    • /
    • 1998
  • 본 연구는 비정상성과 관련된 기존의 연구들이 베타위험과 추가설명변수들 사이의 상관관계를 무시한 검증방법의 오류를 지적한다. 그 상관관계를 고려한 포트폴리오 구성방법을 선택한 후, 비정상성에 관한 좀 더 정밀한 검증을 실시하여 규모효과와 EP효과를 검토한다. 더 나아가 CAPM의 두 가지 주장, 즉, 베타위험의 유일성과 이 위험과 그 자산의 수익률간의 양의 상관관계를 갖는다는 두 가지 주장을 세밀히 검토하게 된다. 또한 이 모든 검증에서 등가중지수(Equal-Weighted Index: EWI)와 가치가중지수(Value-Weighted Index: VWI)의 적용에 대한 차이도 동시에 검토하였다. 1980년 1월부터 1993년 6월까지의 월별수익률과 한국신용평가주식회사의 주식수익률 데이터베이스(KIS-SMAT), 재무제표 데이터베이스(KIS-FAS)를 이용하여 검증한 결과, 한국중권시장에서는 규모효과만 존재하였고, EP효과가 존재한다는 증거는 얻지 못하였다. 또한 EWI와 VWI의 지수에 대한 차이는 아주 미미하였다. 특히 CAPM에서 주장하는 베타위험의 유일성과 베타위험과 그 자산의 수익률의 양의 상관관계에 대한 두 가지 사실에 대해서는 오히려 상반된 증거만을 확인할 수 있었다.

  • PDF

A Research on the PMO Functions and PMO Management Level to Increase the IS Project Performance (정보시스템 프로젝트 성과 향상을 위한 PMO 기능과 관리수준에 관한 연구)

  • Lee, Jae-Beom;Jang, Yun-Hi;Kim, Sang-Yeol
    • Journal of Digital Convergence
    • /
    • v.9 no.2
    • /
    • pp.111-129
    • /
    • 2011
  • Nowadays, the IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques to decrease project failure and to increase IS project performance. This research is to seize the management level of PMO affecting on the IS project, as a new method to increase the IS project development performance. As a result of surveying the present PMO operation state with banks which are the leading industry to accept the PMO in Korea, technology support management and infrastructure management are the core functions to affect the IS performance including schedule management, quality management, and user and stakeholders' satisfaction. Also, the PMO management level is the important point of IS project success. Among the 5 levels PMI suggested, PMO can implement the project effectively at least at the third level. Korean companies introducing the PMO have to do research the PMO core functions and the management levels according to the project scale, and review the distinctive features of their organization to increase the maturity of IS project. This research has been proved through the Full Structural Equation Model. The results show that the five core functions of PMO have relationship with the IS project performance.