• Title/Summary/Keyword: 설계.시공일괄입찰

Search Result 34, Processing Time 0.029 seconds

Analyzing Characteristics of Design-Build Delivery System in Korea Using System Dynamics Modeling (시스템다이내믹스 모델을 이용한 국내 설계시공 일괄입찰 발주방식 특성분석)

  • Lee, Hyun-Soo;Ji, Sae-Hyun;Park, Moon-Seo;Song, Sang-Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.119-131
    • /
    • 2007
  • Design build (DB) is a construction project delivery system which has become one of the favored ones and the growth of DB by the public agencies has been steadily increasing. DB can be viewed as an evolutionary project delivery system, since DB project team members collaborate on work with each other, keep seeking cost effective and innovative alternatives that meet the construction needs of the project. Thus DB outperformed others in delivery speed, cost saving, and turnover quality. In Korea, DB projects likewise have steadily increased that it is needed to analyze characteristics of DB delivery system in Korea. For that purpose, this research would offer an analysis of characteristics of DB delivery system in Korea using system dynamics model with investigating the public market trend, comparing DB performance to DBB, and analyzing questionnaire survey.

An Example of Ordering a Bid of Design and Construction as One Package - A new construction of graduate students' dormitory and foreigner.researchers' house of Seoul National University - (설계.시공(設計.施工) 일괄(一括) 입찰(入札)(턴키방식(方式)) 발주(發注) 사례(事例) - 서울대학교(大學校) 대학원기숙사(大學院寄宿舍) 및 외국인.연구원숙소(外國人.硏究員宿所) 신축(新築) 공사(工事) -)

  • Chung, Jae-Sung;Choi, Jung-Hee
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.7 no.4
    • /
    • pp.66-71
    • /
    • 2000
  • PDF

A Study of Analysis for Impact Assessment of the Cost Risk-Factor on the Design-Build Projects based on Business Process (설계시공일괄방식 사업의 업무단계별 사업비용 리스크요인에 대한 영향도 평가 및 분석)

  • Seo, Jae-Pil;Lee, Sang-Hyun;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.14-24
    • /
    • 2012
  • Recently, a delivery system has been rapidly changed in the global construction market. Also, construction projects are becoming bigger and more technology-intensive. A lot of projects have been delivered by Design-Build(DB) System; from the standpoint of cost, approximately 40% of delivered constructions by a Public Procurement Service were DB in 2009. Nevertheless, the achievement has not surpassed our expectations on management of the project cost. On the characteristic of DB, the reasons why that happens are that projects contract have been signed after the Design Development Stage; the insufficient review about new technology and up-to-date construction methods; a lack of discussion in process of design. Those reasons cause a risk of increasing Cost of the projects. In order to solve these problems, it is desirable to find Cost-increasing factors in promoting the projects and select on the order of priority for Risk-Factor with careful management. Therefore, this study analyzed the weight of each phase of the project on the authority of properties of DB project, and identified Risk-factors which is increasing the cost on the aspect of project management. Based on this analysis, the impact assessment of Risk-factor is evaluated through the Failure Mode and Effect Analysis(FMEA).

A Reduction of Claims for Efficient Turn-key Project (효율적인 턴키사업 추진을 위한 클레임 저감방안)

  • Oh, Ye-Keun;Sohn, Jeong-Rak;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.122-130
    • /
    • 2012
  • Currently, TK(Turn-key) projects have been implemented, the projects on TK basis still have shown several problems rather than its own merits as a bidding method. Increasing the number of claims being occurred during construction process of the projects is reality because of unclear notice of tender documents and conditions of the contract, design review system, and decision process of the qualified bidder. To establish desirable TK projects in domestic market, not only should resonable alternatives for carrying out design review system and selecting the bid winner be set up, but also proper standards for reforming irrational system of contract, bid, and notice of tender related to TK projects. This study is intended to reduce the number of claims and implement efficient projects of apartment construction on TK basis by identifying potential problems through analysis of claim examples of TK projects which have difficulties of revising contract agreement such as drawings and suggesting improvement methods for contract conditions and notice of tender docuements.

Analysis of Change Process in the Design Conditions of Harbor Breakwaters in Korea (우리나라 항만 방파제 설계조건의 변화과정 분석)

  • Hong, Keun;Kang, Yoon-Koo;Kim, Hong-Jin;Yoon, Han-Sam;Ryu, Cheong-Ro
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.30 no.3
    • /
    • pp.123-133
    • /
    • 2018
  • We studied the change process in the design parameters (conditions) of structural sections of vertical/slope breakwaters in Korea over the long term based on an analytical review of the latest design recommendations. This study found the following. 1) Design wave heights have increased gradually with the increase in the wave height of deep sea waves. 2) The relative design wave height ($H_{1/3}/h$) changed from 0.5 in the 1970s to 0.6~0.7 today. This means that design wave heights are overestimated compared with the water depth. 3) Before 1999, the design water level was based on high water during an average spring tide, but this has been increased since 2000 because of additional consideration of anomalous sea levels. 4) Before 1999, the relative crest heights of the investigated breakwaters was 0.6~0.7, but after 1999 this increased to a mean of 1.0 and maximum of 1.26.

Analysis of Domestic and Overseas Environment to Introduce Performance Warranty Contracting for Pavements into Korea (도로포장 성능보증계약제도 도입을 위한 국내외 적용환경 분석)

  • Kim, Tea-Song;Seo, Yong-Chil;Lee, Sang-Beom;Koo, Jai-Dong;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.216-221
    • /
    • 2008
  • This study has been carried out in order to observe the status of performance warranty contracting system currently being implemented at the advanced countries including Europe, U.S.A., and Japan, review the introduction feasibility and possibility. For this purposes this study has surveyed the concept and necessity of performance warranty contracting system as well as the status of domestic performance warranty contracting system. Especially the application environment for the performance warranty contracting system of Europe, U.S.A., Japan and Korea in terms of maintenance guarantee liability system, performance warranty regulations for design-build contracting system, selection method of successful bidder, performance warranty means, project contracting system including maintenance cost, and specifications and contract conditions for performance warranty system have been comparatively evaluated. And introduction methods of performance warranty contracting system were suggested.

  • PDF

The Investigation and Performance Assessment of the Design-Build Projects in Korea (국내 턴키/대안공사 실태조사를 통한 턴키/대안 입찰제도의 성과 분석)

  • Kim Sun-Hee;Kim Du Yeon;Park Sang Hyuk;Yeom Sang Min;Chae Myung Jin;Han Seung Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.462-467
    • /
    • 2004
  • Design-build, which is defined as single source responsibility for design and construction, has been widely used in large public works since governmental formulation of measure for encouraging use of design-build in 1996. However, civic groups and small and medium sized enterprises are highlighting over-competition and unbalanced market shares of conglomerate in domestic design-bid market and insisting on decrease in the use of design-build and absorption into the lowest-price bidding. This study collected information about cost, schedule, quality, new technology adoption from 51 civil design-build projects and measured their performance.

  • PDF

Design Development Management in the Design-Build Project by Cast-Study (사례 분석을 통한 턴키 프로젝트 실시설계 업무 관리방안)

  • Lee Hwang-Ku;Kim Young-Jae;Kim Kyung-Rai;Park Chan-Sik;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.128-136
    • /
    • 2003
  • The contractors which execute the design-build project have difficulties in design management and contract administration in the pre-construction phase because they have managed construction projects focused on only construction phase so far. Moreover, they have to manage the design development stage without any contingency following-up various design revisions from the design reviews of outside experts. Therefore, the design management in the design development stage is a critical success facto. of the design-build project. The objective of this study is to structure the problems in the management skill for design development phase in the domestic design-build projects and to suggest a design development management method to settle the problems. To achieve these objectives, this study 1) analyzes the prior studies about the design-build procurement methods, 2) designs and performs a case study to embody the problems of the domestic design-build projects, and 3) proposes a method of design development management by analyzing the results of case study and interviewing experts.

Institutional Research for the Introduction of Construction Management at Risk in the Public Sector (시공책임형 CM의 국내 공공부문 도입을 위한 제도적 기반 수립 연구)

  • Park, Jiho;Kim, Kyungrai;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.20-28
    • /
    • 2021
  • The Domestic Construction Industry is in the process of changing from a one-sided production method centered on the contractor to a production method in which the order and the contractor can collaborate. Depending on the delivery method, the bid/success method, the contract method, and the degree of business involvement of the order may also vary. In this thesis, in order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bid process analysis, contract fulfillment and management analysis, post management analysis, and related laws and regulations for legalization In order to suggest a plan for the efficient operation of the system, a system and case analysis of domestic and international construction responsibility type construction project management was conducted. 'Construction Responsible Construction Project Management' defined in the Framework Act on the Construction Industry is divided into the main contract transfer contract, which is a service contract performing pre-con work, and the main contract, which is construction project management and construction contract. Therefore 'Construction Management at Risk' should be regarded as one of the ordering methods rather than a successful bid system, as in the case of overseas, and legalization as a bidding system equivalent to design/construction batch bid and technology proposal is necessary for introduction. In order to introduce 'Construction Management at Risk' suitable for the domestic environment, domestic and foreign institutional analysis, bidding process analysis, contract fulfillment and management analysis, and follow-up management analysis are conducted. A method for efficient operation was suggested so that it can be applied in the domestic market while maintaining the original merits of this system.

Cost Performance Comparison of Project Delivery Methods in Public Sector - Focusing on Mediator Effect of Biddropping on Change Orders - (공공건설공사 발주방식에 따른 비용성과 실증비교 - 설계변경에 대한 낙찰률 매개효과를 중심으로 -)

  • Moon, Hyosoo;Lee, Hyun-Soo;Park, Moonseo;Lee, Bogyeong;Joo, Seonu;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.86-96
    • /
    • 2015
  • According to previous research, the reason why Design-Build(hereinafter "DB") outperforms Design-Bid-Build(hereinafter "DBB") in terms of cost is due to less change orders(hereinafter "COs"). However, if biddropping was low for DBB resulting into increasing COs, then it would be wrong to conclude that DB is superior due to less COs. Therefore, in order to confirm such misjudgment, the attempt to comprehensively analyze biddropping, COs and delivery method was made as previous methods had analyzed either the relationship between delivery method and COs, or biddropping and COs. This research uses path analysis, which simultaneously compares effect sizes on COs according to delivery method and biddropping based on the project type, and validated the mediator effect. The research proved that DB outperforms DBB due to less COs cannot be validated as biddropping caused a mediator effect by intervening between the delivery method and COs for specific project types. Therefore, the mechanism of delivery method acts on COs through biddropping was established. Also, the identity of biddropping was investigated in a different perspective from previous research. Based on this result, this research is expected to help determine a delivery method by considering the mediator effect of specific projects and evaluate performance.