• Title/Summary/Keyword: 설계시공일괄

Search Result 67, Processing Time 0.023 seconds

A Study on the Success Model for Design-Build Delivery Method Process (설계시공일괄방식 프로세스 성공모델에 관한 연구)

  • Kim Jeong-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.119-127
    • /
    • 2003
  • Among project delivery methods, Design-Build method is becoming an increasingly preferable alternative to traditional contracting method. The Design-Build delivery method was first introduced in Korea, 1975. But it still has been producing many problems. The previous researches had been suggested several ways to improve the Design-Build project delivery but it seemed to have had no effect whatsoever. This research proposes the success model for Design-Build delivery method through the 4 steps. First, find the proper modeling method. Second, establish the As-Is model for analyzing the circumstances of Design-Build method. Third, to begin with analyzing the As-Is Design-Build model and previous researches, establish the problem model. Finally, find success factors and circumstances through the overseas Design-Build system, and then establish the success Design-Build model.

Application of Partnering and Constructability in the Design Development Phase of Public Design-Build Projects (공공부문 일괄사업 실시설계단계의 파트너링과 시공성 분석 적용방안)

  • Nam, Yong-Ho;Yeon, Hee-Jung;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.531-534
    • /
    • 2007
  • In the current domestic design-build contract, design and construction are separated due to prohibition of outside work. but instead the design-build contract adopts a method of fulfilling each assignment as a joint venture, which makes it difficult for participants to communicate each other and often require changes of design. also, It is difficult to performance efficiency project that they don't want to share useful information related to design and construction. In this study suggests how to maxmize the effiency of the project by proposing a process model connected with an efficient partnering and constructability in a deign development phase of design-build constract.

  • PDF

Improvement of the Design-Build Bidding in the Domestic Construction Industry (국내 설계시공일괄입찰방식 개선방안)

  • Kim Su-Hyun;Jeon Min-Jeong;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.410-413
    • /
    • 2003
  • In order to build up competitive power in construction market and to cope with international policy, Design-Build bidding is one of the viable bidding system, encouraging collaboration between design office and building construction firm. Design-Build is a promising delivery system to help expediting schedules, saving costs, and improving Quality. However, the problems of Design-Build project in the domestic construction industry are not to be able to take advantages of fast-tracking and value engineering process, because of the problems of inappropriate system and participants' inexperience. The purpose of this study is to suggest alternatives for Design-Build bidding of public sector in the domestic construction industry in the costs, quality and time aspect.

  • PDF

설계$\cdot$시공 일괄입찰제도 개선

  • 조영준;남정수;김홍만;이태식
    • 월간 기계설비
    • /
    • s.35
    • /
    • pp.28-42
    • /
    • 1993
  • 최근들어 우루과이 협상의 진전이 가사화됨에 따라 서비스업의 개방이 현실적인 사항으로 인식되고 있고, 서비스업으로 분류되는 건설업도 개방압력에 직면해 있다. 건설시장의 개방에 따라 가장 크게 우려되는 부분은 국내업체의 설계 및 엔지니어링 분야를 들 수 있으며 선진외국 건설업체와 비교했을 때 매우취약한 실정이다. 이에 대처하기 위해 설계 및 엔지니어링 기술을 육성시킬 수 있는 기술경쟁입찰 풍토를 조성할 필요성이 있으며 설계 및 시공단계의 상호조정을 통하여 공사수행을 보다 효율적으로 수행할 수 있는 일괄입찰제도의 확대운용은 필수적이라 하겠다. 따라서 본 연구는 국내 일괄입찰공사의 확대시행을 위한 현행 일괄입찰제도의 개선방향을 설정하고 일괄입찰제도 절차의 개선안을 제안하여 설계입찰자의 평가 및 낙찰자 선정에 대한 구체적인 개선안을 도출하고자 하였다. 이와 같은 개선방안의 마련을 위해 설문 및 면담조사가 실시되었으며 최종적으로 실무자들과의 총의회를 통하여 최종안을 제안하였다. 본 연구의 주된 내용은 일괄입찰공사유형의 제시, 사전자격심사, 입찰서류 및 입찰기간, 입찰자평가시 발주처참여, 낙찰자선정, 실시설계판정, 건축$\cdot$토목$\cdot$기계$\cdot$설비에 대한 새로운 평가체계 제시 등으로 요약할 수 있다.

  • PDF

An Analysis on the Problems of General Conditions for Domestic Design-Build Construction Projects (국내 설계${\cdot}$시공일괄발주방식을 위한 공사계약 일반조건의 문제점 분석)

  • Seo Young-Min;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.303-306
    • /
    • 2003
  • Although design-build construction projects have recently increased. general conditions of construction contract are not reflecting the characteristic of design-build construction projects neither performing its fundamental roles as implying many claim elements. So. this study aims to propose the basis for improving the general conditions of the domestic design-build construction projects. This study reviews literatures associated with design-build construction contract and analyses domestic general conditions into foreign standard forms of general conditions. Additionally, it is examined the problems of design-build construction contracts and performed questionnaire survey to the practitioner in the construction contract field. In doing so, this study suggests the direction for improving general conditions of domestic design-build construction projects.

  • PDF

A Coordinative Committee Model between Architects and Contractors in Design-Build Projects (설계시공일괄공사에서 설계자와 시공자 간의 단계별 중간협의체 운영모델)

  • Kong Seung-Hwan;Kong Seung-Hwan;Eom Ik-Joon;Koo Kyo-jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.323-328
    • /
    • 2004
  • Domestic Design-Build, which has applied for client's convenience, has many problems Because It is being applied in the building law, which devides between architects and contractors. Among problem the relation between architects and contractors is a typical problem. It makes a quality decline and a design skill decline. In result, it causes insufficience of competitive power in overseas projects from now on. So we present the plans to improve mutual relations between architects and contractors. And we induce development of design skill and good quality of building by presenting a coordinative committee model between them in Design-Build projects.

  • PDF

Application of Incentive on Design VE to Public Design-Build Projects (공공부문 설계시공일괄사업의 설계VE 인센티브 적용방안)

  • Lee, Hun-Woo;Jung, Jae-Hoon;Kim, Hae-Gon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.284-288
    • /
    • 2006
  • Ministry of Construction & Transportation prescribes that all of the construction works including Design-Build whose cost more than then billion won must be applied VE at the design phase. It is difficult to apply VE at the design development phase to design-build projects under current design-build contract because design should be proceeded with fixed price by bidding. Therefore the present study suggests an application of incentive which can maximize the effectiveness of design VE in design-build projects after analysing current design-build's characteristics and difficulties of design VE application.

  • PDF

Case Study in Current State of Amount of Order for Turnkey Project (설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석)

  • Lee Yang-Kyoo;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.197-202
    • /
    • 2004
  • Turnkey contract system is an effective ordering system for the organizations that technical engineers are insufficient in their construction projects. It is possible to reduce project duration and to improve project Quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system in our country. The results includes various methods for improving the system based on the analysis of bid price nd selection procedure.

  • PDF

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF