• Title/Summary/Keyword: 설계변경 요인

Search Result 113, Processing Time 0.029 seconds

A Priority and Impact Factor Analysis of Construction Management Tasks for Decreasing Change Orders and Defect Repairs in Cancer Treatment Center Projects (암센터 의료시설의 설계변경과 하자보수의 감소를 위한 중점 관리공사 분석)

  • Lee, Chijoo;Lee, Ghang;Sim, Jaekyang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.55-64
    • /
    • 2013
  • The complexity of constructing medical institutions is higher than that of general buildings, and many change orders in the design and defect repairs in the construction phase are required due to strict government regulations. The priority control of constructions and impact factors of medical institutions were analyzed in this study, and difficulties in the control in the design and construction phase were identified. First, the priority management factors that were identified were as follows: architecture, facilities, and electricity. Second, 1) priority management in constructions and factors resulting in change orders and 2) priority management in constructions involving defect repair were analyzed. Third, the importance recognized by the construction managers were analyzed. The priority management in constructions and factors that were recognized by the construction manager were deducted as having low importance, although there were many change orders and defects. The work of finishing, wall building, joining, office automation and communication function, and lighting were analyzed in the design phase, and waste, the office automation and communication function, ceilings, contamination control, and plumbing were analyzed in the construction phase. The results showed that there will be a decrease in change orders and defects if the concentration of the manager was elevated and priorities were managed.

A Design Method of UI System based on Formal System Specification (시스템 형식론에 의한 사용자 인터페이스 시스템 설계 방법)

  • 김은하
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.10a
    • /
    • pp.41-45
    • /
    • 1999
  • 본 논문에서는 소프트웨어 시스템의 설계 및 구현 과정에서 있을 수 있는 설계 변경 및 이에 따른 다른 변경 요인들을 정확하게 파악하고, 구현상의 변경으로 인한 전체 시스템이 영향 등을 체계적으로 정립하는 소프트웨어 설계 방법론을 특정 공정의 사용자 인터페이스 시스템을 통해 제시하였다. 대상 시스템, 즉 인터페이스 시스템을 시스템 이론(System theory)에서 정의하는 구조적 입출력 시스템 레벨(Structural I/O System level)의 요소들로 표현하고 다시 구조적 입출력 시스템 레벨을 입출력 시스템 레벨(I/O System level)로 변환하였다. 이를 다시 DEVS 모델로 재구성하여 DEVS(Discrete EVent system Specification) 시뮬레이션 환경에서 제공하는 시뮬레이터를 통하여 대상 시스템의 중요한 동적 특성을 소프트웨어 초기설계 시 또는 설계 변경 후 미리 파악할 수 있도록 하였다.

  • PDF

Predicting Dynamic Response of a Railway Bridge Using Transfer-Learning Technique (전이학습 기법을 이용한 철도교량의 동적응답 예측)

  • Minsu Kim;Sanghyun Choi
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.1
    • /
    • pp.39-48
    • /
    • 2023
  • Because a railway bridge is designed over a long period of time and covers a large site, it involves various environmental factors and uncertainties. For this reason, design changes often occur, even if the design was thoroughly reviewed in the initial design stage. In particular, design changes of large-scale facilities, such as railway bridges, consume significant time and cost, and it is extremely inefficient to repeat all the procedures each time. In this study, a technique that can improve the efficiency of learning after design change was developed by utilizing the learning result before design change through transfer learning among deep-learning algorithms. For analysis, scenarios were created, and a database was built using a previously developed railway bridge deep-learning-based prediction system. The proposed method results in similar accuracy when learning only 1000 data points in the new domain compared with the 8000 data points used for learning in the old domain before the design change. Moreover, it was confirmed that it has a faster convergence speed.

A Case Study on Minimizing Contract Amount Adjustments due to Design Changes in Defense and Military Facility Projects (국방·군사시설 사업의 설계변경 계약금액조정 최소화를 위한 사례연구)

  • Cho, Sung-joon;Lee, Kyoung-han;Lee, Myung-sik;Park, Bong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.34-44
    • /
    • 2024
  • In defense and military facility projects, adjustments to contract amounts due to design changes directly or indirectly affect factors such as increased construction costs and extended construction periods. Moreover, they can lead to differences of opinion and conflicts between the military and contracting parties. This case study analyzed the integrated management of defense and military facility projects by the Gyeonggi Southern Facilities Division, which oversees projects in Seoul and the southern Gyeonggi Province region for the Army, Navy, Marine Corps, and Air Force. Out of 388 completed projects, 103 cases with design changes were selected for analysis, aiming to ensure the reliability of data regarding the proportion of design changes in project completion. The study classified samples by the causes of design changes specified in the Ministry of Planning and Finance's contract regulations, assigning rankings based on the occurrence rates of each cause. Furthermore, it analyzed detailed factors for each cause of design change and derived implications to propose improvement measures. Considering the limited access to military primary data, this case study is expected to contribute to minimizing design changes in defense and military facility projects. Additionally, it is anticipated to be practically useful for subsequent research on contract amount adjustments resulting from design changes.

Design and Implementation of an HTML Pages Modification Detector for Meta-search Engines (메타 검색엔진을 위한 HTML 문서 변경 탐지기의 설계 및 구현)

  • Park, Sang-Wi;O, Jeong-Seok;Lee, Sang-Ho
    • The KIPS Transactions:PartD
    • /
    • v.9D no.3
    • /
    • pp.345-354
    • /
    • 2002
  • HTML pages in the web change at any time. It could cause to decrease the functionality of meta-search engines which provide users with integrated results of search engines. To solve this problem, we propose an HTML pages modification detector. It utilities information of element positions in HTML pages and the modified Jaak Vilo algorithm. The HTML page modification detector uses patterns that represent the structure of HTML expressions occurring repeatedly in HTML pages. An experiment is carried out to verify the correctness of the modification detector.

The Design and Implementation of XML Schema & Stylesheet Generation Tools based on XML Tree (XML Tree 기반의 XML 스키마 & 스타일시트 생성 도구의 설계 및 구현)

  • Park Young-Soo;Jang Duk-Chul
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.07b
    • /
    • pp.430-432
    • /
    • 2005
  • 최근 웹 사용자의 기대와 요구사항이 증가하고, 사회 전반의 트렌드가 자주 변하는 등 기존의 웹 서비스에 대한 프로그램 구조의 변경 요인이 자주 발생하고 있다. 본 연구에서는 이전에 개발된 XML Tree의 정보를 이용하여, 웹 기반에서 XML 개발 지원 서버의 도움을 받아 개발자가 웹 서비스를 하기 위한 XML Schema, XML Stylesheet, XML Document를 자동 생성할 수 있는 방법을 제시하고, 설계 및 구현을 하였다. 이렇게 함으로서, 웹 프로그램의 개발 시간 및 개발 비용을 줄일 수 있고 기업에서 각 부서 간에 시스템 통합이나 사용자의 트렌드 변화에 따른 웹 서비스의 구성 요소에 대한 변경 요인이 발생되었을 때, 이를 쉽고 빠르게 대처할 수 있을 것으로 기대한다.

  • PDF

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

Requirement Traceability Matrix Based on Closed Architecture Mechanism (클로즈 아키텍처 메커니즘 기반의 요구사항 추적성 매트릭스)

  • Byun, Eun Young;Son, Hyun Seung;Moon, So Young;Park, Ji Hoon;Kim, R. Young Chul
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2017.11a
    • /
    • pp.631-634
    • /
    • 2017
  • 앞으로의 프로젝트에서는 시장 변화, 신기술, 경쟁업체의 대응, 설계결함, 테스트 실패 등의 다양한 외부적 요인으로 인해, 더욱 빈번한 요구사항 변경이 요청된다. 그 이전에 명료한 요구사항을 정의하기가 매우 어렵고, 소프트웨어 구축 중에도 수시로 요구사항이 변경되고 있는 실정이다. 이런 문제는 요구사항 추적성 및 변경 관리의 미비함에 있다. 이를 해결하기 위해, 소프트웨어 개발 프로세스인 요구사항, 분석, 설계, 구현, 테스트 단계에서의 추적성 관리를 위한 프로세스의 구축과 내재화가 필요하다. 본 논문에서는 클로즈 아키텍처 메커니즘을 기반으로 소프트웨어 각 개발 단계 산출물들 간의 추적성 매트릭스를 제시한다. 이를 통해 프로젝트 과정에서의 잦은 요구사항 변경에 유연하게 대처함으로써 소프트웨어 품질 향상에 기여 할 것으로 본다.

Improvement of Lead Time at A PCB Manufacturing Line Using TOC Methodology (TOC를 이용한 PCB 제조라인의 리드타임 개선)

  • ;Park Jeong-Hyeon
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.1240-1245
    • /
    • 2006
  • PCB는 수십개의 주공정과 보조공정으로 구성된 제품으로 동일한 생산라인에서 로트 단위로 다품종 혼류 생산되고 있다. 따라서 PCB 제조라인에서는 많은 공정수, 높은 불량률, 다양한 공정설비 및 빈번한 설비고장, 중소기업의 낮은 설계 및 생산기술력, 빈번한 수주 변경 및 다품종 혼류, 긴급 수주 등과 같이 제조원가를 증가시키는 다양한 교란요인들이 항상 발생하고 있다. 본 연구에서는 생산성, 품질 등을 고려하면서 리드 타임을 단축하기 위하여 TOC DBR 기법을 개선한 2개의 DBR 개념을 도입하여 성공적으로 리드타임을 개선한 사례를 소개하고자 한다.

  • PDF

Dynamic Service Configuration Framework For Flexible Distributed Applications (유연성 있는 분산 어플리케이션 개발을 위한 동적 서비스 관리 프레임 워크)

  • 이용환;염귀덕;안형근;민덕기;장진호
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2002.10e
    • /
    • pp.691-693
    • /
    • 2002
  • 유연성 있고 확장성 있는 분산 어플리케이션을 작성하기 위해서는 다음과 같은 요건을 만족하는 서비스 개발 및 관리를 위한 프레임워크이 필요하다. 첫 번째 서비스들은 외부적인 어떤 정책이나 어플리케이션 구동 시 다양한 제한 등의 요인으로 인하여 선택적으로 서비스 사용이 가능해야 한다. 둘째로 서비스에 대해서 초기화, 구동, 임시정지, 정지 등과 같은 제어를 중앙 집중형태로 관리 콘솔에서 관리 할 수 있어야 한다. 세 번째로 서비스를 제어할 때 각 서비스들 사이의 의존관계를 반영할 수 있어야 한다. 네 번째로 이러한 분산어플리케이션의 서비스에 대한 환경 설정 부분에 대한 변경을 실시간으로 탐지를 해서 이러한 변경과 관계가 있는 서비스에게 통지를 할 수 있어야 한다. 다섯 번째로 한 어플리케이션 안에서 구동되고 있는 의존관계가 있는 각 서비스들 사이의 이벤트 기반의 통신을 메커니즘이 필요하다. 여섯번째로 환경 설정 변경에 대해서 분산 상황에서 다른 어플리케이션과 동기화를 맞출 수 있어야 한다. 본 논문은 이러한 유연하고 확장성 있는 어플리케이션을 개발하는데 필요한 자바 기반의 동적 서비스 관리 프레임워크에 대한 설계와 구현을 제시한다.

  • PDF