• Title/Summary/Keyword: 설계, 자재, 건설관리 시스템

Search Result 26, Processing Time 0.027 seconds

Web-based Distributed Lean Construction Information System;Development of System Prototype (웹 기반 분산형 린건설 정보시스템 개발;시스템 프로토타입 개발)

  • Park, Moon-Seo;Yoon, You-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.182-189
    • /
    • 2007
  • To reform and improve the productivity of construction industry, 1) it should be encouraged to improve the construction production process and 2) it is required to enhance reliability of construction information based on the systematic thinking process. To promote the information reliability created during construction production process, Lean Construction Research Center(LRC2) is developing a supporting system to improve design/material supply/schedule management, functioning to efficiently manage the information created at construction production processes and developing a web based construction information system that provides result management/decision making support/knowledge based information services.

  • PDF

Information management system development of construction material based on international data attribute (국제 데이터 속성 기반 건설자재 정보관리 시스템 구축)

  • Choong-Han Han
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.11a
    • /
    • pp.645-648
    • /
    • 2008
  • 최근 건설 분야의 정보화 기술이 발달함에 따라 건설생애(Life Cycle) 과정에서 파생되는 방대한 양의 정보를 수집·가공·축적·제공 하는 시스템이 급증하는 추세이다. 특히, 건설공사의 주요요소인 자재 정보를 제공하는 Web 기반 온라인 시스템만 현재 110여개 이상으로 토목·건축·설비·소방 분야에 이르기까지 매우 다양하다. 그러나 이러한 시스템에서 제공 중인 정보가 표준화 및 정형화 되지 않아 건설현장 실무자들의 정보 획득에 있어 많은 어려움을 겪고 있다. 이에 본 연구에서는 정형화되고 표준화된 건설자재정보를 제공하기 위해 건설자재 분류체계를 정의하고 건설자재 속성정보를 정형화하여 자재별 분류체계검색, 통합검색, 카테고리검색 뿐만 아니라 전자카탈로그로 변환 및 생성이 가능한 건설자재정보 관리 시스템을 설계 및 구현 하였다.

Development of System Model for Integrated Information Management of Construction Material (건설자재 통합정보 관리를 위한 시스템 모델 구현)

  • Han, Choong-Han;Ju, Ki-Bum
    • The KIPS Transactions:PartD
    • /
    • v.16D no.3
    • /
    • pp.433-440
    • /
    • 2009
  • As information technology of constructional area develops recently, web-based on-line system is rapidly increasing to provide information on diverse constructional materials so as to enhance productivity of constructional business and to reduce cost. Since the constructional materials information provided by these systems, i.e., quality, specification, etc are not standardized, however, the staffs on the constructional site suffer considerable difficulties in using materials information when acquiring information on specific materials, e.g., using diverse information systems or repeating similar jobs. Thus, this research typified information items of constructional materials on the basis of GDAS and designed multi system model to control integrated information on constructional materials. This system can efficiently control and utilize materials information by supporting automatic classification of constructional materials to which OmniClass Part-22 and UNSPSC are applied, conditional complex retrieval of materials information, real-time automatic embodiment of electronic catalog and retrieving/controlling RFID.

A Design of Computerizing System for Record Management of ULJIN Nuclear Power Plant (울진원자력발전소(原子力發展所) 자료관리업무(資料管理業務) 전산화(電算化) 연구(硏究)(I))

  • Park, Yong-Boo
    • Journal of the Korean Society for information Management
    • /
    • v.4 no.1
    • /
    • pp.154-169
    • /
    • 1987
  • The Computerizing Record Management System(RMS) has been developed for ULJIN Nuclear Power Plant in Korea on the basis of the Manual System. By means of review and analysis of processing flow & project requirements, system logics such as Receiving system, Logging system, Distribution system, Filing system, Indexing & Retrieval system and Output system of statistic and various reports, have been established for computerizing. Structure of Masterfile has been designed so as to include Bibliographic data, Transmittal data, Distribution data, Area data, RMS data for operation of Plant. The RMS data have been designed for construction and operation of the plant by adding index parameters for operation such as System code, KEPCO No., Component link code and Retention period on the point of receiving. The RMS has turned out an easy access to cross-reference between RMS and Material Control System.

  • PDF

A Design of Computerizing System for Record Management of ULJIN Nuclear Power Plant (울진원자력발전소(原子力發電所) 자료관리업무(資料管理業務) 전산화(電算化) 연구(硏究)(II))

  • Park, Yong-Boo
    • Journal of the Korean Society for information Management
    • /
    • v.4 no.2
    • /
    • pp.139-151
    • /
    • 1987
  • The Computerizing Record Management System(RMS) has been developed for ULJIN Nuclear Power Plant in Korean on the basis of the Manual System. By means of review and analysis of processing flow & project requirements, system, logies such as Receiving system, Logging system, Distribution system, Filing system, Indexing & Retrieval system and Output system of statistic and various reports, have been established for computerizing. Structure of Masterfile has been designed so as to include Bibliographic data, Transmittal data, Distribution data, Area, data, RMS data for operation of Plant. The RMS data have been designed for construction and operation of the plant by adding index parameters for operation such as System code, KEPCO No., Component link code and Retention period on the point of receiving. The RMS has turned out an easy access to cross-reference between RMS and Material Control System.

  • PDF

A Research on how to turn informationization Database of construction materials to practical use (건설 자재정보 DataBase의 실용화 방안 연구)

  • Kwon, Oh-Yong;Han, Chung-Han;Lee, Hwa-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.747-750
    • /
    • 2007
  • Information of construction material is served through internet to user but it is poor to use information of construction material because of lack of information which is accumulated and insufficience of standardization. So informationization of civil materials are closely connected with works and then it is promoted to be used through works like design, construction etc. Informationization for management of information of construction material which reflects questionnaires about opinion of workers presents promotion by stage considering first, continuous renewal of information of construction material and increase in quantity, second classification system and standardization of terms in order to share and connect information of construction material third, developing inquiry method of material information needed in construction stage fourth, connecting material information DB and application through design and construction.

  • PDF

An Introduction of Development for Next Generation Logistics Management System in Construction Project (건설산업의 물류관리 체계 개선을 위한 차세대 지능형 건설 물류관리 시스템 개발 현황)

  • Kwon, Soon-Wook;Chin, Sang-Yoon;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.99-105
    • /
    • 2008
  • For large-scale projects, supply chain management of construction materials is a key to a successful construction project. Inefficient management would cause significant loss in project cost, quality problems (and possible re-work), delayed delivery, claims, etc. On the other hand, efficient supply chain management system can reduce risks even the given project suffers from tricky details and frequent changes thanks to reduced material loss, shortened delivery time, and the quality outcome; this is a win-win situation for both clients and contractors. This paper presents a next-generation intelligent supply chain management system, which is intended to support large-scale construction projects such as urban high-rise buildings, as a strategic vision of the future construction logistics.

  • PDF

An RFID and BIM based Simulator for Construction Material Logistics and Progress Management (RFID와 BIM을 활용한 건설 자재 물류 및 진도관리 시뮬레이터 개발)

  • Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.46-54
    • /
    • 2011
  • There have been research and developments for effective and efficient logistics and progress management in a construction project. Among them, RFID+4D has been developed for the supply chain management of long-lead item materials such as steel component, precast concrete component and curtain wall by integrating RFID with 4D CAD. And the feasibility of RFID+4D has been verified and validated and the benefits in terms of time and cost were shown in several case studies. However, the previous development of RFID+4D has not been adapted widely because of additional modeling cost, non-real time data update, additional labor for data update, and so forth. Therefore, this research has proposed a framework and process for solving these problems. And the web based simulation system has been developed and verified based on the proposed framework. The proposed framework and process can improve the existing RFID+4D system in a construction project by saving its operation cost and utilizing project information more efficiently and effectively. Also it is expected that the proposed framework could be applied to a method transferring design RIM data to construction BIM data.

The Constitutional Directions of Construction Information Management System Between Design and Construction in the Building Project (설계/시공간의 효율적인 정보통합관리를 위한 건설정보처리시스템 구축 방안)

  • Oh Seung-Jun;Lee Kyung-Kook;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.464-467
    • /
    • 2002
  • In Korea construction project case, architectural construction project is curtailed production because information network process within multidisciplinary isn't smooth. Particularly, the construction is not insufficient about performance, cost and material, construction process, etc. in result various question arises because of design error in construction step. And various mistake is made because communication path within multidisciplinary isn't smooth in architectural design and design change process. This research proposed the optimization method of building system which is satisfied with performance of building, cost, constructability, and proposed the information management plan which is connected with that. And The construction information in this research is restricted to design/construction information which is considerate in design step.

  • PDF

BIM Based Time-series Cost Model for Building Projects: Focusing on Construction Material Prices (BIM 기반의 설계단계 원가예측 시계열모델 -자재가격을 중심으로-)

  • Hwang, Sung-Joo;Park, Moon-Seo;Lee, Hyun-Soo;Kim, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.111-120
    • /
    • 2011
  • High-rise buildings have recently increased over the residential, commercial and office facilities, thus an understanding of construction cost for high-rise building projects has been a fundamental issue due to enormous construction cost as well as unpredictable market conditions and fluctuations in the rate of inflation by long-term construction periods of high-rise projects. Especially, recent violent fluctuations of construction material prices add to problems in construction cost forecasting. This research, therefore, develops a time-series model with the Box-Jenkins methodologies and material prices time-series data in Korea in order to forecast future trends of unit prices of required materials. BIM (Building Information Modeling) approaches are also used to analyze injection time of construction resources and to conduct quantity takeoff so that total material price can be forecasted. Comparative analysis of Predictability of tentative ARIMA (Autoregressive Integrated Moving Average) models was conducted to determine optimal time-series model for forecasting future price trends. Proposed BIM based time series forecasting model can help to deal with sudden changes in economic conditions by estimating future material prices.