• Title/Summary/Keyword: 선후행관계

Search Result 13, Processing Time 0.023 seconds

Enhancing Work Trade Image Classification Performance Using a Work Dependency Graph (공정의 선후행관계를 이용한 공종 이미지 분류 성능 향상)

  • Jeong, Sangwon;Jeong, Kichang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.106-115
    • /
    • 2021
  • Classifying work trades using images can serve an important role in a multitude of advanced applications in construction management and automated progress monitoring. However, images obtained from work sites may not always be clean. Defective images can damage an image classifier's accuracy which gives rise to a needs for a method to enhance a work trade image classifier's performance. We propose a method that uses work dependency information to aid image classifiers. We show that using work dependency can enhance the classifier's performance, especially when a base classifier is not so great in doing its job.

"금궤요약심전(金櫃要略心典).장부경락선후병맥증제일(臟腑經絡先後病脈證第一)"에 대한 연구 -약론(略論) "금괘요약심전(金櫃要略心典).장부경락선후병맥증제일(臟腑經絡先後病脈證第一)"-

  • Lee, Seon-Ran;Lee, Yong-Beom
    • Journal of Korean Medical classics
    • /
    • v.18 no.2 s.29
    • /
    • pp.168-189
    • /
    • 2005
  • 통과분석(通過分析)${\ulcorner}$금궤요약심전(金櫃要略心典) 장부경락선후병맥증제일(臟腑經絡先後病脈證第一)${\lrcorner}$ 중우재경적주석(中尤在據的注釋), 득출여하결론(得出如下結論): 1. 우재경반대이용오행상생상극이론진행장련분석(尤在濫反對利用五行相生相池理論進行長蓮分析), 인위분석일차성상관관계즉가(認爲分析一次性相關關係卽可). 2. 제창오미적오장체용보사이론(提唱五味的五臟體用補瀉理論) 3. 이흡기정도구분삼초각부위적실송(以吸氣程度區分三焦各部位的實訟) : 미수시상초실(微數是上焦實), 촉시중초실(促是中焦實), 원시하초실(遠是下焦實) 4. 이척부출현부맥(以尺部出現浮脈), 판단위표지리(判斷爲表之裏), 장출현요통배강불능행적증상(將出現腰痛背强不能行的症狀), 여과입리(如果入裏), 장출현(將出現) ‘단기이극’적증상(‘短氣而極’的症狀). 5. 종(從)1-13조문중(條文中) '대사(大邪)'. '소사적주석급(小邪'的注釋及)1-17조문중‘소득’등적주석내용(條文中‘所得’等的注釋內容), 가이간출(可以看出), 우재여불근종(尤在濾不謹從)${\ulcorner}$금궤요약(金櫃要略)${\lrcorner}$, 차근거림상실제내진행주석(且根據臨床實際來進行注釋).

  • PDF

Causal Analysis between the Korean and the U.S. Monthly Business Conditions (한미 월간 경기동향의 선행성 분석)

  • Kim, Tae-Ho
    • The Korean Journal of Applied Statistics
    • /
    • v.22 no.1
    • /
    • pp.17-28
    • /
    • 2009
  • This study attempts to perform the statistical test for the causality between the Korean and the U.S. business conditions in association with the lead-lag relationship between the domestic stock price and the business condition. Their causal relationships are clearly identified after the outbreak of the IMF financial crisis. The vector autoregression for the corresponding period appears to reflect the strong interrelationships between the market variables and the dependency of the domestic business conditions on the U.S. market. The estimation results validate the leading effect of the stock price and the U.S. business behavior.

Traveling Salesman Problem with Precedence Relations based on Genetic Algorithm (선후행 관계제약을 갖는 TSP 문제의 유전알고리즘 해법)

  • Moon, Chi-Ung;Kim, Gyu-Ung;Kim, Jong-Su;Heo, Seon
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.48-51
    • /
    • 2000
  • The traveling salesman problem with precedence relations (TSPPR) is harder than general traveling salesman problem. In this paper we propose an efficient genetic algorithm (GA) to solve the TSPPR. The key concept of the proposed genetic algorithm is a topological sort (TS). The results of numerical experiments show that the proposed GA approach produces an optimal solution for the TSPPR.

  • PDF

Development of a 4D Information based Integrated Management System for Geothermal Power Plant Drilling Project (지열발전 시추프로젝트의 4D 정보화기반 통합관리 시스템 개발)

  • Lee, Seung Soo;Kim, Kwang Yeom;Shin, Hyu-Soung
    • Tunnel and Underground Space
    • /
    • v.24 no.3
    • /
    • pp.234-242
    • /
    • 2014
  • Deep drilling project should be managed systematically and efficiently because it is significantly influenced by various related factors having uncertainty and high risk in terms of economy and effective management. In particular, drilling project involves participants from various sectors including necessary service company and it also needs their collaboration by sharing related information occurring at drilling process in order to secure efficient performance management. We developed 4D (3D + time) information based visualization system for progress management by combining 3D design model and predicted optimized control parameters for each section in geothermal well design. We also applied PDM (precedence diagramming method) to the system in order to setup the effective process model and hooked it up to 3D information based on precedence relation and required time for informatized process network.

Causal Relation Between Stock Markets and Foreign Exchange Market : The International Evidence (환율과 주가의 관계 : 국제적 실증비교)

  • Chi, Ho-Joon;Kim, Young-Il
    • The Korean Journal of Financial Management
    • /
    • v.16 no.1
    • /
    • pp.261-281
    • /
    • 1999
  • 본 연구는 우리나라를 비롯한 미국, 영국, 독일, 일본시장을 대상으로 환율과 주가의 선후행 결합관계를 검정해 보고 선행변수가 원인변수가 될 수 있는가에 대한 인과관계를 검정해 보고자 시도되었다. 이를 위해서 1980년부터 1997년까지를 분석기간으로 교차상관관계검정과 인과 관계검정을 시도해 보았다. 우선 AIC에 따른 최적시차를 대상으로 교차상관관계에 대한 Ljung-Box Q 통계량 검정을 실시한 결과 한국, 영국, 독일의 경우에는 환율이 주가에 선행결합하는 것으로 나타났으나 미국, 일본은 유의적인 관계가 도출되지 않았다. 또한 안정적 시계열자료를 대상으로 Granger, Sims, Geweke-Meese-Dent 모형에 따라 인과관계를 검정해 본 결과에서는 한국, 영국, 독일의 경우에는 환율변동률이 주식수익률에 대한 일방적 원인변수로 나타났다. 이를 환율변동의 크기에 따라 루브르 협정 이전과 이후로 구분해서 검정해 본 결과 환율변동이 매우 심했던 협정 이전 기간에는 한국과 영국의 일부 모형에서만 환율변수가 유의적인 원인변수로 작용하였지만 환율변동이 작았던 협정 이후 기간에는 한국, 영국, 독일을 대상으로 모든 검정모형에서 유의적인 인과관계가 나타났다. 반면에 미국, 일본의 경우에는 분석기간 전체뿐만 아니라 루브르 협정 이전과 이후를 구분하더라도 유의적인 인과관계가 나타나지 않았다. 이는 미국, 일본의 대외무역의존도가 20%대 수준에 머물고 있어서 상대적으로 40%대 이상의 대외무역의존도를 기록하고 있는 한국, 영국, 독일과는 다른 결과가 도출된 것이라고 볼 수 있다. 따라서 대외무역의존도가 높은 한국, 영국, 독일에서는 환율이 주가에 비해 선행하여 변동한다고 볼 수 있다.

  • PDF

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

Implementation Planning for Information Technology-Based Future Mail Acceptance System (정보기술 기반의 미래형 우편접수창구 구축계획 수립)

  • Jeong, Keun-Chae
    • Information Systems Review
    • /
    • v.7 no.2
    • /
    • pp.141-162
    • /
    • 2005
  • In this paper, we set up an implementation plan for the Mail Acceptance System (MAS) to be operated more effectively and intelligently. First of all, an as-is analysis for the current MAS is performed for analyzing issues and problems and obtaining user requirements. After the as-is analysis, we perform benchmarking studies on the various postal service providers of the advanced countries. Based on the results from the as-is analysis and benchmarking study, we design a conceptual model for the future MAS. The proposed conceptual model can be classified into three parts: automatic MAS, business MAS, and integrated MAS. Information and automation technologies are applied to design the proposed model for eliminating inefficiencies and inaccuracies in MAS. We identify implementation tasks for realizing the proposed MAS model, evaluate the importance and precedence relationship of the identified tasks for deciding implementation priorities, and finally set up the implementation plan for the future MAS. We can expect that the more efficient and effective MAS can be constructed in the future by performing the proposed implementation plan.

Development of a Web-based Schedule Tool Using Flash (플래시를 이용한 웹기반 일정관리 도구 개발)

  • Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.51-57
    • /
    • 2010
  • Schedule management of construction work is important in order to complete construction projects within a given period of time. As activities increase and relations become more complex, schedule management software becomes increasingly necessary. To address this, attempts are being made to incorporate web-based ICT (information and communications technology) in construction project management. This research proposed a method to manage construction schedules via web pages using Flash. The interactive and graphic property of Flash enables a field manager to manage schedules easily and efficiently. A prototype was implemented using Flash and Action Script, and it was applied to a sample network in a web page.

Analysis of Exchange Rates of major countries and Domestic Interest Rate Fluctuations Affecting Exports (수출에 영향을 미치는 주요국의 환율과 국내 금리 변동에 관한 분석)

  • Choi, Soo-Ho;Choi, Jeong-Il
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.10
    • /
    • pp.231-238
    • /
    • 2017
  • In this study, we selected interest rates and won/dollar, won/yen, won/yuan to find out the indicators affecting domestic exports in the age of convergence. Correlation, regression analysis, indicator analysis and model analysis were performed for 210 months since January 2000. As a result, the correlation between exports and won/dollar, won/yuan, won/yen was negative(-). Therefore the directions were different from each other. In regression analysis, only interest rate and won/dollar were statistically significant for export. In the coefficient, interest rate calculated positive(+) and won/dollar was negative(-). It is interpreted that the won/dollar depreciation positively affects export growth. In this study if the won/dollar exchange rate falls, exports will increase. This is different from previous studies. Therefore, it is necessary to review the posterior relationship by time difference. Korea is highly dependent on exports. Therefore, the study on the indicators affecting exports to increase exports should continue.