Shear Resistance of CIP Anchors under Dynamic Loading: Reinforced Anchor (선설치앵커의 동적 전단하중에 대한 저항강도: 철근보강 앵커)

  • Park, Yong Myung;Kang, Moon Ki;Roh, Jin Kyung;Ju, Ho Jung;Kang, Choong Hyun
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.1
    • /
    • pp.21-30
    • /
    • 2014
  • In this study, an experimental study was performed to evaluate the shear resistance of cast-in-place(CIP) anchors reinforced with hairpin and stirrup bars under static and dynamic loads. The reinforcement was developed using D6 bars, and the anchors were installed with 20mm diameter and 120mm edge distance. Three tests were conducted for each type of reinforced anchor under static and dynamic shear load with a pulsating frequency of 1 Hz, respectively. It was found that the strength of hairpin-reinforced anchor was affected by the concrete cover and the dynamic tests showed no capacity reduction of anchors compared with static tests. The stirrup-reinforced anchor showed little increase of resistance compared with unreinforced anchor and the resistance under dynamic loading showed nearly same strength by static loading.

Shear Resistance of CIP Anchors under Dynamic Loading: Unreinforced Anchor (선설치앵커의 동적 전단하중에 대한 저항강도: 비보강 앵커)

  • Park, Yong Myung;Kang, Moon Ki;Kim, Dong Hyun;Lee, Jong Han;Kang, Choong Hyun
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.1
    • /
    • pp.11-20
    • /
    • 2014
  • The Concrete Capacity Design(CCD) method has been used in the design of anchor since 2001 and Korean design code specify that concrete breakout capacity of CIP anchor under seismic load shall be taken as 75% of static capacity. In this study, an experimental study was performed to evaluate the concrete breakout capacity of unreinforced CIP anchors under dynamic shear force. For the purpose, three static and dynamic shear-loading tests were conducted using 20mm diameter anchors, respectively. The edge distance of 120mm was considered in the tests. In the dynamic tests, 15 cycles pulsating load with 1Hz speed was applied and the magnitude of loading step was increased until concrete breakout failure occurs. From the tests, the concrete breakout capacity under dynamic shear loading showed nearly same capacity by static loading.

Pull-out Capacity of Cast-in-place Anchor for Construction of Precast Concrete Segment Arch (프리캐스트 콘크리트 패널 분절 아치 시공을 위한 선설치 앵커의 인발 강도 평가)

  • Ahn, Jin-Hee;Yim, Hong Jae;Bang, Jin Soo;Jeon, Seok Hyeon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.2
    • /
    • pp.94-102
    • /
    • 2020
  • Precast concrete segment arch system has an economic and construct ability that combined with advantage of precast concrete and arch behavior. A precast concrete segment arch system with outrigger is consisted of segmented precast panels, a steel outrigger rib, and V-strip to connect precast panels with a steel outrigger rib and cast-in-place anchors in precast panels to connect V-strip should have sufficient pull-out capacity to form its arch shape by site lifting for assembled precast panels and outriggers. However, it is difficult to secure its embedment depth due to the relatively shallow thickness of precast panel. It can be also occurred that flexure deformation of precast panels caused by its pull-out behaviors. In this study, pull-out capacity of cast-in-place anchor was examined for construction of precast concrete segment arch system with outriggers. Therefore, a total of 24 precast panel specimens were fabricated to examine pull-out capacities of cast-in-place anchor in precast panels, and installation depth of anchors, diameter of anchors and wire mesh effects for the precast panel were examined. From this pull-out tests, its pull-out capacities and failure modes were evaluated and the type of the cast-in-place anchor applicable to the precast concrete segment panel arch system with outriggers was determined from comparison of the design specification values.

Shear Strength of Hairpin Reinforced Cast-In-Place Anchors by Static and Seismic Qualification Tests (헤어핀 보강 선설치앵커의 정적 및 지진모의실험에 의한 전단 저항강도 평가)

  • Kim, Dong Hyun;Park, Yong Myung;Kim, Tae Hyung;Jo, Sung Hoon;Kang, Choong Hyun
    • Journal of Korean Society of Steel Construction
    • /
    • v.27 no.3
    • /
    • pp.333-345
    • /
    • 2015
  • This study evaluated the static and dynamic shear strength of cast-in-place anchors reinforced with hairpin bars in uncracked and cracked concrete. The anchors 30mm in diameter reinforced with D10 hairpin bar were designed with an edge distance of 150mm and an embedment depth of 240mm. The cracked specimens consisted of the orthogonal and parallel cracks to the direction of shear loads, respectively. The dynamic strength was evaluated using seismic qualification tests based on the ACI 355.2 standard. The shear strength of the hairpin reinforced anchor was hardly correlated to the concrete cracks and the dynamic strength was similar to its static shear strength. Finally, a consideration on the design strength of hairpin reinforced anchors was presented.

Static Shear Resistance of Cast-In-Place Anchors in Cracked Concrete (균열콘크리트에 매입된 선설치앵커의 정적 전단하중에 대한 저항강도)

  • Park, Yong Myung;Ju, Ho Jung;Kim, Dong Hyun;Kang, Moon Ki;Lee, Jong Han
    • Journal of Korean Society of Steel Construction
    • /
    • v.27 no.1
    • /
    • pp.87-97
    • /
    • 2015
  • In this study, an experimental study was performed to evaluate the concrete breakout strength of cast-in-place(CIP) anchors in cracked concrete under static shear loading. The CIP anchors involved in this study were 30mm in diameter with an edge distance of 150mm and an embedment length of 240mm. The experiment was carried out for two specimens in uncracked concrete and three specimens in cracked concrete orthogonal and parallel to the direction of shear loading, respectively. Compared to the uncracked concrete specimen, cracked specimen orthogonal to the direction of shear loading showed no reduction in the concrete breakout strength and that parallel to the load direction about 91% strength which corresponds to 84% of uncracked concrete strength defined in ACI 318-11. Therefore, the experimental results showed smaller decrease in the shear resistance of CIP anchors in cracked concrete than that specified in ACI code which account for 71% strength of uncracked concrete in cracked concrete.

A Study on the Concrete Breakout Capacity Evaluation of Medium-to-Large size CIP Anchor Bolts under Tension Loading (인장하중을 받는 중대형급 선설치 앵커볼트의 콘크리트파괴강도 평가를 위한 연구)

  • Park, Yong-Myung;Jeon, Myeong-Hui;Lee, Kun-Jun;Kim, Cheol-Hwan
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.4
    • /
    • pp.493-501
    • /
    • 2011
  • The $45^{\circ}$cone failure theory has been used for concrete anchor bolt design, but the CCD (concrete capacity design) method was adopted as a new design method in 2000. The method was allowed to be used, however, only for anchors with a diameter of less than 50 mm and an embedment depth of less than 635 mm because it is based on the experiment results from medium-sized to small anchor bolts. Therefore, it is necessary to develop a rational concrete breakout capacity equation for medium-sized to large anchor bolts. In this study, tension tests on an M56 cast-in-place single anchor bolt with an effective embedment depth of 400-450 mm were carried out for the five test specimens. Based on the test results together with the other recent test results, the applicability of the concrete breakout capacity equation in the current design code to the large to medium-sized anchor bolts with an embedment depth of 280-1,200 mm was estimated.

Performance Evaluation of the Cast-in-place Anchor Bolt in Non-cracked Concrete used in Power Plant Facilities (비균열 콘크리트에 매립된 발전설비 정착부 선 설치 앵커의 구조성능 평가)

  • Kim, Dong-Ik;Jong, Woo-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.250-258
    • /
    • 2019
  • The seismic performance and stability of operating facilities installed in domestic power plants need to be verified because of the increased incidence of earthquakes resulting in power plant damage due to the overturning failure of electric operating facilities. In this study, a structural performance evaluation of the anchor bolts constructed to setup the operating facilities on concrete slabs was carried out through an on-site inspection of power plants, called Daechung-Dam. M10 J hook and M12 J hook anchor bolts were installed in the field unit. According to the ASTM E 488-96 specifications, anchor bolt pullout and shear tests were carried out and compared with the anchor-bolt design standards. The results from the tension and shear pullout tests showed that the M10 and M12 J hook anchor bolts had higher performance than the required design load. Thus, they were found to be safe enough. Nevertheless, more research in the field of analytical study will be needed in the near future.

A Study on the Concrete Breakout Capacity of CIP Anchor Bolts under Shear Loading (전단력을 받는 선설치 앵커볼트의 콘크리트 파열파괴강도 평가 연구)

  • Park, Yong-Myung;Jeon, Myeong-Hui;Choi, Myung-Kuk;Kim, Cheol-Hwan;Kim, In-Gi
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.2
    • /
    • pp.207-215
    • /
    • 2012
  • The 45-degree cone failure theory has been used in concrete anchor bolts design under shear loading, but the CCD (Concrete Capacity Design) method was adopted as a new design method since 2000. However, the method was allowed only for anchor diameters of less than 50mm because it is based on the experimental results of small size anchor bolts. Therefore, it is necessary to develop a rational concrete breakout capacity equation for medium-to-large size anchor bolts with large edge distance. In this study, shear tests on M56 cast-in-place single anchor bolt with edge distance of 350mm were performed using four test specimens. Based on the test results and findings of existing studies, a new equation for the breakout capacity of anchor bolts under shear loading with edge distance of up to 750mm was proposed.

Dynamic Shear Strength of Stirrup-reinforced Cast-in Anchors by Seismic Qualification Tests (스터럽 보강 선설치 앵커의 지진모의실험에 의한 동적 전단 저항강도 평가)

  • Kim, Tae Hyung;Park, Yong Myung;Kang, Choong Hyun;Lee, Jong Han
    • Journal of Korean Society of Steel Construction
    • /
    • v.30 no.2
    • /
    • pp.67-76
    • /
    • 2018
  • An experimental study was conducted to evaluate the breakout strength of stirrup-reinforced cast-in anchors under dynamic shear loadings. The shear loadings were applied in the manner specified in the ACI 355.2 and ETAG 001 for the seismic qualification tests. Test specimens were fabricated with M36 anchor (edge distance, 180mm) reinforced with D10 stirrups (spacing, 100mm). The specimens reached almost the breakout strength and thereafter fracture of anchor occurred. Additional tests with M42 anchor (edge distance, 160mm) reinforced with D6 bars (spacing, 100mm) were also conducted. The experimental results showed that the dynamic shear strength was not less than the static resistance. Based on the test results, it was shown that ACI 318 and ETAG 001 specifications estimate the breakout strength of stirrup-reinforced anchors conservatively as more reinforcement is provided.

Shear Resistance of Unreinforced Cast-In-Place Anchors in Uncracked and Cracked Concrete by Seismic Qualification Tests (지진모의실험에 의한 비균열 및 균열콘크리트에 매입된 비보강 선설치앵커의 전단 저항강도 평가)

  • Park, Yong Myung;Kim, Tae Hyung;Kim, Dong Hyun;Jo, Sung Hoon;Lee, Jong Han
    • Journal of Korean Society of Steel Construction
    • /
    • v.27 no.3
    • /
    • pp.347-357
    • /
    • 2015
  • In this study, an experimental study was performed to evaluate the concrete breakout strength of unreinforced cast-in-place anchors by seismic qualification test under shear loading. The CIP anchors tested herein were 30mm in diameter with an edge distance of 150mm and an embedment depth of 240mm in uncracked and cracked concrete. The cracked specimen consisted of orthogonal and parallel crack to the loading direction, respectively. The dynamic loading sequence during the seismic qualification test was determined based on CSA N287.2, ACI 355.2 and ETAG 001 codes. After the dynamic loading, the static loading was applied until failure occurs. The shear resistance by seismic qualification tests showed almost the same strength as that obtained from the static tests in uncrcaked and cracked concrete, respectively. Meanwhile, the breakout depth did not reach $8d_0$, therefore the modified strength equation of ACI 318-11 could estimate properly the concrete breakout strength, which does not consider effective bearing length.