• Title/Summary/Keyword: 생산성 분석

Search Result 7,326, Processing Time 0.039 seconds

Comparison of Stochastic Frontier Models in Application to Analysis on R&D and Production Efficiency (R&D와 생산효율성 관계에 관한 계량모형 비교연구: 확률적 생산변경모형을 중심으로)

  • Lee, Young Hoon
    • Economic Analysis
    • /
    • v.17 no.1
    • /
    • pp.103-130
    • /
    • 2011
  • This paper intends to provide applied economists which study the effects of research and development with valuable information on econometric model selection. It includes extensive discussion on econometric models which have been applied for the study on the relationship between research and development and productivity. In particular, it compares various stochastic production frontier models which have been developed recently. The discussion decomposes them into models with scaling property and the ones with nonscaling property as well as models with monotonic and nonmonotonic relationships between research and development and productivity. Finally, this paper applies the models to two different panel data sets (firm level data and country level data) and compare estimation results from competing econometric models.

Suggestion improvement measures based on form work productivity analysis in apartment housing construction (공동주택 거푸집공사 작업량 분석에 따른 개선 방안에 대한 연구)

  • Yoon, Ja-Young;Kim, Young-Suk;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.49-56
    • /
    • 2010
  • A competitive construction project must address factors such as cost, performance, aesthetics, schedule and quality. The importance of these factors will vary from project to project and from market to market. Productivity is becoming an ever-more important factor in the acquisition of a project. As the technology or aesthetics of a product matures or stabilizes, and the competitive playing field levels, competition is increasingly based on time. Recently, the construction industry has been depressed due to difficult market circumstances. At this time in particular, construction companies are striving to rationalize their management, both in their planning offices and in the field. In this study, we present a method of calculating a reasonable duration for reinforced form work. We did this by first developing a question for field workers, then sampling form workers based the question. Second, we employed a work analysis method to analyze worker"s work-methods and Time. Then, using the result of this analysis, we measured the Productivity of form work. This measure can be used as basic data to determine the appropriate duration of form work.

The Analyses of IT Related Journal on the View of Network Characteristics (네트워크 특성의 관점에서 IT 관련 저널 분석)

  • Kim, Kihwan;Kim, Injai
    • Information Systems Review
    • /
    • v.17 no.2
    • /
    • pp.179-192
    • /
    • 2015
  • Collaborative research has been actively done on the basis of academic relationships among various study area. The importance of collaboration has also been increased. Collaborative researchers can reduce time, cost, and research risk to maximize research productivity. This study aims to develop a framework for understanding the behavior of professional groups through network characteristics. To achieve the goal, we collected data of the co-authored network and that of the reviewer network from from 2006 to 2012. Total 230 submitted papers were analyzed on the views of research performance and productivity. Various analytical methods such as centrality analysis, sub-group analysis, correlation, and regression were conducted for assuring the reliability and validity of our research. The results shows that the productivity of the co-authored network was increased and the efficiency of the reviewer network was also identified through several network indexes.

Productivity Effect by Activities in Education & Training and Research & Development after Financial Crisis: An Analysis using the Estimate of E&T Stock (외환위기 이후 기업의 교육훈련활동과 연구개발활동의 생산성 효과: 교육훈련스톡 추계치를 이용한 분석)

  • Ban, Ga Woon
    • Journal of Labour Economics
    • /
    • v.34 no.1
    • /
    • pp.33-69
    • /
    • 2011
  • This study analyses a productivity effect by E&T and R&D activities via estimation of E&T stock, R&D stock, and patent stock in a corporate level. Particularly, the analysis reflects the effects of skilled training after estimating E&T stock from E&T flow. When a spillover effect of E&T is analyzed, a methodology using technical proximity concept becomes a new experiment. Also classifying long and short term effects from the usage of Dynamic Panel Data Analysis becomes a new trial, too. The results of study appear that the productivity effects from E&T investments are relatively lager than R&D investments. Through spillover effects and long-term effects E&T and R&D activities have a strong influence on the corporate's productivity.

  • PDF

Efficiency and Productivity on ICT Industry (ICT 제조업과 서비스업의 효율성과 생산성)

  • Jeong, Boon-Do
    • International Commerce and Information Review
    • /
    • v.16 no.4
    • /
    • pp.55-75
    • /
    • 2014
  • Non-parametric method such as technology efficiency, DEA/Window model and Malmquist Productivity Index (MPI) are used to measure efficiency and productivity of ICT (Information and Communication Technology) manufacturing industry and service industry over the period 2007-2011. The results of this paper indicate following: (1) Technology efficiency of the ICT manufacturing industry were found as the range of 0.34 and 0.39 over the sample period. Technology efficiency of the ICT service industry were found as the range of 0.16 and 0.20 over the sample period. (2) The geometric average of the Malmquist TFP indexes on ICT manufacturing industry indicated the productivity improvement an average of 8.3 percent. The geometric average of the Malmquist TFP indexes on ICT service industry indicated the productivity improvement an average of 1.6 percent. (3) TIER analysis result on ICT manufacturing industry showed that optimal bench marking made by storage devices${\rightarrow}$wireless communication equipment${\rightarrow}$broadcasting equipment${\rightarrow}$radio, recording and playback devices${\rightarrow}$computers, printers, video and audio-visual equipment path. TIER analysis result on ICT service industry indicated that optimal bench marking made by computers and packaged software${\rightarrow}$wired communication${\rightarrow}$communication, information, detection equipment${\rightarrow}$consulting and construction for computer systems integration${\rightarrow}$industrial machinery and equipment rental${\rightarrow}$telecommunications reseller${\rightarrow}$system software development and delivery${\rightarrow}$hosting path.

  • PDF

Productivity Improvement through the Waste Elimination of Construction Process (건설공정의 낭비제거를 통한 생산성 향상 방안)

  • Mun Jeong-Mun;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.93-103
    • /
    • 2002
  • The reinforcement concrete work is the work affected by structural safety, durability, and schedule with form work. The domestic reinforcement concrete works have mainly worked the process of re-barfabrication/assembly on site. Finally it have low productivity. Then this paper analyzed waste factors and the process of re-bar fabrication/assembly on site for the productivity improvement and value-added productivity improvement. Waste factor analysis aims at maximizing value-added by the value analysis of re-bar fabrication and assembly on site. Finally, Value-AddingActivity(VAA)ismuchlessthan non-value adding activity. Especially, Non-Value-Adding Activity(NVAA) generates waste such as the activity steps, labors, equipments, materials, time, and soon. And it was non-flow production, over production, and analyzed into having to shift value. This paper aimsat maximizing value-addingactivity and minimizingnon value-addingactivity through waste factor analysis in process for the improvement of value added productivity.

A Study on the Measuring Model of Productivity Using DEA in Container Terminal (DEA 기법을 활용한 컨테이너터미널 생산성 측정에 관한 연구)

  • Lee Sun Yong;Choi Hyung Rim;Park Nam Kyu;Kwon Hae Kyoung;Lim Sung Taek
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2004.11a
    • /
    • pp.331-336
    • /
    • 2004
  • In order to strengthen the competitiveness of port against calling for the huge vessel and reducing the shipping service time, the productivity of container terminal must be improved. This productivity variously results according to the kinds of productivity evaluation model, input elements like yard, equipment, employee, facility, etc,. But, it is discussed that the productivity is measured by partial productivity evaluation model or general input elements. Therefore, we measured for the productivity of the container terminal using the Developed the data Envelopment Analysis (DEA), which is developed in order to evaluate the relative efficiency of decision making units - it's difficult to clear cause and effect between input and output. We measured the whole productivity of container terminal in Busan according to decision of the correct input elements. And we investigated the change of the productivity measurement result according to input elements, presents more accurate productivity evaluation model in container terminal.

  • PDF

Extended Benefit-Cost Analysis of Irrigation and Drainage Project (관개배수사업의 확장편익비용분석)

  • Lim Jae Hwan;Koo Seung me
    • KCID journal
    • /
    • v.8 no.1
    • /
    • pp.115-124
    • /
    • 2001
  • 농업부문이 사회에 제공하는 다양한 긍정적 외부효과가 인정됨에 따라, 대부분의 농업생산기반시설은 국부를 증진시키는 사회간접자본으로 인식되고 있다. 과거에는 수리시설을 비롯한 기반시설이 단지 생산성 향상을 위한 사회적 투자로 간주되었으며 따라서 사업에 대한 경제성 분석 또한 직접적인 경제적 효과에 대한 편익비용분석에 국한되었다. 그러나 최근에는 농업 및 생산기반시설이 제공하는 비시장적 가치가 점차 인정됨에 따라 그러한 가치 또한 경제성분석에 포함될 수 있다

  • PDF

Verification of the Use of Architectural PC for Improving the productivity in an Apartment Housing Project (공동주택 공사에서의 건축 외관용 PC 활용에 따른 생산성 향상 분석)

  • Lee, Hyun-Seok;Lee, Sang-Hyo;An, Byung-Ju;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.670-673
    • /
    • 2007
  • In Korea, it has recently occurred that problems of productivity and construction duration in the construction industry. If five days per week system come into effect, they'll become more urgent. The productivity of construction industry and competitive construction duration in Korea are too low. If post sale system becomes effective, construction companies will strive to improve productivity. Therefore, the objective of this study is to draw up Architectural PC as the alternative for productivity improving and analyze possibility of productivity improving by comparing with established method of construction.

  • PDF

The Development of Productivity Prediction Model for Interior Finishes of Apartment using Deep Learning Techniques (Deep Learning 기반 공동주택 마감공사 단위작업별 생산성 예측모델 개발 - 내장공사를 중심으로 -)

  • Lee, Giryun;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.3-12
    • /
    • 2019
  • Despite the importance and function of productivity information, in the Korean construction industry, the method of collecting and analyzing productivity data has not been organized. Also, in most cases, productivity management is reliant on the experience and intuitions of field managers, and productivity data are rarely being utilized in planning and management. Accordingly, this study intends to develop a prediction model for interior finishes of apartment using deep learning techniques, so as to provide a foundation for analyzing the productivity impacting factors and predicting productivity. The result of the study, productivity prediction model for interior finishes of apartment using deep learning techniques, can be a basic module of apartment project management system by applying deep learning to reliable productivity data and developing as data is accumulated in the future. It can also be used in project engineering processes such as estimating work, calculating work days for process planning, and calculating input labor based on productivity data from similar projects in the past. Further, when productivity diverging from predicted productivity is discovered during construction, it is expected that it will be possible to analyze the cause(s) thereof and implement prompt response and preventive measures.