Abstract
The reinforcement concrete work is the work affected by structural safety, durability, and schedule with form work. The domestic reinforcement concrete works have mainly worked the process of re-barfabrication/assembly on site. Finally it have low productivity. Then this paper analyzed waste factors and the process of re-bar fabrication/assembly on site for the productivity improvement and value-added productivity improvement. Waste factor analysis aims at maximizing value-added by the value analysis of re-bar fabrication and assembly on site. Finally, Value-AddingActivity(VAA)ismuchlessthan non-value adding activity. Especially, Non-Value-Adding Activity(NVAA) generates waste such as the activity steps, labors, equipments, materials, time, and soon. And it was non-flow production, over production, and analyzed into having to shift value. This paper aimsat maximizing value-addingactivity and minimizingnon value-addingactivity through waste factor analysis in process for the improvement of value added productivity.
철근공사는 거푸집공사와 더불어 건축물의 구조적 안정성과 내구성 및 공기에 가장 큰 영향을 미치고 있는 공사이다. 그러나 국내 철근 콘크리트 공사는 철근현장가공조립을 주로 하고있어 낮은 생산성을 갖고 있는 실정이다. 따라서 본 논문은 생산성 향상을 위해 철근현장가공조립 프로세스를 부가가치 생산성향상을 위한 낭비요소를 분석하였다. 낭비요소 분석은 비가치창출 작업으로 인해 발생하는 요소로 철근현장가공조립의 가치분석을 통해 부가가치를 극대화 하고자 하였다. 그 결과 가치창출작업들이 비가치창출 작업보다 월등히 적다는 것으로 분석되었다. 특히, 본 논문에서 낭비는 불필요한 작업 단계와 인력, 장비, 자재, 시간 등에서 낭비되고 있었다. 또한 흐름생산이 되지 않고, 과잉생산을 하고 있는 것으로 조사되었으며, 가치의 변화가 필요한 것으로 분석되었다. 본 논문에서는 부가가치 생산성 향상을 위해 프로세스 상에 내재되어 있는 낭비요소를 분석하여 부가가치를 창출하는 가치창출 작업을 최대화하고, 비 가치창출작업을 최소화하는데 목적이 있다.