The purpose of this study is to look through the progress of Yeosu Exposition ex-post facto service, to survey the cognition degree of the general public for it, and to estimate the nonmarket value. For such a reason, this paper examines the planning direction and enforcement situation of ex-post facto service first and then conducts a cognition degree survey of the 900 general public in the nation. Also, this paper carries out the nonmarket value of Yeosu EXPO ex-post facto service using CVM. Estimation results is that the annual value of it is 50.8 billion won and the total value for 5 years is 217.1 billion won. These results mean that there is nonmarket high value besides general market value for Yeosu EXPO ex-post facto service, and government should consider this to determine the future of it.
Proceedings of the Korean Society of Computer Information Conference
/
2015.07a
/
pp.305-308
/
2015
건설공사 사후평가는 공공건설사업 수행성과를 평가하고 차후 유사사업 추진 시 이를 활용하여 공공건설사업 효율화에 기여하기 위한 제도이다. 국토교통부에서는 발주청별로 실시하고 있는 건설공사 사후평가의 결과정보를 체계적으로 통합 관리하고, 이를 활용할 수 있도록 건설공사 사후평가 시행지침을 기초로 한 건설공사 사후평가시스템을 구축하여 운영 중에 있다. 하지만 사후평가 시행지침의 개정에 따라 입력양식 및 관리항목이 변경되고, 축적된 사후평가 결과정보의 분석기능 등의 부족으로 유사 건설사업 수행시 활용 체계가 미흡한 실정이다. 본 연구에서는 건설공사 사후평가 시행지침의 개정과 분석 및 통계기능 강화를 위해 따라 건설공사 사후평가시스템의 개선방안을 제시하고자 한다. 이를 통해 사후평가시스템의 활용도를 제고하고 유사 공공건설사업 수행시 시행의 효율성을 도모할 수 있으리라 예상된다.
Korean Journal of Construction Engineering and Management
/
v.14
no.6
/
pp.78-89
/
2013
Post-evaluation system reflects the results of performing a public construction project in the future similar public construction projects to be utilized in the planning. However, the current system simply compares the expected values, such as demand, B/C ratio, cost of construction, construction period, with the actual values after the completion of construction. In addition, most public owner does not actively conduct the post-construction evaluation tasks, so that the evaluation results has not been returned to early stage of a construction project. In this study, status of the post-construction evaluation system is investigated by a survey of the public owner and the construction project evaluation system of the United States and Japan was analyzed. This paper presents the improvement scheme of utilization of the results of the post-construction evaluation system. Through improving the post-construction evaluation system, it is expected that public agencies would easily utilize the post-construction evaluation.
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.6
/
pp.1145-1152
/
2016
A construction post evaluation is introduced to provide information that can be used for similar construction projects in the future through the evaluation of the efficiency of a public construction project and the verification of the appropriateness of the project results. However, it is not widely used due to a lack of awareness of the method. For this reason, the aim of this study is to provide a basic frame that can be utilized as a reference for a similar project in the future based on the construction post evaluation. More specifically, a more effective analysis method for the construction post evaluation is proposed and then an exemplary analysis is performed based on the method. The paper analyzes 293 cases stored in construction CALS. Construction cost growth rates of railway projects are tend to be greater than other project types like highway, expressway, and harbour. Then, construction schedule grwoth rates of expressway are greater than others. This is expected to provide useful information for a future project, and serve as a basic frame. Moreover, it is also meaningful that a project can be analyzed from different perspectives through the construction post evaluation.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.12
/
pp.7364-7371
/
2014
Construction post-evaluation (CPE) boosts the efficiency of public construction projects by assessing the performance results of public construction projects and using the results to pursue similar projects. This evaluation comprehensively analyzes and assesses the planning of construction work, the estimated and actual construction costs, the construction period, the demand for construction projects, and the effects of construction projects after the construction work to ensure efficiency. The data was used to prevent lax project execution and enhance the quality and efficiency of similar construction projects. On the other hand, CPE results information must be managed systematically to refer to and use CPE data in similar construction projects. Therefore, in this study, the CPE system was developed as a measure of the systematic and comprehensive management and use of the CPE results information of individual ordering agencies. Therefore, the groundwork was laid for the assurance of quality enhancement and efficient project execution in public construction projects. This system is expected to serve as a useful tool for comprehensively analyzing and assessing construction works.
Journal of Korean Society of Archives and Records Management
/
v.18
no.4
/
pp.205-229
/
2018
The purpose of this study is to present a plan to collect records for the post-management of the Pyeongchang Winter Olympics, which was held in February 2018. To achieve the research objectives, the value and types of records of the 2018 Winter Olympics follow-up records were identified, and the cases of mega sports event follow-up were selected and analyzed. Based on this, the following three measures were presented to collect records related to the Pyeongchang Winter Olympics. First, records were collected based on collection methods over time. Second, records were collected based on the object and subject of recording. Third, records were collected based on subjects related to the Pyeongchang Winter Olympics. The study's result can be used to establish a Pyeongchang Winter Olympics memorial hall and to prepare a collection plan for follow-up management after holding a domestic mega sports event.
Proceedings of the Korean Statistical Society Conference
/
2005.11a
/
pp.133-139
/
2005
베이즈 법칙에서는 사전확률과 우도가 주어지고 어떤 실험결과가 일어났을 때 사후확률을 계산한다. 이러한 사후확률의 계산 문제를 미니탭 매크로를 이용하여 쉽게 계산할 수 있다. 또한 일련의 독립적이고 연속적인 실험결과에 따르는 사후확률도 편리하게 계산할 수 있다. 최근에는 미니탭 한글 Release 14가 출시되어 한글로 결과를 나타낼 수 있도록 매크로를 작성할 수 있다.
Journal of the Korean Data and Information Science Society
/
v.22
no.6
/
pp.1183-1197
/
2011
The prior distribution is the probability distribution we have before observing data. Using Bayes' rule, we can compute the posterior distribution, the new probability distribution, after observing data. Computing the posterior distribution is much easier than before by using Excel VBA macro. In addition, we can conveniently compute the successive updating posterior distributions after observing the independent and sequential outcomes. In this paper we compose some Excel VBA macros for applying Bayes' rule and give some examples.
Annual Conference on Human and Language Technology
/
2022.10a
/
pp.588-591
/
2022
최근 자연어 이해 및 생성에 있어서 사전학습 기반의 언어 모델이 널리 사용되고 있다. BERT, roBERTa 등의 모델이 있으며, 마스크 언어 모델링을 주요 과제로 하여 사전 학습을 한다. 하지만 MLM은 문법적인 정보를 활용하지 못하는 단점이 있다. 단 순히 무작위로 마스크를 씌우고 맞추기 때문이다. 따라서 본 연구에서는 입력 문장의 문법적 정보를 활용하는 방법을 소개하고, 이를 기반으로 사후 학습을 하여 그 효과를 확인해 본다. 공개된 사전학습 모델과 사후학습 모델을 한국어를 위한 벤치마크 데이터셋 KLUE에 대하여 조정학습하고 그 결과를 살펴본다.
본 연구는 벤처캐피탈의 투자심사단계 및 투자 이후 사후관리단계에서의 리스크 관리·활용과 투자성과 사이의 관계를 살펴보았다. 즉, 투자심사단계에서는 투자대상기업을 발굴한 벤처캐피탈의 리스크 분석 및 대응방안의 활용수준과 투자성과와의 관계를 규명하였고, 사후관리단계에서는 리스크 관리를 위한 모니터링 활동과 투자성과와의 관계를 규명하였다. 본 연구에서는, 첫째, 투자심사 단계에서의 경영리스크 및 재무·법률 리스크 분석 및 활용 수준이 정량적인 투자성과, 특히, 특허 등록수에 긍정적인 영향을 미치는 것으로 나타났다. 둘째, 벤처캐피탈의 주요 역할인 투자 이후의 모니터링에 대하여는, 주관적 투자 만족도에 긍정적인 영향을 미치는 것으로 나타났다. 본 연구를 통하여 투자대상기업을 발굴하여 리스크 관리 중심으로 투자를 심사·집행하고, 투자 이후 리스크 관리 중심으로 투자기업의 가치를 증대하기 위하여는 벤처캐피탈리스트의 역할이 특히 중요하다는 것을 알 수 있었다. 투자기업이 보유한 자원·역량에 한계가 있다는 점을 고려할 때, 벤처캐피탈의 역량이 투자기업에 지원되는 것은 해당 기업이 지속적으로 성장하기 위한 바탕이 될 것이다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.