Schematic Estimate Framework of Finishing Works based on IFC-BIM Knowledge (IFC-BIM 연계 지식정보기반 마감공사 개산견적 프레임워크)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4176-4184
    • /
    • 2015
  • Cost Estimate for alternative in design phase of construction become criterion for profitability and feasibility analysis of projects. Initial design phase performed schematic estimate based on similar data in the past. The quantity take-off according to estimators experience and calculation method are occurred different or missing. IT (Information Technology) technology evolution has been promoting BIM technology in construction. It is changing the paradigm of planning, design, construction and maintenance phase throughout the construction project. A number of studies have been attempted to apply BIM technology in the construction. In this paper, we propose schematic estimation framework linking standard format IFC (Industry Foundation Classes) and estimate related knowledge. As a result, it performs a cost prediction for decision-making in the design phase, and expected to overcome the limitations of previous studies. In addition, it is possible actively coping with changes.

The hierarchical structures of cause-and-effect relationships on the profit factors in overseas construction projects (해외건설공사 수익성 영향인자의 계층구조 및 사레적용에 관한 연구)

  • Han, Seung-Heon;Sun, Seung-Min;Park, Sang-Hyuk;Jung, Do-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.64-76
    • /
    • 2006
  • Korea's overseas construction industry has been rather depressed by the weakened profitability as well as the sharp decrease of the market shares due to the lack of international competitiveness and the declined international market. There exist a lot of various risks in performing the overseas construction, and especially EPC projects, which entail complicated process from different parts, also require a sophisticated procurement and management skill. Subsequently, to survive in the competitive international market, we need to establish strategies to select potentially profitable projects at the initial stage of bidding process and to mitigate the high degree of risk exposure through contract negotiation and its adjustment. This research discusses the trend of environment in international construction markets. Then, it identifies the key factors that affect the profitability significantly through the structured surveys from 59 actual overseas projects, and it analyzes the key factors by using statistical methods. This research provides the profitability evaluation bases, with which overseas construction participants can forecast and analyze the risk more systematically, by eliciting profit-influencing factors using the result of statistical analysis, literature review and structuring their cause-and-effect relationships. The profitability casual hierarchy structure describes the profitability factors' hierarchy in details and their interrelationships. It also enables us to find out critical factors directly related to profitability aggravation through a qualitative and quantitative analysis. Ultimately, with this hierarchy structure as the base, the research will suggest how to develop the quantitative profitability forecasting model.

A Case Study on Reading Promotion Projects Led by the Korean Education Office Focused on the Project of 'Ulsan Studnets' Reading Day~ (교육청 주도의 독서진흥사업에 대한 사례연구 - '울산학생 책읽는데이~' 사업을 중심으로 -)

  • Youn, You-Ra;Lee, Soon Young
    • Journal of Korean Library and Information Science Society
    • /
    • v.50 no.1
    • /
    • pp.225-250
    • /
    • 2019
  • The study aims to explore 'reading promotion projects' led by the Korean Education Office and to ponder meaning of the projects, and then to propose the future directions for the projects. To achieve the purpose, the study selected to analyze a reading promotion project called as "Ulsan Students' Reading Day~" by Ulsan MetropolitanCity Office of Education as a case and sample for the study. The study was designed to use two research methods and phases to explore the project in detail: documentary research and survey method. First, the study collected and analyzed the literatures and contents related to the projects but focused on examining progresses of the project such as situations from the introduction stage to the settlement stage. Second, the study conducted survey to collect data from teachers and students who have experienced the project in elementary, middle and high schools. The detailed contents of questionnaires contain current states of the project in each school, assessment of the project, and requirements for the project. The study found that the project resulted in positive influence to students' reading skills and education. In spite of these positive results, it is necessary to develop altenatives to solve some limts in the current states of the project. Reading promotion projects, in long run, need to have profeissional staffs with responsbility for managing the projects, to improve environments for reading promotion, and to encourage students' voluntary participation to the projects.

Applications of the Participatory Learning Process in Health Promotion (건강증진을 위한 참여 학습의 적용 사례)

  • Kim, Jang-Rak;Jeong, Baek-Geun;Park, Ki-Soo;Kang, Yune-Sik
    • Journal of agricultural medicine and community health
    • /
    • v.36 no.2
    • /
    • pp.130-142
    • /
    • 2011
  • Objectives: This study was conducted to develop a participatory learning process and apply it to community empowerment for health promotion. Methods: The participatory learning sessions were composed of three stages according to the modified Freirean model of empowerment education. Stage 1 of generating themes (listening stage) was replaced with a community health forum. Stage 2 of problem-posing was executed via a two-session small group brainstorming discussion for selecting priority community health problems and strategies to solve them. Stage 3 of act-reflect-act, the implementation of the chosen strategies, is ongoing. We tested the feasibility of the participatory learning processes in the pilot programs for health education. Then, 14 Myeon (or Dong) Health Committee members used them in Health Plus Happiness Plus projects for community empowerment to achieve health equity in Gyeongsangnam-Do, Korea. Results: In the pilot program for feasibility, more than 80% of the 95 participants gave positive responses to evaluation questionnaires after three or four participatory learning sessions. Health Committee members successfully selected various strategies relevant to their communities with facilitation, but without any teaching from outside professionals. Conclusions: We successfully applied the participatory learning process to health promotion. However, more studies are warranted to evaluate its long-term applicability.

A Study on the Improvement of the Supporting Policy Efficiendy through the Analysis of the Demand for Direct Commercialization of Technology in Universities and Research Institutes (대학·연구기관 보유기술 직접사업화 지원사업의 수요분석을 통한 지원정책 효율성 개선 방안)

  • Cho, Sung-Nam;Jeong, Yoon-Su;Oh, Chung-Shick
    • Journal of Convergence for Information Technology
    • /
    • v.8 no.5
    • /
    • pp.229-236
    • /
    • 2018
  • In the past, technology commercialization was implemented in a narrow sense, such as technology transfer or start-up support. It has been pointed out that lack of entrepreneurial experience, failure in technology development, and insecure markets lead to failure of technology commercialization. The project supporting direct commercialization of technologies owned by academic and research institutes conjoins public funds and operating power of large enterprises to introduce a new technology commercialization model that combines commercialization technology with capital, market, and government policies. And pain points for direct commercializing technology was derived. Through research and analysis, a gap was found between the demand factors and the capability of the actors performing the technology commercialization, and it showed a significant correlation with the paint points. In consequence, measures were drawn to improve support policies to enhance the efficiency of commercialization of technologies held by universities and research institutes.

Value Management of Private Finance Initiative Projects (민간투자사업을 위한 VE 적용방안)

  • Lim, Jong-Kwon;Kim, Seoung-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.123-130
    • /
    • 2006
  • Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.

  • PDF

A Survey on the Persons in Charge for Economic Estimation Analysis and Improvement of BTL Projects (BTL사업의 경제성 평가 현황조사 및 개선을 위한 실무자 설문조사연구)

  • Lee, Chun-Kyong;Cho, Bong-Ho;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.73-80
    • /
    • 2007
  • As BTL(Build-Transfer-Lease) private investment business benchmarking PHI(Private Finance Initiative) of USA and Japan is introduces to Korea since 2005, as a part of supplying high leveled public service and early expanding required facilities for SOC, Value for Money on private investment business from treasury investment business at the beginning gets to be needed. Accordingly, this survey has been conducted in order to analyse BTL projects status, propriety of economic analysis method(VFM analysis, calculation of estimated business expenses, valuation of bidding price, etc.) by business advance phases from the viewpoint of person in charge, necessity of improvement and alternative plants. As the result of conducting cross tabulation analysis and correlation analysis by occupational group, BTL project advance phases and alternative plans for improvement, it is necessary ye prepare standardized service level against business expense and basis for calculating and evaluation operation expenses. Based on the necessity of quantitative analysis (LCC analysis) of VFM, standard for calculating management, maintenance and administration expenses is required. In addition, reliable economic valuation system considering domestic BTL environment should be setup, for business efficiency.

Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase - (해외 LNG 플랜트 리스크요인 도출 및 우선순위 평가 - 설계단계를 중심으로 -)

  • Jang, Woo-Sik;Hong, Hwa-Uk;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.146-154
    • /
    • 2011
  • Korean contractors have been maintained sustainable growth since entering into overseas construction market for the first time in 1960' s. In 2010, Korean contractors ordered 761 billion (USD) from overseas markets. Especially, billion (USD) were earned by Korean contractors in overseas plant construction market which account for more than 80% of the total amount by Korean contractors. Nevertheless, many Korean contractors are suffering from lack of technological competitiveness and construction management skills in the design phase compared with global leading contractors. These conditions have directly effect on the success of projects in terms of cost, duration, and quality. So, this study focused on identifying the risk factors and developing risk priority method for the design phase of LNG plant projects whose market is expanding. Research procedures were conducted by the following three steps. First, total 57 risk factors were identified in design phase through extensive literature reviews and experts survey. Second, the authors developed risk priority method which are more suitable for design phase of LNG plant projects by using three criteria, Probability(P), Impact(I), and Coordination Index(CI). Finally, the suitability of risk priority method and practical applicability were verified through expert survey and interview. Consequently, if korean contractors use the suggested risk factors and priority method based on their own know-how and experiences, then more reasonable and rational risk management will be conducted in the design phase of LNG plant projects.

Research Background and Plan of Enhanced Geothermal System Project for MW Power Generation in Korea (MW급 EGS 지열발전 상용화 기술개발사업의 추진 배경 및 계획)

  • Yoon, Woon-Sang;Song, Yoon-Ho;Lee, Tae-Jong;Kim, Kwang-Yeom;Min, Ki-Bok;Cho, Yong-Hee;Jeon, Jong-Ug
    • Tunnel and Underground Space
    • /
    • v.21 no.1
    • /
    • pp.11-19
    • /
    • 2011
  • Geothermal energy is believed to be an important source among the renewable energy sources to provide the base load electricity. Although there has been a drastic increase in the use of geothermal heat pump in Korea, there is no geothermal power plant in operation in Korea. Fortunately, the first EGS (Enhanced Geothermal System) Project in Korea has started in Dec 2010. This five year project is divided into two stages; two years for exploration and drilling of 3 km depth to confirm the minimum target temperature of 100 degrees, and another three years composed drilling 5 km doublet, hydraulic stimulation of geothermal reservoir with expected temperature of 180 degrees (40 kg/s) and construction of MW geothermal power plant in the surface. This EGS project would be a landmark effort that invited a consortium of industry, research institutes and university with expertises in the fields of geology, hydrogeology, geophysics, geomechanics and plant engineering.

Application of Value Engineering to Early Design Phases in Construction Projects (건설사업 설계초기단계 VE 적용방안)

  • Lee Seung-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.156-166
    • /
    • 2005
  • The purpose of this study is to present proper VE application methods to euly design phases. Since VE methodology is more effective on early stage of design phase, the study focused on application of VE methodology in early stage of design process. With the examination of past studies, obstacles of VE application in domestic construction industry are defined. To solve these problems, this paper presents (1) subdivision of VE execution time, (2) an appropriate VE targeting method for construction industry, (3) a resonable and practical function analysis process, and (4) modified design-VE job plan.