Browse > Article

Application of Value Engineering to Early Design Phases in Construction Projects  

Lee Seung-Hoon (서울시립대 대학원)
Koo Kyo-Jin (서울시립대 대학원 건축공학과)
Hyun Chang-Taek (서울시립대 대학원 건축공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.6, no.3, 2005 , pp. 156-166 More about this Journal
Abstract
The purpose of this study is to present proper VE application methods to euly design phases. Since VE methodology is more effective on early stage of design phase, the study focused on application of VE methodology in early stage of design process. With the examination of past studies, obstacles of VE application in domestic construction industry are defined. To solve these problems, this paper presents (1) subdivision of VE execution time, (2) an appropriate VE targeting method for construction industry, (3) a resonable and practical function analysis process, and (4) modified design-VE job plan.
Keywords
Design VE Process; Targeting method; Function Analysis; VE execution time;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 김민기,2002,'공공건설사업 시공前단계 사업비 관리 개선에 관한 연구', 서울시립대학교 도시과학대학원 석사학위논문
2 한국개발연구원 공공투자관리센터,2000,VE 방법론 및 제도활성화방안연구
3 한국건설기술연구원,2000,건설사업 VE기술 도입방안,건설교통부
4 Conner, AM., 2001, 'Requirements Analysis in the Value Methodlogy', SAVE International Annual Conference Proceedings
5 Shaozhi, H., Wujun, L., 2002, 'Systematic Value Methodology for Complicated Project Systems', SAVE International Annual Conference Proceedings
6 Warwich, T., 1994, 'Function analysis for team problem solving', SAVE International Annual Conference Proceedings
7 Blumstein, G., 1996, ''FAST diagramming: A technique to facilitate design alternatives', SAVE International Annual Conference Proceedings
8 최석인,2001,'건설VE 프로젝트에서 효과적인 FAST 적용 방안 및 FAST 작성 전산모델', 중앙대학교 박사학위논문
9 Gernerd, K., 1993, 'Successful application of value engineering at conceptual stage of design', SAVE International Annual Conference Proceedings
10 장인규,2002,'건축 기계설비 계획시 VE기법 적용에 관한 연구', 서울대학교 대학원 건축학과 석사학위논문
11 Park, R. J., 1996, 'FAST or not so FAST', SAVE International Annual Conference Proceedings
12 김철웅,2002,'설계VE 용역대가 산정방안에 관한 연구', 서울시립대학교 석사학위논문
13 정영일,2002, '설계VE의 효율적인 아이디어발상을 위한 TRIZ의 활용방안', 서울시립대학교 석사학위논문
14 Kelly, J., Male, S., 2001, 'A quick approach to Task FAST Diagrams', SAVE International Annual Conference Proceeding
15 Arratia, B. A., 1998,'A FAST-Driven approach to new production planning, SAVE International Annual Conference Proceeding
16 민경석,2001,'설계단계에서의 효과적 VE적용을 위한 기능 정의 프로세스 모델', 연세대학교 박사학위논문
17 전재열,2003,'건축 설계초기단계에서 VE 대상선정방법 개선방안에 관한 연구', 대한건축학회논문집 구조계 19권2호
18 Fowler, T. C., 1994, 'Forward to the Basics: createby-function', SAVE International Annual Conference Proceedings
19 Ellegant, H., 1995, 'Stop counting beans and start reducing surprises; Pre-design VE for construction', SAVE International Annual Conference Proceeding
20 Fowler, T. C., 1998, 'Targeting Value Studies', SAVE International Annual Conference Proceedings