• Title/Summary/Keyword: 사업기획단계

Search Result 225, Processing Time 0.026 seconds

A Study on the Prediction-Formulas of Approximate Estimate Based on Actual Work Cost for Subway (실적공사비에 의한 지하철 공사비 예측모형에 관한 연구)

  • Park, Jong-Hyuk;Jeon, Yong-Bae;Park, Hong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.1
    • /
    • pp.11-21
    • /
    • 2013
  • This study proposed cost prediction equation model by considering duration, construction, size, actual cost with the subway construction started by the actual cost system which was introduced since 2004. Costs - scale exponent n(confidence range: 0.5 to 0.7) for cost prediction of subway construction was drawn total cost(0.713), net cost(0.77) in point of the 11 subway construction data. The cost prediction equation model of the subway construction which was presented in this study is able to effectively apply to business planning, preliminary investigation, feasibility study, basic design stage to estimate the approximate cost in the future.

Development of a model for an equation for estimating construction costs based on the resource-based cost estimating system for TBM (TBM 공법의 자원기반 적산 방식에 의한 개산 공사비 예측 식 모델 개발)

  • Han, Seung-Hee;Park, Hong-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.3
    • /
    • pp.1474-1480
    • /
    • 2013
  • This study attempted to estimate construction costs in accordance with the resource-based cost estimation (unit cost price) system by diameter for TBM method, and analyzed the direct cost and the total cost. Based on such figures, this study performed a regression analysis and proposed a model for an equation for estimating construction costs. model for the resource-based cost estimation (unit cost price) system classified by diameter for TBM method proposed by this study can be effectively applied to business planning, preliminary investigation, feasibility study, construction cost estimations in the early design stages.

Service Design Methodology and Usability Analysis for National R&D Information Integration/Fusion Service (국가R&D정보 연계·융합 서비스를 위한 서비스 디자인 방법론과 사용성 분석)

  • Lee, Byeong-Hee;Kwon, Yee-Nam;Lim, Chul-Su;Shon, Kang-Ryul;Kim, Jae-Soo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.04a
    • /
    • pp.445-448
    • /
    • 2012
  • 본 연구는 R&D 정보 시각화를 위한 네비게이션 선행연구이다. 지금까지 R&D서비스에서는 연구 기획 단계에서부터 사업화에 이르기까지 기존의 연구 성과에 대한 조사 분석을 포함해서 해당 연구 주제에 대하여 기술동향, 시장분석, R&D정책 등 다양한 정보를 종합적이고 전략적으로 활용할 수 있는 정보 서비스가 부족하거나 제한적이었다. 이런 문제를 해결하기 위하여 본 논문에서는 서비스 디자인 방법론에 입각하여 R&D정보서비스의 서비스 디자인 프로세스를 사용하여 R&D 담당자와 UX 디자이너가 참여하는 사용성 평가와 서비스 디자인 방법론 수행 후 사용자 니즈를 분석해 보았다. 국가R&D정보와 관련된 정보처리기술 및 정보자원에 대해서는 기존 KISTI에 가지고 있는 국가R&D정보와 NDSL를 연계하고 이를 활용하여 연구자의 R&D활동에 관련된 문제해결을 지원하는 서비스 체제를 구축하고자 한다. 본 논문에서는 국가R&D정보 서비스 체제 구축을 위해 서비스 디자인 방법론과 사용자 분석을 통해 R&D정보 서비스의 개선 방향을 알아본다.

Risk Influencing Factors in Performance of River Disaster Prevention Project (하천재해예방사업의 성과에 미치는 리스크 영향요인)

  • Cho, Jin-Ho;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.4
    • /
    • pp.417-428
    • /
    • 2020
  • The characteristics of the construction project involved various stakeholders' involvement from the planning stage until completion of the object, which caused the uncertainty to increase. Successful construction projects require risk analysis and appropriate responses. Therefore, this study aimed to confirm the influence of risk management factors on the success of river disaster prevention construction in construction projects and the effect of moderating communication between stakeholders involved in the construction process. The Delphi method was used to derive the risk management factors of the construction process. The survey used a snow ball sampling method. For analysis, SPSS Statistic 20 and SmartPLS 2.0 were used. As a result of the study, the impact of risk management factors on project performance was found to be large in the order of time risk, quality risk, cost risk, safety risk, and construction environment risk. In addition, the impact of the communication moderating effect was large in the order of cost risk, quality risk, construction environment risk, time risk, and safety risk. In this study, it was confirmed that communication between stakeholders related to river disaster prevention work has a moderating effect that changes the ranking of impacts on project performance. This shows the importance of communication in the construction process of river disaster prevention works. This study has important significance in that it identifies the importance of risk management factors and communication in river disaster prevention works.

Preliminary Investigation for Apply of e-Government Framework at the Construction CALS System (건설CALS시스템에 전자정부 표준프레임워크 적용을 위한 사전 고찰)

  • Yang, Sung-Hoon;Kim, Nam-Gon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.433-440
    • /
    • 2013
  • The Ministry of Land, Infrastructure and Transport was developed the Construction CALS system for improvement of the construction economy. Construction CALS system is consist by Construction Portal System, Construction Management System, Construction Authorization and Permission System, Compensation Management System, Facility Maintenance Management System and has utilized at construction site of more than 900. Ministry of Land, Infrastructure and Transport and related researcher was proposed method of various function improvements for usability of the system. However, the proposed method was expanded the problems like increase of system management cost and development cost with decrease of data process rate. The problem was increases because has added of only service function without modify of software structure to the system on each different platform base. One of the methods for solving problems is to apply the e-Government framework and then integrated the different platform. The purpose of this paper is analyse of the applicability and efficiency of e-Government framework to the construction CALS system. For that was analyzed the e-Government standard framework and the developments case. And then was verified about the adaption possibility and efficiency by use the Function Point tool.

An Approximate Cost Estimating Model for Eco-River Facility Construction Project at Planning Stage (자연형 하천공사 개략공사비 산정모델의 개발)

  • Choi, In-Wook;Lee, Si-Wook;Woo, Sung-kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.104-112
    • /
    • 2009
  • After the middle of 90's, the eco rivers maintenance enterprise was propelled about city rivers. The environmental function is more emphasized because of revising the rivers law enforced at 2008.4. Also, the field of application is being magnified. It is difficult to apply that the conceptual public work expense estimating model of the rivers which adjusts a focus at open channel rivers excepts the small-scale rivers maintenance public work. The research presents a eco rivers public work conceptual public work expense estimating model frame work. It suits the change of the rivers environmental renewal construction paradigm. It develops the conceptual public work expense estimating plan of the rivers at the planning phase using the collection and analysis of the data. As a result, riffle, spur dyke, stepping stones, fish way and etc are added. Consequently, it brings the hydrophilic function is considered seriously conceptual public work expense estimating model of the eco rivers.

An Improved Scheme of Domestic Project Management Information System through Case Studies of Subway Construction in D. Area (국내 PMIS 사례분석을 통한 개선방안 - D지역 지하철 현장을 중심으로 -)

  • Kim Jin-Gyu;Hyun Kyung-Mi;Kim Whan;Kim, Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.380-383
    • /
    • 2004
  • Recently, by the growth of IT industry, the domestic construction is tried to spread with IT on the whole phases: 1)an, design, order, construction, and maintenance. On this, in the construction industry, is accelerated effort of the introduction of PMIS, it has various types of PMIS applied which is developed alone by large construction company and serviced with web-hosting by ASP corporation. In this study, through the analysis of PMIS which has applied on the subway construction in the D city, try to propose the improvement proposals and put out realistic problems. Therefore that analysis about needs of the order and operation of the phases, Domestic PMIS cases and International PMIS technique position have to consider and, the system is analyzed to needs of the order, design scheme, and utilization. On the basis of this result, the improvement proposals is proposed into the case of the contract, the system, the operation, the management and the contact of the external system.

  • PDF

Case Manager's Perception and Practices of Case Management Process at Community Psychiatric Rehabilitation Centers -Focused on the community psychiatric rehabilitation centers in Busan- (사회복귀시설 사례관리자의 사례관리 과정에 대한 인식과 수행에 관한 연구 -부산지역 사회복귀시설의 사례관리를 중심으로-)

  • Kim, Sun-Joo;Kim, Gyo-Jung
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.1
    • /
    • pp.221-233
    • /
    • 2013
  • This study aims to explore how to cognize and perform case management process to community psychiatric rehabilitation center in Busan area. The case of case manager for 12 people obtained by conducting focus group interviews were in-depth analysis. Many commissioned by a variety of human service organizations in the contract and the client-centric intake has been received. Assessment, rather than a function of mental disabilities center service needs, planning difficulties in securing resource discovery and felt. Intervention phase focuses on direct service and when several agencies responsible for the case management approach. The possession of responsibility was unclear. Mainly monthly facilities within the checking step checks are being made, there was a desire for the realistic-supervision. Completion stage expectations showed a performance evaluation oriented, and individualized case management that can be represented well on the rating scale.

A Study on the Readjustment of the Nigerian National Innovation System through Korean Case Analysis (한국 사례분석을 통한 나이지리아 국가 혁신 시스템 개선 방안 고찰)

  • Temitayo, Shenkoya;Kim, Euiseok
    • Journal of Korea Technology Innovation Society
    • /
    • v.21 no.4
    • /
    • pp.1237-1267
    • /
    • 2018
  • After independence in 1945, the South Korean economy rose steadily from a developing country to a developed country while, after independence in 1960, Nigeria is still a developing country with poverty on the increase, despite its large amount of natural resources. This research seeks to find a viable solution to this issue while studying the relationship that exist amongst Economic Development Plans (EDPs), National Innovation System (NIS) and economic development in Korea. The methodology used herein is a mixture of a systematic literature review and a semi-structured interview. The results of this study show that EDPs are essential to the enhancement of communication, and the flow of knowledge and innovation of the NIS. Furthermore, our result shows that the efficiency of the NIS is relevant to drive economic growth and development. Therefore, based on our analysis of the current situation in Nigeria and the development trajectory of Korea, we developed, introduced and recommended a theoretical framework called the "Multiple skipping" development trajectory as a model for development in Nigeria.

Strategy Planning for the Development of the Facility-Based Lifecycle Integrated Project Information Portal (시설물 기반 생애주기 통합 건설정보 체계 구축 전략 연구)

  • Kim, Sung-Il;Cho, Jung-Hee;Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.9
    • /
    • pp.26-36
    • /
    • 2019
  • Since more than 30 different information systems are collecting and providing construction related information, it is difficult for information users to figure out where and how to acquire the required information. Even if the user find the information, it is hard to meet users demand. Because the current systems accumulate the data just as administrative data and can do not connect the information from the different phases of the lifecycle for the specific facility. The information collected and managed in different information systems should be integrated in terms of lifecycle of the facility to improve money for value of public investment, the quality of life by improving quality of the facility and to provide the foundation for big data utilization in the construction industry. This paper suggested strategic planning for the development of the (assumed name) "The Lifecycle Integrated Construction Information Portal" as a foundation to use the data in construction industry, by investigating prerequisites and suggesting conceptual framework of the system.