• Title/Summary/Keyword: 사무소 건축물

Search Result 81, Processing Time 0.021 seconds

A Study on Seismic Performance of External Reinforcement for Unreinforced Masonry Buildings (비보강 조적조 건축물의 외부 보강에 따른 내진성능 연구)

  • Jong-Yeon Kim;Jong Kang
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.2
    • /
    • pp.43-52
    • /
    • 2024
  • In this study, we evaluated the seismic performance of a masonry building that was not designed to be earthquake-resistant and attempted to improve the seismic performance by adopting a seismic reinforcement method on the exterior of the building. In addition, the building seismic design standards and commentary(KDS 41 17 00:2019) and existing facility(building) seismic performance evaluation methods were applied to evaluate seismic performance, and a pushover analysis was performed using non-linear static analysis. As the result of this study, it was determined that seismic reinforcement was urgent because the distribution rate of earthquake-resistant design of houses in Korea was low and masonry structures accounted for a large proportion of houses. When reinforcing the steel beam-column+brace frame in a masonry building, the story drift angle was 0.043% in the X direction and 0.047% in the Y direction, indicating that it satisfied the regulations. The gravity load resistance capacity by performance level was judged to be a safe building because it was habitable in both X and Y directions. In conclusion, it is believed that the livability and convenience of the house can be secured by reinforcing the exterior of the building and the seismic performance and behavior of the structure can be clearly predicted.

Influence Factor Analysis for Feasibility Study of Building Projects (상업건축물의 사업타당성 영향요인 분석)

  • Son, Ki-Young;Kook, Dong-Hoon;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.462-466
    • /
    • 2006
  • The startingpoint of successful buildingproduction process is the feasibility study of the project. If the feasibility study is poor which is affected in direct production processes such as designing and engineering, it incurs a great unrecoverable loss to the company. The governmentinstitutionalized the feasibility study for projects that budgets over 50billion won in an effort to ensure competitiveness of the construction industry after IMF; however, the system and effort to created systematic studies or guidance preparation for private construction development projects are lacking in great deal. Therefore, the objective of this study is to establish the analysis factors of feasibility study and evaluation standard by systematic analysis in consideration of the changes of various variables and mutual relationships using system dynamics technique for office buildings among commercial buildings.

  • PDF

Heat Loss the Case Study of Office Building (사무소 건축물의 열손실 사례연구)

  • Kim, Kyeong-A;Kim, Bongl-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.51-54
    • /
    • 2011
  • In this study, It has the purpose to evaluate the insulation of the curtain wall of a building on the construction from 1990 to 2011 by measuring the inside and outside surface temperature of the curtain wall. The outside frame surface(mullion bar or spandrel bar) temperature of the curtain wall is 6℃~10℃ higher than that of the surface of glasses or insulation panel of curtain wall in winter. Furthermore the outside surface of frame anchor unit is 2℃~3℃ higher than section of other frame, so it was verified lossing lots of heating.

  • PDF

A Study on the Cost Impact of Additional Construction as Rating G-SEED Certification of Medium-Sized Office Buildings in Korea - Based on G-SEED 2016-2(Effective September 1, 2018) - (국내 중규모 업무용 건물의 녹색건축인증 등급별 추가공사 비용 영향에 관한 연구 - G-SEED 2016-2 기준으로(2018년 9월 1일 시행) -)

  • Lee, Du-Hwan;Kim, Jae-Moon
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.10
    • /
    • pp.225-234
    • /
    • 2019
  • The purpose of this paper is to analyze the additional construction cost of G-SEED certification for domestic office building reflecting the latest standard(G-SEED 2016-2), and to derive cost impact by category and level. Therefore, it is intended to provide quantitave cost data according to G-SEED certification at the planning phase of the project, estimate the additional construction cost per level according to G-SEED Certification of similar project to be carried out in the future, and encourage G-SEED certification by supporting the decision of the owners. Method: The Process and method of this study are summarized in five steps, 1) Review of previous research, 2) Selection of target project, 3) Scenario setting by level, 4) Additional construction cost for each evaluation category, 5) Extraction of additional construction cost ratio by level. Result: This paper analyzed the cost impact by deriving the additional construction cost of detailed category for level improvement according to the revised G-SEED certification(G-SEED 2016-2). In conclusion, an additional construction cost(ratio) of G-SEED projects to the reference building is drawn as good level; 157,426,241 KWN(+0.43%), very good level; 321,907,802 KWN(+0.88%), excellent level; 999,371,478 KWN(+2.74%), and outstanding level; 1,467,047,718 KWN(+4.02%).

Structural Performance of Beam-to-Column Joint Types in Dapo-style Buildings of the Joseon Dynasty (조선시대 다포계 건축물의 결구형태별 구조성능 평가)

  • Yoon, Jeong-Hoon;Choi, Yun-Chul;Lee, Eun-Jin
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.4
    • /
    • pp.8-14
    • /
    • 2019
  • In Korean traditional wooden architecture, joint performance varies with the material characteristics of timber, the form of joint, the precision of timber-trimming and the like. Case studies prove that the beam-to-column joint type has large influence on the degrees of deformation and spacing. This is not only true of single-story buildings, but also of large-scale multi-story buildings more apparently. Therefore, this study followed the process of examining to joint types, producing their specimens and testing their structural performance. As a consequence of structural test, the dovetail joint specimen showed the best outcomes of the maximum load and rigidity. Synthesizing the structural performances by respective forms of joints, the Doraegeoji dovetail joint specimen showed the higher performance, followed in order by the Doraegeoji mortise joint specimen and the Tongneoko dovetail joint specimen. The structural performance of a building varies with the characteristics by the shouldering forms of penetrating beams and with the joint types within the columns. This should be considered for the new construction or restoration of multi-story buildings, and be continuously researched henceforth.

Evaluation of the Energy Efficiency Rating in small office building according to the Thermal Performance of Building Envelope (소규모 업무용 건물의 외피 열성능에 따른 건축물 에너지효율등급 평가 연구)

  • Kim, Sang-A;Hong, Won-Hwa;Park, Hyo-Soon
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.4
    • /
    • pp.65-70
    • /
    • 2012
  • Each country has implemented various environmental policies to prevent natural disasters and destruction of ecosystem caused by global wanning. The republic of Korea also was performed building energy efficiency rating certification system as part of paradigm of 'Low carbon green growth' since 2010. However, the status on the building energy efficiency rating certification system has not been analyzed. In this study, We analyzed the elements affecting the energy efficiency of small office buildings focusing the status and certification cases of the building energy efficiency rating system. As a result, it is judged that thermal performance contribution of the building envelope is not high in the buildings certificated the first grade of the building energy efficiency rating system.

Survey Research on Thermal Situation of Office Buildings (사무소 건축물의 단열상황에 관한 조사연구)

  • Jung, Ui In;Kim, Bong Joo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.3
    • /
    • pp.145-152
    • /
    • 2013
  • This study is to evaluate the thermal insulation of the curtain wall of the buildings constructed since the 1990s to the buildings currently under construction in 2011 and to provide the basic data for repairing and reinforcing and designing the thermal insulation. To this effect, the temperature difference by part was analyzed through measuring the inside and outside surface temperature of the curtain wall of the office building, and thereafter, the conditions of the thermal insulation and the thermal bridge part were examined. The result of the study is as follows; Not only in the winter season when the temperature difference between the indoor-outdoor is over $20^{\circ}C$, but also in the summer season when there is a small temperature difference, the temperature difference between the inside and outside of the frame is $2^{\circ}C{\sim}4^{\circ}C$ equally. Under such conditions as stated above, the thermal bridge occurred, which resulted from the heat flow of the steel frame part (mullion, transom), and therefore, the reinforcement of the thermal insulation is considered to be needed.

Elasto-plastic behaviour of joint by inserting length of H-beam and structural laminated timber (H형강과 구조용집성재의 삽입길이에 따른 접합부의 탄소성 거동)

  • Kim, Soon Chul;Yang, Il Seung;Moon, Youn Joon
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.2
    • /
    • pp.251-259
    • /
    • 2006
  • In some cases, wooden structures are used for medium-rise buildings. It is therefore necessary to develop and test a new structural system for medium-rise buildings using wooden structures. This study deals with high-performance, laminated, timber-based composite members, which consist of structural laminated timber and H-beam. Simple beam tests were performed to determine the strength, stress distributions, and failure patterns of laminated timber. The main parameters are the insertinglength (1, 1.5, and 2 times the H-beam height) and the epoxy between the top/bottom flange of the H-beam and the top/bottom flange of the laminated timber. The results of the test show that the specimen with an inserting length that is 2 times the H-beam height was characterized by fairly god strength and stiffness.

Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage (프로토타입기반 기본설계단계 건축마감공사비 산정 모델)

  • Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.

A Study on Preservation Status of Buildings in the Cultural Heritage Zone of Folk Village - Focused on the Outside Zone of Castle in the Jeju Seongeup Village - (민속마을 문화재구역 내 건축물 보존현황에 관한 조사연구 - 제주 성읍마을의 성외지역을 대상으로 -)

  • Kim, Tae-Hyoung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.23 no.3
    • /
    • pp.27-35
    • /
    • 2021
  • This study aimed to analyze the current status of preservation of buildings in the Cultural Heritage Zone of folk village. Since actual residents inhabit and live in cultural properties, for instance a folk village, so their original forms have been changed over time responding to changes of the social environment. So this present study selected one folk village, located in the largest cultural heritage zone and lived most resident in our country, after which investigated its deformation process. This study also conducted in-depth analysis relying on the data collected from aerial photographs, field surveys, building ledgers. In particular, such analysis focused on changes in unauthorized alteration to the existing state that have been attempted so far. As a result, various variations were found in a number of buildings, caused from damages to landscape of cultural assets. Finally, the reasons for such deformation were interpreted to utilize as future references for restoration of the folk village landscape.