Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

Earned Value based Construction Project Control System (EV기반 공사관리시스템 기능의 비교분석 연구)

  • Lee Yoo-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.168-174
    • /
    • 2004
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

A Study on Welding Joint Parts of Heavy Equipment (중장비용 용접구조물의 신뢰성 평가)

  • Ko, Jung;Cho, Yong-Geun
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2002.06a
    • /
    • pp.111-111
    • /
    • 2002
  • 당사 제품인 건설 중장비용 대형 용접 구조물에 대하여, 설계단계부터 구조해석 및 초도품에 대한 Rig Test, 실차 시험 등 여러 단계를 거쳐 내구성을 평가하고 있다. 그러나 용접품 특성상 수명 평가 및 예측이 용이하지 않아 특히 내구성 개선 또는 효율 증대를 위한 경량화 등의 필요에 따른 설계 변경시 시행착오를 거치는 경우가 많다. 이에 개발 일정의 지연, 시험 비용의 증대 등이 불가피하고, 보증 수명의 증대를 통한시장 확대 등에 있어서도 애로가 있다. 또한 기존 Rig Test의 경우도 실제 사용환경과의 차이 등으로 인해 필드에서의 사용 수명을 예측하는데 한계가 있다. 이에 당 센터에서는 통계적 분석을 통한 사용 조건의 DB 구축과 제품 품질 DB의 구축 및 통합을 통하여 제관품의 특성을 반영한 용접 구조물의 가속 수명 평가법의 신뢰도 향상과 시장 목표에 부합하는 최적 설계 달성을 위한 독자적 Tool을 개발하고 있으며, 이에 대한 첫 번째 과제로 기확보 데이터에 대한 상관관계를 분석하였다.

  • PDF

RosettaNet based Business Integration Model for Enhancing Manufacturing Firm's Responsiveness (제조 기업의 대응성 향상을 위한 로제타넷 기반 비즈니스 통합 모델)

  • Park, Mok-Min;Park, Jeong-Ho;Shin, Ki-Tae;Park, Jin-Woo
    • The Journal of Society for e-Business Studies
    • /
    • v.15 no.1
    • /
    • pp.89-101
    • /
    • 2010
  • In some industries, manufacturing firms' distinctive competences include not only product superiority but also service excellence. For example, in a highly volatile and dynamic market, flexibility and responsiveness are more valued than just the product cost. And sales order processing, in that respect is a very important process. However, previous studies on sale order processing have considered only due-date assignments or dealt with production scheduling to minimize production cost or delivery lead time. Due to recent advances in information technology, a new approach is possible in dealing with sales order processing. For example, RFID(Radio Frequency IDentification) and ubiquitous computing technology adds real time visibility and traceability to supply chain. In this study, we develop a new due-date re-negotiation process for sales order management and propose a new business integration model to support the re-negotiation process based on RFID, ubiquitous computing technology and RosettaNet's PIPs.

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

A Suggestion for Merging Quality Management into Software Project Schedule Management (소프트웨어개발 일정관리와 품질관리의 통합 방안)

  • Paek, Seon-Uck;Han, Yong-Soo;Hong, Sug-Won
    • Information Systems Review
    • /
    • v.6 no.2
    • /
    • pp.195-208
    • /
    • 2004
  • In this paper we propose a new software project development management model incorporating quality management to schedule management. Though many efficient techniques such as code review and inspection are used to remove defects, the effect of defect removal time on project schedule hasn't been studied much. However, poor quality management has an important effect upon overall schedule and sometimes software projects fails due to it. Thus, quality management and schedule management should be considered together and we need to reflect the time to maintain software quality into the schedule management. For the proposed model we introduced "Quality Value" representing the needed time to remove software defects. We assume PSP/TSP to gather the needed data for quality value. The proposed model can be used to predict the effect of software defects on schedule in advance and to prevent schedule lag.

Development of Progress Management System based on Quality Inspection Information - Case Study on Nuclear Power Plant Construction - (품질관리 정보를 기반으로 한 진척도 관리 시스템 개발 - 원자력발전소 건설공사 사례를 중심으로 -)

  • Kwahk, Kil-Jong;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.73-84
    • /
    • 2011
  • This study represents construction progress management model based on quality inspection process in addition to cost-schedule integration. Quality inspection process cycle, resource estimate as progress measurement parameter, hierarchical structure of schedule, and inspection lots linking quality inspection to resource estimate are addressed as four main information areas. The authors established several process models to give a structure and correlations among information elements on each of these areas. Applying the process models proposed, an information system was implemented and utilized for nuclear power plant construction. It reveals that the system achieves accurate and objective progress information in near real time with significantly reduced time and effort as well as administrative efficiencies from making quality inspection process online.

Function Organization of nD CAD System for Plant Project by Linking Cost and Resource Information (비용과 자원을 연계한 플랜트공사 nD CAD 시스템 기능 구성 방안)

  • Kang, Leen-Seok;Ji, Sang-Bok;Moon, Hyoun-Seok;An, Jae-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.809-812
    • /
    • 2007
  • This study suggests a methodology for organizing functions of nD CAD model which 4D object is linked with cost and resource information. And the suggested model is composed of process analysis function of plant project based on visualized scenario analysis. That is, it is possible to manage effectively not only construction schedule plan, but also resource and cost information by integrating construction management information into nD CAD object. And the suggested model can be utilized as information of a effective decision-making tool through analyzing of optimal process scenario and sharing of an analyzed information.

  • PDF

A Study on Modularization of a Decommissioning Information Evaluation System (해체 정보 평가 시스템의 모듈 연구)

  • Park, Hee-Seoung;Kim, Sung-Kyun;Lee, Kyne-Woo;Oh, Won-Jin
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2005.05a
    • /
    • pp.305-308
    • /
    • 2005
  • 해체 준비 작업부터 해체 후 처리까지 가상의 디지털 해체 환경에서 해체 활동의 예측에 필요한 모듈별 기능들을 요소별로 검토 분석하였다. 해체 정보 통합 관리 시스템의 기본 정보를 제공할 수 있는 모듈을 확립하기위해 해체 데이터베이스와 3D CAD 를 연동시키는 방안에 대하여 연구하였다. 3 차원 dosimetric mapping 기술로 방사능 오염 분포를 입체적으로 묘사할 수 있는 모듈과 제염 해체 단위 작업별 평가식과 가중치 값을 이용하여 해체 작업자수와 해체 시간을 평가할 수 있는 모듈을 연구하였다. 연구 결과 가상의 해체 환경에서 연구로 및 원자력 시설 해체시 경제성과 안전성에 영향을 미치는 해체 일정과 해체 비용을 평가할 수 있는 단위 모듈들의 기능을 활용하여 해체 통합 관리 시스템의 설계 기준과 요구 조건 및 기능을 도출하였다.

  • PDF

Unifying User Requests for Multimedia Storage Systems (멀티미디어 저장 시스템을 위한 사용자 요청 통합)

  • Hwang, In-Jun
    • Journal of KIISE:Databases
    • /
    • v.29 no.1
    • /
    • pp.15-26
    • /
    • 2002
  • Most work on multimedia storage systems has assumed that client will be serviced using a round-robin strategy. The server services the clients in rounds and each client is allocated a time slice within that round. Furthermore, most such algorithms are evaluated on the basis of a tightly coupled cost function. This is the basis of well-known algorithm such as FCFS, SCAN, SCAN-EDF, etc. In this paper, we describe a scheduling module called Request Unifier(RU) that takes as input, a set of client request, and a set of constraints on the desired performance such as client waiting time or maximum disk bandwidth, and a cost function. It produces as output a Unified Read Request(URR), telling the storage server which data items to read and when these data items to be delivered to the clients. Given a cost function, a URR is optimal if there is no other URR satisfying the constraints with a lower cost. We present three algorithms in this paper that can accomplish this kind of request merging and compare their performance through an experimental evaluation.