• Title/Summary/Keyword: 비용 적정성

Search Result 385, Processing Time 0.025 seconds

Study on validating proper System Requirements by using Cost Estimations Methodology (비용추정방법을 활용한 시스템요구사항 적정성 확인방안 연구)

  • Choi, Sung Kyu;Choi, Eun Ha
    • Convergence Security Journal
    • /
    • v.13 no.5
    • /
    • pp.97-105
    • /
    • 2013
  • It is very important the government project should be supported by enough budget for proceeding. The insufficient budget by poor budget estimating uesd to bring about discontinuing for the project. This is originally caused by inaccuracy for cost estimating about system and evaluating for system requirements on the projet initial phase. The system requirements is technical requirements that converted the user needs and is needs for communicating between stakeholder and developer and manufacturer. Also the system requirements is the primary factor to make the project cost. The cost estimating is not easy due to complication of cost factors and an aberration between cost estimating and actual cost. Specially, on the project initial phase, shortage of detail information for project make more difficult to do cost estimating. This study proposes the architecture for validating proper system requirements by using cost estimations methodology on the project initial phase and shows the computer tool for simulating the proposed architecture.

Evaluating IT Outsourcing Contract Price by Using Total Cost of Ownership Analysis (TCO(Total Cost of Ownership) 분석을 이용한 IT 아웃소싱 계약가격 평가 연구)

  • Kim, Garp-C.;Choi, C.H.
    • Information Systems Review
    • /
    • v.3 no.1
    • /
    • pp.131-141
    • /
    • 2001
  • 그 동안 IT 아웃소싱에 관한 많은 연구성과에도 불구하고 아웃소싱 계약체결에 있어서 실무적으로 꼭 필요한 아웃소싱의 적정가격에 관한 연구는 매우 미진한 형편이다. 특히 아웃소싱 의뢰업체 입장에서의 적정가격결정 모형이나 사례를 찾아보기는 더욱 어려운 것이 현실이다. 아웃소싱 가격의 적정성은 공급업체 만이 아니 라 의뢰업체의 입장에서도 아웃소싱의 성패를 좌우하는 중요한 요건이다. 본 연구는 TCO 개념을 이용하여, IT 아웃소싱 의뢰업체의 입장에서, 적정 가격을 산정하는 모형을 실제 적용사례를 통해 제시한다. 본 연구는 아웃소싱을 하지 않을 경우의 총소요비용과 아웃소싱을 할 경우의 총소요비용을 비교하여 아웃소싱의 효과를 측정하고 계약가격의 적정성을 판단할 수 있도록 하고자 하였다. 본 연구를 통하여 제시한 TCO분석방법 및 결과는 아웃소싱을 준비하거나 계획중인 업체에게 자체적으로 아웃소싱 계약가격을 산출하고, 아웃소싱을 통한 비용절감항목을 판단하며, 계약가격을 비교할 수 있는 자료로 사용되어 지기를 기대한다.

  • PDF

한국(韓國) 철강산업(鐵鋼産業)의 공해저감시설(公害低減施設)에 대한 적정규모(適正規模) 분석(分析)

  • Lee, Myeong-Heon;Kim, Il-Jung
    • Environmental and Resource Economics Review
    • /
    • v.8 no.1
    • /
    • pp.75-94
    • /
    • 1998
  • 철강산업에 있어서 공해저감시설의 설치와 증 개축시 발생하는 제반 문제점과 함께 불완전한 시장과 제약된 경영여건하에서 각 기업들은 주어진 요소의 시장가격으로 생산비용 최소화의 실현과 더불어 합리적이며 효율적인 생산활동을 하고 있다고는 할 수 없다. 본 연구에서는 한국 철강산업을 대상으로 일반비용 함수 방식에 의한 계수검정을 실시하여 공해저감시설 또는 자본을 포함한 각 생산요소의 상대가격 효율성 달성 여부를 알아본다. 그리고 비효율성으로 인한 생산비용의 상승효과를 측정하고 공해저감자본의 실제 투입량과 적정수준과의 차이를 측정하여 공해저감자본에 대한 적정 투입률을 분석한다. 측정 결과, 상대가격의 비효율성으로 인하여 1982년부터 1994년까지의 기간 동안 철강산업의 생산비용이 연평균 약 13.6% 증가되었으며 공해저감자본은 적정수준에 비해 연평균 48.4% 적게 투입된 것으로 나타났다.

  • PDF

Evaluation of optimum cost for power system ancillary service (계통운영 보조서비스 적정비용규모 산정)

  • Ma, Sam-Sun;Yoon, Yong-Beum;Ahn, Nam-Sung;Lee, Jae-Gul;Kim, Hyun-Sil
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.353-354
    • /
    • 2006
  • 계통운영 보조서비스는 전력계통의 안정성 확보, 전기품질 유지 및 전력거래 활성화를 위한 필수적인 서비스이다. 계통운영보조서비스의 비용요소는 연료비, 운영유지비, 자본비용, 기회비용으로 구분된다. 이의 적정비용규모를 산정하여 보조서비스 제공자에게 보상함으로써 전력의 공급안정성 화보에 크게 기여할 수 있게 된다. 여기서는 국내 전력시장에서 연료비와 운영유지비 측면에서 적정비용규모를 산정하고 현재 운용중인 시장규칙과 비하여 개선방안을 제시한다.

  • PDF

Determination of optimal flood using total expected cost function (총 기대비용함수를 이용한 최적설계홍수량 결정)

  • Kim, Sang Ug;Choi, Kwang Bae;Seo, Dong Il;Cheon, Young Il
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.287-287
    • /
    • 2022
  • 홍수빈도분석의 실용적 측면의 목적은 특정 재현기간에 대하여 발생 가능한 홍수량을 설계홍수량(design flood)으로 설정함으로써 댐, 제방, 배수시설, 하수관거 등의 치수기능을 가진 치수시설물이 설계홍수량 내에서 홍수로 인한 피해를 발생시키지 않도록 그 규모와 기능을 설계함에 있다. 특히 우리나라의 경우 유량자료의 부족으로 강우빈도분석을 수행하여 재현기간별 확률강우량을 먼저 산정하고 이를 강우-유출모형을 통해 확률홍수량으로 전환한 뒤 하천등급에 따른 재현기간 기준에 따라 설계홍수량을 산정하고 있다. 그러나 이와 같이 결정된 설계홍수량이 특정유역에서 발생될 수 있는 피해규모에 대해 얼마나 적정한 지의 여부를 과학적으로 판단하기 위한 연구는 국내·외에서 찾아보기 어려우며, 이러한 문제를 개선하기 위한 기초 이론을 제공하는 것이 본 연구의 가장 중요한 목표이다. 홍수빈도분석을 통해 산정된 설계홍수량의 적정성 여부를 과학적으로 판단하기 위해 최근에 진행된 해외의 몇몇 연구에서는 총 기대비용함수(total expected cost function)의 개발에 근거한 최적설계홍수량을 활용할 수 있음을 제안한 바 있다. 이 개념은 계획된 설계홍수량 이상에서 발생될 수 있는 피해함수(damage function) 및 기대피해함수(expected damage function)와 비용함수(cost function)가 결정되면, 이로부터 총 비용을 나타내는 총 기대비용함수(total expected cost function)을 도출하고 총 기대비용함수가 최소가 되는 최적설계홍수량(optimal design flood)을 산정하여 이를 계획된 설계홍수량(tentative design flood) 비교함으로써 계획된 설계홍수량의 적정성을 판단하는 과정을 기초이론으로 활용한다. 본 연구에서는 불확실성으로 발생되는 범위를 고려한 최적설계홍수량을 산정하기 위하여 Metropolis-Hastings 알고리즘을 사용하였으며, 자료의 종류에 따른 홍수량의 변화를 분석하기 위하여 년최대계열 및 부분시계열 자료를 각각 적용하였다. 한강유역에서 가평대성, 여주 및 한강대교 수위표 지점에서 측정된 자동관측유량장치에 의한 홍수량 자료를 활용하였으며, 최적설계홍수량이 기존 설계홍수량에 비해 크게 산정됨을 알 수 있었다.

  • PDF

An Investigation on the Propriety of Ratio-Unit Price Method for Estimating Demolition Cost (해체 공사 원가분석을 통한 비율단가 적용방식의 적정성 검토)

  • Sung Nak-won;Kim Young-suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.579-583
    • /
    • 2004
  • A new and extendable highway should be planned and budgeted by estimating the total construction cost on the basis of the precise cost data. However, the demolition or disjointing cost could not reflect construction site condition sufficiently because it was simply estimated by multiplying the highway structure installation cost by the regular ratio($10\~70\%$) specified in the Korea Standard Estimate. The regular ratio for estimating of demolition and disjointing cost was calculated by not actual construction cost data but subjective experiences of field manager. Therefore, the reliance of the estimated demolition or disjointing cost has been declined. The primary objective of this study is to purpose the standard for estimating proper demolition or disjointing cost of relevant items through various site analysis and survey, and to investigate on the propriety of ratio-unit price method for estimating demolition and disjointing cost.

  • PDF

Study on fairness issues in mobile telecommunication service bill rates (이동통신서비스요금의 적정성에 관한 연구)

  • Shin, Jin
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.05a
    • /
    • pp.467-470
    • /
    • 2013
  • Telecommunication cost have been increasing successively in Korean hoseholds and its level is high now. Even though here are a lot of issues related to the high bill of mobile telecommunication services, plausible solutions have not been provided yet. 99% of Koreans use mobile phones and it is the highest rate in the world, but bill is relatively high. This situation may be brought by the government policy selection that it supports three mobile telecom companies systems. Thus least efficient company should be supported to sustain by pricing policy and MVNO cannot come into the market. The government can make mobile pricing system consider revenue and cost only in proper manner and constrain marketing cost in the rational level. And it can reduce mobile bill levels and selection rights of consumers by restraining too much complicated bill system. Fairness of mobile phone bill levels could be achieves by mobile telecommunication structure improvement through active MVNOs and reduction of excessive marketing costs. Mobile bills can be made more acceptable if the base is measured rate system.

  • PDF

The study on fairness issues in mobile telecommunication service charges (이동통신서비스요금의 적정성에 관한 연구)

  • Shin, Jin
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.17 no.9
    • /
    • pp.1975-1985
    • /
    • 2013
  • Telecommunication costs have been increasing successively in Korean households. Even though there are a lot of issues related to the high charges of mobile telecommunication services, plausible solutions have not been provided yet. 99% of Koreans use mobile phones and it is the highest in the world, but charges are relatively high. This situation may be brought by the government policy that supports 'three companies system.' Even the least efficient company might sustain by a tacit bottom price policy and the government did not introduce MVNO into the market. The government can make mobile phone charge system consider cost only in a proper manner and constrain marketing costs to the rational level. And it can reduce mobile charges and rights of consumers must be respected by restraining too much complicated rates system. Fairness of mobile phone charges could be achieved by mobile phone market structure improvement through active introduction of MVNOs and reduction of excessive marketing costs. If proper market structure and policy management are secured, 30% cut of charges could be achieved. And mobile service bills may be made more acceptable if charge is based on a measured rate system according to the amount of data usage.

OFFICE빌딩공사의 가설공사에 대한 적정비용산정에 관한 연구

  • 진영운;박종근;이영섭
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 1998.05a
    • /
    • pp.199-205
    • /
    • 1998
  • 최근 우리나라는 건설업의 산업재해자수가 '91년 이후 지속적인 감소 추세이지만 선진국에 비해서 아직 높은 편이다. '96년 건설업의 평균 재해율은 0.81%이며, 사망자수는 전 산업에서 29.5%에 이르는 것으로 나타났다. 이와 같이 심각한 건설업의 산업재해는 공사 자체의 위험성이 높은 특수성도 있지만, 가설공사에 대한 인식 부족으로 인한 낮은 투자가 원인이라고 볼 수 있다. 건설현장의 재해를 줄이고 시공의 안전성을 확보하기 위해서는 가설공사의 적정한 투자비용을 근원적으로 확보하여야 할 것으로 생각된다. (중략)

  • PDF

Bus operation control using control points (운행관리점을 이용한 버스운행관리)

  • 김성인
    • Proceedings of the KOR-KST Conference
    • /
    • 1998.10a
    • /
    • pp.457-464
    • /
    • 1998
  • 이 연구는 효율적인 버스운행관리를 위한 운행관리점의 적절한 위치와 적정 개수를 구하는 방법을 제시한다. 운행관리점이란 버스운행관리를 위해 버스노선에 정해놓은 일정한 지점으로, 주로 주요 정류장에 위치하게 된다. 운행관리점에서 버스가 정시성을 이루며 도착하도록 운행관리를 한다. 운행관리점의 적절한 위치와 적정 개수를 구하기 위하여 승객기회손실비용과 운행관리점 운영비용을 최소화하는 최적화모형을 구축하였다. 그리고 이 모형에서 결정된 운행관리점을 시뮬레이션 모형에 적용하여 실제 운행관리의 효율성을 검증하였다.

  • PDF