• Title/Summary/Keyword: 비용구조

Search Result 3,408, Processing Time 0.032 seconds

Development of Bridge Maintenance Method based on Life-Cycle Performance and Cost (생애주기 성능 및 비용에 기초한 교량 유지관리기법 개발)

  • Park, Kyung Hoon;Kong, Jung Sik;Hwang, Yoon Koog;Cho, Hyo Nam
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6A
    • /
    • pp.1023-1032
    • /
    • 2006
  • In this paper, a new method for the bridge maintenance is proposed to overcome the limit of the existing methods and to implement the preventive bridge maintenance system. The proposed method can establish the lifetime optimum maintenance strategy of the deteriorating bridges considering the life-cycle performance as well as the life-cycle cost. The lifetime performance of the deteriorating bridges is evaluated by the safety index based on the structural reliability and the condition index detailing the condition state. The life-cycle cost is estimated by considering not only the direct maintenance cost but also the user and failure cost. The genetic algorithm is applied to generate a set of maintenance scenarios which is the multi-objective combinatorial optimization problem related to the life-cycle cost and performance. The study examined the proposed method by establishing a maintenance strategy for the existing bridge and its advantages. The result shows that the proposed method can be effectively applied to deciding the bridge maintenance strategy.

Estimating optimal flood of the hydroelectric dams on the Bukhangang River (북한강 수계 수력발전댐의 최적설계홍수량 추정)

  • Kim, Sang Ug;Choi, Kwang Bae;Seo, Dong Il;Cheon, Young Il
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.286-286
    • /
    • 2022
  • 홍수피해를 최소화하기 위한 수공구조물의 적정 규모 결정을 위해 사용되는 홍수빈도분석에는 통계적 분석절차에 따른 불확실성이 포함된다. 따라서 불확실성이 포함된 범주 내에서 가장 적절한 설계홍수량(design flood)를 결정하는 과정은 수공구조물의 최종단계에서 중요하게 다루어져야 하는 부분이나 이를 제시한 연구는 많지 않다. 비용-편익 분석기법을 홍수빈도분석 절차에 도입하여 구성되는 총 기대비용함수(total expected cost function)는 설계홍수량 중 최적 설계홍수량(optimal design flood)를 결정하기 위한 새로운 접근방식이다. 이 절차는 UNCODE(UNcertainty COmpliant DEsign)로 명명되어 사용된 바 있으나, 국내에서는 아직 적용 결과가 소개되지 않고 있다. 따라서 본 연구에서는 UNCODE의 수학적 구성 절차를 소개함과 함께 북한강수계에 위치한 수력발전댐(화천댐, 춘천댐, 의암댐, 청평댐)의 년최대유입량을 사용하여 최적 설계홍수량을 산정하고 이 결과를 기존 홍수빈도분석 결과와 비교하였다. 불확실성이 고려된 총 기대비용함수로부터 확률분포함수들(Gumbel 및 GEV)의 모수를 추출하는 과정에서 Metropolis-Hastings 알고리즘을 사용하여 불확실성의 범위를 추정하였으며, 비용-편익 분석기법에 사용되는 비용 및 피해함수는 수학적 구성의 편의성을 위하여 1차 선형함수로 가정되었다. 4개의 발전용댐, 2개의 확률분포 및 2개의 재현기간에 대하여 최적 설계홍수량의 중앙값이 기존 홍수빈도분석 절차에 의해 산정된 설계홍수량보다 일정 정도 큰 값으로 산정됨을 알 수 있었다. 향후에는 본 연구에서 적용된 절차를 간단한 수식형태로 함수화하여 발전용댐 운영의 실무업무나 하천기본계획의 수립 등에 있어 비용-편익분석 기법의 적용성을 높이기 위한 연구가 진행될 필요가 있을 것으로 판단된다.

  • PDF

Search Technique for the Design of Cost Effective Fault Tolerant Systems (효율적인 결함허용 시스템 설계를 위한 탐색기법)

  • 이효순;신현식
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.6-8
    • /
    • 2000
  • 결함허용 시스템은 다양한 형태의 중복을 사용하여 신뢰도를 향상시킬 수 있는 반면, 시스템의 비용을 크게 증가시킨다. 본 논문은 만족스러운 신뢰도를 갖추면서 추가 비용을 적게 요구하는 결함허용 컴퓨터 시스템의 구조를 결정하기 위한 설계 문제를 정의하고 탐색에 기반을 둔 해결법을 제안한다. 이 때, 탐색 기법이 방문하는 탐색 공간의 크기를 줄이기 위하여 사용되는 세 가지의 유용한 사실을 설명한다. 이를 바탕으로 삼중 모듈 중복(TMR: Triple-Modular-Redundancy), 백업 예비(backup sparing), 그리고 혼합 중복(hybride redundancy) 기법과 같은 결함허용 기법들이 시스템 구조에 적용되었을 때, 탐색 공간을 줄이는 용도로 사용될 수 있는 신뢰도 제약조건을 유도해낸다.

  • PDF

Optimal Life Cycle Cost Design of a Bridge (교량의 생애주기비용 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.115-122
    • /
    • 2010
  • The importance of the life cycle cost (LCC) analysis for bridges has been recognized over the last decade. However, it is difficult to predict LCC precisely since the costs occurring throughout the service life of the bridge depend on various parameters such as design, construction, maintenance, and environmental conditions. This paper presents a methodology for the optimal life cycle cost design of a bridge. Total LCC for the service life is calculated as the sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The optimization method is applied to design of a bridge structure with minimal cost, in which the objective function is set to LCC and constraints are formulated on the basis of Korean Bridge Design Code. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on damage probabilities to consider the uncertainty of load and resistance. Repair and rehabilitation cost is determined using load carrying capacity curves and user cost includes traffic operation costs and time delay costs. The optimal life cycle cost design of a bridge is performed and the effects of parameters are investigated.

Model Structure and its Solution of Analytical Research on Transit Network Design (대중교통 노선망 설계에 관한 해석적 연구의 모형 구조와 풀이)

  • Park, Jun-Sik;Gwon, Yong-Seok
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.6
    • /
    • pp.129-140
    • /
    • 2007
  • The planning procedure of a transit operation consists of design, operation, and evaluation according to the research characteristics. There are some review studies on the operation and evaluation procedure, but the research on the design procedure has not yet been organized systematically. In this study, the research on transit system design was reviewed and the model structure and its solution method were arranged. The decision variables of the design procedure are network structure, line spacing or position, stop spacing, dispatching headway, and fleet size. In the analytical research on design procedure, system total cost is generally used as the objective function. System total cost is comprised of user cost, which is the sum of user access, waiting, and travel cost, and operating cost. Total cost of the transit system, used as the objective function, has the unique minimum because it is differentiable. There is a certain decision variable that makes the derivative of the objective function equal to zero and the second derivative of the objective function is positive. Therefore the decision variable that makes the first derivative of the objective function zero is the optimum that minimizes the objective function, and each of the cost components of the objective function become the same. This study is expected to help understanding about the research on the design procedure of transit operation planning and to help be a catalyst for relevant research.

Estimating the Switching Cost in the Korean Residential Electricity Market Using Discrete Choice Model (이산선택모형을 이용한 주거용수용가의 전력서비스 전환비용 추정)

  • Lee, Jongsu;Lee, Dongheon;Lee, Jeong-Dong;Park, Yuri
    • Environmental and Resource Economics Review
    • /
    • v.13 no.2
    • /
    • pp.219-243
    • /
    • 2004
  • Generally, electricity market has monopoly market structure because of need of enormous investment for infrastructure. However, the introduction of competition in network industry as electricity is a tendency of the world with decreasing the effects of economy of scale due to the advancement of technology. Now, electricity industry restructuring is in progress but the competition in electricity retail market is not in force yet in Korea. Whether a effective competition exist or not is very important to policy decision maker who drive restructuring, but there are small numbers of quantitative researches on that. In this study, we estimated the effectiveness of competition in the electricity retail market through switching costs. If switching costs are high, consumers actually can be locked in incumbent firm in spite of introduction of competition. Therefore switching is a critical factor to determine effectiveness of competition and to estimate the size of switching costs quantitatively can proffer the information about whether the competition in the electricity retail market is effective or not in the future. We estimated switching costs using consumer' stated-preference data by conjoint analysis. In according to estimation results, the cost of switching process is not so high, but the relative brand loyalty of an incumbent company is significantly high. And the price is considered as the most important factor choosing an electric service commodity. Based on the empirical results, it is possible to analyze the relationship between suppliers' competitiveness resulted from management efficiency and customers' switching possibilities. The paper therefore provides guidance for suppliers in deciding to enter into retail competition and for policy makers in introducing retail competition. And it has a significance of estimating the switching costs directly.

  • PDF

Reliability-Optimal Design Method of High-Speed Railway Bridges Based upon Expected Life-Cycle Cost (기대생애주기비용에 기초한 고속철도교량의 신뢰성-최적설계 방안)

  • Lee, Woo-Sang;Bang, Myung-Seok;Han, Sung-Ho;Lee, Chin-Ok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.102-110
    • /
    • 2010
  • The reliability evaluation may be a efficient method for estimating of the quantitative structural safety considering the effect of uncertainties included in high-speed railway bridges. The expected life-cycle cost(LCC) based upon the reliability evaluation will reasonably offer the safety level and design criteria of high-speed railway bridges. Therefore, this study determined the expected life-cycle cost and optimal design method of high-speed railway bridges on the basis of the result of the numerical analysis and reliability evaluation. For this, after creating various design method based upon the standard design of high-speed railway bridges, the numerical analysis is conducted on each of the alternative design methods. The reliability evaluation by the design strength limit state function is conducted considering the effect of external uncertainties on the basis of the numerical analysis result. The expected life-cycle cost of high-speed railway bridges is calculated on the basis of the reliability evaluation result by each of the alternative design methods. Also, the optimal design method is determined using the calculated expected life-cycle cost. In addition, The result of reliability evaluation and expected life-cycle cost of optimal design method are examined considering the effect of internal uncertainties. It is expected that the result of this study can be used as a basic information for the systematic safety evaluation and optimal structure design of high-speed railway bridges.

An Investigation on the Propriety of Ratio-Unit Price Method for Estimating Demolition Cost (해체 공사 원가분석을 통한 비율단가 적용방식의 적정성 검토)

  • Sung Nak-won;Kim Young-suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.579-583
    • /
    • 2004
  • A new and extendable highway should be planned and budgeted by estimating the total construction cost on the basis of the precise cost data. However, the demolition or disjointing cost could not reflect construction site condition sufficiently because it was simply estimated by multiplying the highway structure installation cost by the regular ratio($10\~70\%$) specified in the Korea Standard Estimate. The regular ratio for estimating of demolition and disjointing cost was calculated by not actual construction cost data but subjective experiences of field manager. Therefore, the reliance of the estimated demolition or disjointing cost has been declined. The primary objective of this study is to purpose the standard for estimating proper demolition or disjointing cost of relevant items through various site analysis and survey, and to investigate on the propriety of ratio-unit price method for estimating demolition and disjointing cost.

  • PDF

Evaluation the Relationship between SW Engineering Level and SW Quality cost (SW공학수준과 품질비용 관계 분석)

  • Kim, Seung-Gweon;Ko, Byong-Sun;Lee, Sang-Eun
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2011.06b
    • /
    • pp.136-139
    • /
    • 2011
  • SW 품질비용은 좋은 품질의 소프트웨어를 만들기 위한 경제적 상충관계(trade-off)를 이해하는데 도움을 주는 유용한 도구이다. 일반적으로 제조업 분야에서 많이 활용되고 있는 품질비용을 소프트웨어 분야에 적용하는 것은 SW품질을 높이는 좋은 방안이지만 불행하게도 이제까지 별로 관심을 받지 못했다. 본 논문에서는 SW품질을 활용하기 위한 판단근거(rationale)와 구성요소를 살펴보고, 국내 SW개발 프로젝트를 대상으로 수집된 자료를 바탕으로 국내 SW개발 프로젝트의 품질비용구조를 살펴보고, SW공학수준에 따른 품질비용의 차이를 통계기법을 통해 살펴보았다. 분석결과, SW공학수준에 따라 투입되는 품질비용의 차이가 있고, 공학수준이 높을수록 적게 투입되는 것으로 나타나고 있다.

Capital Structure Inertia and Product Market Competition (자본구조의 관성과 상품시장 경쟁간의 관계)

  • Choi, Chilsun;Son, Pando;Yi, Sangeun;Kim, Sanghyun
    • International Area Studies Review
    • /
    • v.21 no.2
    • /
    • pp.143-169
    • /
    • 2017
  • This paper empirically examines how capital structure inertia varies across industries and there is different in industries, and whether this fact is explained by product market competition using non-financial firms listed in KOSP market over periods of 1981 to 2015. In empirical test, I find that firms with more competition environment tend to have inertia behavior in making decision of capital structure. This implies that it is explained by debt discipline effect and it is substitution for product market competitions. Also I find that manager tends to take action actively making decision of capital structure when product market competition is low. Also I show that they use debt to constraint the free cash flow. As a result, I conclude that Korean non-financial firms do not have more strong inertia behavior in capital structure rather than U.S. firms. Second, using OLS estimation, inertia effect disappears while there is strong inertia effect in relationship between inertia and product market competition. This result suggests that transaction cost is not key factor in explaining inertia behavior of capital structure.