• Title/Summary/Keyword: 비계설치작업

Search Result 15, Processing Time 0.022 seconds

Case Study for Preventing Construction Site Fall Accidents (건설현장 추락사고 예방을 위한 사례 연구)

  • Choi, Du Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.81-88
    • /
    • 2019
  • Recently, the government has shown a decrease in disaster accidents throughout the industry and construction industry due to various efforts to reduce disasters. However, the fall accidents in the construction industry are not decreasing but increasing. In particular, the fall accident caused by scaffolding is low each year, but the disaster intensity is very high in that it directly leads to the death of workers. Scaffolding working environment in domestic construction industry is very poor. Moreover, scaffold workers in small construction sites are not subject to safety oversight and control. Therefore, this study is the installation and non-installation of the vertical lifeline, which is the most fundamental problem to be prevented during the study, to prevent the fall of the moon scaffold. In addition, it is hoped that it will be a solution for preventing accidents in construction site construction through the identification of various causes of disasters such as rope loosening, rope breaking, and fixed point failure.

A Study on the Development of System Scaffolding for Elevator Installation Work (엘리베이터 설치 작업용 시스템 비계 개발에 관한 연구)

  • Hwang, Jong Moon;Lee, Ki Yeol;Lee, Kyung-Sun;Jeon, Du Seung
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.4
    • /
    • pp.51-57
    • /
    • 2022
  • In recent years, the government's urban housing expansion policy has resulted in increased construction and remodeling work of residential houses and apartments, causing more industrial accidents at elevator installation sites. Typically, accidents occur during the installation and dismantling of work scaffolds inside the hoistways or using non-standardized work scaffolds due to their structural instability. In view of this, the present study deals with the development of a standardized elevator system scaffolding that can be safely installed outside the hoistway, securing the work platform inside the hoistway. An improved version of the scaffolding system eliminates the need to enter the hoistway for the scaffolding installation, thereby preventing accidents.

Development of Quality Evaluation and Management System for Assembled Temporary Equipment - Focused on Steel Pipe Scaffolding, System Scaffolding and Support - (조립 가설기자재 품질평가 및 관리 시스템 개발 - 강관 비계, 시스템 비계, 시스템 동바리를 중심으로 -)

  • Jang, Ji young;Lee, Ji yeon;Kim, Ha yoon;Lee, Jun ho;Kim, Jun-Sang;Kim, Jung-Yeol;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.43-55
    • /
    • 2022
  • Since assembled temporary equipment is widely used for construction work that should be carried out before this construction begins, it is essential to secure quality during assembly and prevent safety accidents caused by assembled temporary equipment after installation. However, it was investigated that most construction site managers are not aware of its importance, such as recognizing the quality management of assembled temporary equipment as a task of managing temporary structures that are dismantled after installation for this construction. The quality management work of assembled temporary equipment at the construction site is carried out in different ways for each construction site because there is no formalized procedure and the subject of performing. In addition, it is analyzed that the manager of the general construction company inspects and reflects the parts that need to be inspected without evidence, so transparency is not guaranteed and the result leads to a serious disaster. Therefore, the purpose of this study is to establish a document preparation-oriented system that provides systematic quality evaluation and management procedures for securing the quality of assembled temporary equipment, develops a checklist for quality evaluation and management, and supports history management on the web.

Structural Performance Evaluation of System Scaffolding for Elevator Installation Work (엘리베이터 설치 작업용 시스템 비계의 구조 성능 평가)

  • Jong Moon Hwang;Gi Yeol Lee
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.3
    • /
    • pp.61-68
    • /
    • 2023
  • This study performed a structural performance evaluation of a system scaffolding for elevator installation work developed in previous studies. The structural performance was evaluated via a structural test conducted to apply the working load specified in the design standard. The deflection of the horizontal member and the stress of each member constituting the system scaffolding were measured. Consequently, the structural safety evaluation including structural behavior and required performance was performed using the deflection and stresses measured from the structural test. The structural test and safety evaluation results based on the heavy working load corresponding to the design load indicated that the deflection, which is the performance criterion of the horizontal member, did not exceed the allowable value. Further, each member's stress, which is a safety evaluation indicator, did not exceed the allowable strength for both horizontal and vertical members with bending behavior and fordable bracing with tensile behavior, while also satisfying the required safety factor. In addition, the results confirmed the safety against deformation, partial damage, and destruction owing to excessive and maximum load. Therefore, the system scaffolding developed in this study satisfies both the structural performance and safety required by the design standards; thus, it can be applied to elevator installation work sites.

Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index (현장중심의 건설가설기술요소 분류체계 구축)

  • Park, Junmo;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.77-85
    • /
    • 2014
  • A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.