• Title/Summary/Keyword: 붕괴 원인

Search Result 522, Processing Time 0.025 seconds

Analysis of Breach Mitigation Effect on Levee made with New Substance by Overtopping (신소재 활용 제방의 월류 붕괴 경감 효과 분석)

  • Ko, Dong-Woo;Kang, Joon-Gu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.2
    • /
    • pp.1-8
    • /
    • 2018
  • Levee breaches can result from flooding due to torrential rainfalls, which are linked with recent abnormal climates and the aging of river levees. Breaches have caused enormous property damage and human casualties in lowland areas. Overtopping was found to be the cause for approximately 40% of all cases of breach. In this study, the reasons and mechanisms behind levee breaches were analyzed using hydraulic model testing. The overtopping stability and time delay effect of breaches were assessed for levees made with a new environmentally friendly substance. Image analysis revealed that the total breach time of the levees made with the new substance was about 2.25 times greater than that of an earthen levee. The initial breach rate of a general earthen levee was about 1.43 times higher than that of levees covered with the new substance, and the body collapsed rapidly. The breach mechanisms of levees covered with the new substance were completely different, and it is possible to prevent rapid breaches by mitigation of the breach speed on the slope by resisting overtopping.

Study on Establishment Criteria of Dam Emergency Action Plan (댐 비상대처계획(EAP) 수립기준 연구)

  • Park, Ki-Chan;Choi, Kyung-Sook
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.257-257
    • /
    • 2017
  • 본 연구는 기상이변의 영향으로 지속적으로 발생되고 있는 댐 저수지 붕괴에 대한 원인 분석과 기존의 관련 연구 및 지침 등을 비교 분석하여 현재 실무에서 적용되고 있는 댐 저수지 비상대처계획(EAP) 수립 대상 기준에서 제외되는 시설물의 붕괴 가능성 평가를 통해 EAP 수립 대상의 적정 범위를 제시하고자 하였다. 이를 위해 본 연구에서는 시설물의 붕괴 가능성에 대한 정량적 판단 기준을 각 요인별로 제시하고, EAP 수립 대상에서 제외되는 댐 저수지를 대상으로 붕괴 가능요인을 적용하여 3개 이하의 붕괴요인에 해당될 경우 저위험군, 4개 및 5개의 붕괴요인에 해당될 경우 중위험군과 고위험군으로 각각 분류하여 시설물 붕괴 위험성 정도에 따른 적절한 대응이 이루어질 수 있도록 제안하였다. 댐 저수지 붕괴 사례 분석을 통해 도출된 붕괴 가능성의 주요 요인으로는 저수용량, 제체 높이, 준공 경과연수, 우심피해 및 지진피해 잠재지역이 포함되며, 각 요인별 객관적인 판단기준은 댐 저수용량의 경우 EAP 법적 수립기준 및 과거 붕괴사례 등의 분석을 토대로 붕괴사례 61개소 중에서 약 88%를 차지하는 저수용량 10만톤을 선정하였으며, 댐 높이의 경우 댐의 파괴양상(이종태, 1987)에서 제시한 댐 붕괴부 특성과 미국주댐안전협회(ASDSO: American Society of Dam Safety Official) 학술지인 Dam Safety(2006) 등에서 제안한 기준을 기존의 댐?저수지 붕괴사례에 적용하여 댐 붕괴폭과 댐 높이의 상관관계 분석 결과를 바탕으로 댐 높이 8m 이상을 적정 범위로 고려하였다. 준공 경과연수의 경우에는 국민안전처 "재해위험저수지 댐 관리 지침" 타당성 평가기준인 '시설노후도' 기준과 한국시설안전공단 사회간접자본 노후화 기준에 해당하는 경과연수 기준을 토대로 30년 이상을 기준으로 선정하였으며, 우심피해 및 지진피해 잠재지역은 국민안전처 재해연보(2014)를 기준으로 과거 10년 동안의 우심피해 발생 지역과 기상청 국내 지진 규모 10위권 내에 포함되는 지역을 고려 대상으로 하였다. 본 연구에서 도출한 시설물 붕괴 가능성에 대한 판단기준을 국민안전처에서 고시한 EAP 수립 대상에서 제외되는 지자체 재해위험저수지 354개소에 적용해 본 결과, 저위험군 16개소, 중위험군 5개소, 고위험군 2개소로 각각 조사되었다. 저위험군은 전문 시설물 관리자에 의한 주기적인 시설물 점검 및 관찰이 필요할 것으로 사료되며, 중 고위험군에 속하는 시설물의 경우 본 연구의 결과를 바탕으로 시설물 하류지역의 실질적인 인명 및 경제적 피해 가능성에 대한 보다 면밀한 조사를 통해 EAP 수립 대상 포함여부를 결정하여야 할 것으로 판단된다.

  • PDF

Application of High Accuracy Model for Assessing Weir Failure Effect (보 붕괴 영향 평가를 위한 고정확도 해석모형의 적용)

  • Kim, Tae-Hyung;Han, Kun-Yeun;Son, Jae-Kyung;Kwak, Young-Min
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.744-748
    • /
    • 2010
  • 4대강 살리기 사업에 있어 하천 준설 및 다목적 보 설치는 주요하천 상 하류의 일괄적인 준설을 통한 통수단면 확보로 홍수 소통능력을 극대화 하고, 친환경적 보설치를 통해 하도정비 실시이후에도 현재의 갈수위 이상의 수위를 유지하면서 홍수피해저감효과를 극대화하는 것을 목표로 한다. 4대강 사업시 콘크리트 형식으로 건설될 다목적 보는 월류식 구조물이지만 보의 저부에서 발생하는 양압력이나 기타 재하 하중과의 조합으로 인해 전도나 활동을 일으킬 수 있는 가능성을 가질 수 있고, 보의 규모가 커지고 가동보 등의 복합적인 형태를 가질 경우 보의 붕괴는 콘크리트 중력식 댐의 붕괴와 비슷한 양상을 가질 것으로 판단된다. 본 연구에서는 월류 구조물이 붕괴되었을때 상 하류 하천에 미치는 영향을 분석하고자 하였다. 자연하천 내의 보 붕괴 및 그에 따른 수위상승으로 인한 제방 붕괴시 실제 범람원에 안정적으로 적용가능한 고정확도 2차원 홍수범람 모형을 평가하였고, 가상하도 및 실험하도에 대한 적용을 실시하였다.

  • PDF

Slope Stability Analysis and Suggestion of Stabilization Methods on Failed Cut-Slopes Interbedded with Weakness Layer (연약층이 협재된 절개면의 안정성 해석 및 대책)

  • 구호본;이대영;김학준
    • The Journal of Engineering Geology
    • /
    • v.13 no.2
    • /
    • pp.157-170
    • /
    • 2003
  • This study is performed to investigate the cause of slope failure and to suggest suitable stabilization methods for the failed rock slopes. The slope which is located along the national highway between Maesan and Kakok in Dangjin-gun failed during the construction of roads. Site investigation, drilling program, field measurements, rainfall records, and stability analyses are used to investigate the cause of the slope failure. The problem determining the cut-slope angle based on the existing design manual for the construction of roads is reviewed based on the case history given in this paper. If weakness layer and geological structures such as folds and faults are developed in a slope, slope failure is possible even though the direction of slope and the direction of discontinuities depart more than $30^{\circ}$.

A Study on the Stability Analysis and Countermeasure of Tunnel Portal Failure Slope - in Suanbo Hot Springs 1 and 2 Tunnel Failure Site (터널 갱구부 붕괴 사면의 안정성 해석 및 보강공법에 관한 연구 - 수안보 온천 1, 2터널 붕괴 현장을 중심으로)

  • Baek, Yong;Koo, Ho-Bon;Yoo, Ki-Jeong
    • The Journal of Engineering Geology
    • /
    • v.12 no.4
    • /
    • pp.367-378
    • /
    • 2002
  • Recently, the number of tunnels on national roads has been increased due to the trend that construction of the large-scaled cut slopes is limited because of the environmental issues. Therefore, the slope failures of tunnel portal have often occurred. The tunnel portal in use has limitations on selection of the countermeasure and construction against slope failure. In the cases of Suanbo hot springs 1 and 2 tunnel portals, seedding was chosen and constructed as the countermeasureof slope failure when the tunnel was first built but collapsed in April, 2002. In this study, the failure sites were examined accurately through the site investigation and an efficient countermeasure according to stability analysis is presented. It is shown that it is very efficient to use resloping for Suanbo hot springs 1 tunnel and concrete buttress, rock anchor to reinforcement countermeasure, and attached rockfall prevention net by dividing the site into 3 sections for Suanbo hot springs 2 tunnel.

Flood Level Estimation of the Yeongcheon River using Hydraulic Model in July 2006 (수리학적 모형을 이용한 2006년 7월 영천강 홍수위 산정)

  • Chu, Hyun-Jae;Yoon, Kwang-Seok;Song, Jae-Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1282-1286
    • /
    • 2007
  • 우리나라는 매년 여름 발생하는 집중호우로 인해 해마다 많은 인명 및 재산 피해가 발생하고 있다. 집중호우 발생으로 인한 홍수로 인해 홍수범람, 제방붕괴 등이 발생할 경우 그 피해는 실로 막대하다고 할 수 있다. 따라서 피해 발생 이전에 충분한 준비를 통해 집중호우로 인한 피해 방지를 준비해야 한다. 지난 2006년 7월 전국적인 국지적 집중호우로 인해 막대한 피해가 발생했으며, 남강의 지류인 영천강 유역에서도 제방의 월류 붕괴로 인한 제내지 범람 피해가 다수 발생하였다. 본 연구에서는 2006년 7월 태풍 에위니아 내습시 낙동강수계 남강 유역에 발생한 홍수피해 원인을 분석하기 위하여 수리학적 모형을 이용하여 홍수위를 추정하였다. 영천강은 남강 제1지류이며 남강하구에서 63.0 km 지점인 진양군 문산면 소문리에서 남강에 합류되고 있으며 유로연장은 35 km 이다. 수리학적 모형을 통해 홍수위와 같은 기본적인 수리량의 산정 및 분석을 실시하였다. 본 연구를 통한 결과는 영천강 유역의 제방붕괴 원인 및 홍수범람 피해 방지를 위한 대책 수립뿐만 아니라 상류 유역에 대한 1차원 수리학적 모형의 적용과 관련하여 기초적인 자료로 제공할 것으로 기대된다.

  • PDF

A Case Study in a Rainfall induced Failure of Geosynthetics-Reinforced Segmental Retaining Wall (강우로 인한 보강토옹벽의 붕괴사례 연구)

  • Yoo, Chung-Sik;Jung, Hye-Young;Jung, Hyuk-Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.4 no.1
    • /
    • pp.17-25
    • /
    • 2005
  • This paper presents a case history of a geosynthetics-reinforced segmental retaining wall, which collapsed during a sever rainfall immediately after the completion of the wall construction. In an attempt to identify possible causes for the collapse, a comprehensive investigation was carried out including physical and strength tests on the backfill, stability analyses on the as-built design based on the current design approaches, and slope stability analyses with pore pressure consideration. The investigation revealed that the inappropriate as-built design and the bad-quality backfill were mainly responsible for the collapse. This paper describes the site condition including wall design, details of the results of investigation and finally, lessons learned. Practical significance of the findings from this study is also discussed.

  • PDF

A Study on the Collapse Reason by Slope Stability Analysis Considering Construction Stages (시공단계를 고려한 비탈면의 안정성 검토를 통한 비탈면 활동원인 연구)

  • Byun, Yoseph;Jang, Hyeonkil;Jung, Kyoungsik;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.8
    • /
    • pp.25-31
    • /
    • 2011
  • In recent rainy seasons, severe rain storms have caused frequent reinforced retaining wall collapses and slope sliding which have lead to casualties. In this paper, investigating cases of reinforced retaining wall failure, the causes of cracks in reinforced retaining wall and slope sliding have been examined, and a finite element analysis considering the construction phase has been done to analyze the cause and characteristics of slope sliding. As a result, reinforced retaining wall displacement has increased due to heavy rain storms and the increase size has been shown to be large. From these results, it has been analyzed that pile driving can have an effect on the collapse of reinforced retaining walls.

A case Study on Collapse Causes and Restoration of Retaining Wall with Vegetated Concrete Block (식생블록 옹벽의 붕괴원인 및 복구방안에 관한 사례 연구)

  • Hong, Gigwon;You, Seung-Kyong;Yun, Jung-Mann;Park, Jong-Beom;Lee, Kwang-Wu
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.4
    • /
    • pp.105-115
    • /
    • 2016
  • This paper describes a restoration of retaining wall, which was collapsed by rainfall. The failure causes was analyzed by field case, and then the countermeasure was suggested. The failure causes confirmed that observance of design and construction criteria was insufficient. It also was the climate condition like a rainfall and inappropriate construction management. The stability analysis for retaining wall, soil improvement and reinforced earth wall was conducted to confirm validity of the countermeasure. The analysis results showed that the suggested construction method satisfied in required safety factors. Therefore, it should be secured the stability of the structure based on the application of appropriate design method and construction management, when structure was constructed.