Recently, the number of tunnels on national roads has been increased due to the trend that construction of the large-scaled cut slopes is limited because of the environmental issues. Therefore, the slope failures of tunnel portal have often occurred. The tunnel portal in use has limitations on selection of the countermeasure and construction against slope failure. In the cases of Suanbo hot springs 1 and 2 tunnel portals, seedding was chosen and constructed as the countermeasureof slope failure when the tunnel was first built but collapsed in April, 2002. In this study, the failure sites were examined accurately through the site investigation and an efficient countermeasure according to stability analysis is presented. It is shown that it is very efficient to use resloping for Suanbo hot springs 1 tunnel and concrete buttress, rock anchor to reinforcement countermeasure, and attached rockfall prevention net by dividing the site into 3 sections for Suanbo hot springs 2 tunnel.
최근 국도가 4차선 선형 개량화 되는 과정에서 일반국도 내 터널 수가 증대되고 있으며 터널 갱구부의 사면 붕괴도 적지 않게 보고되고 있다. 운용중 터널 갱구부 사면 붕괴는 절토사면과는 달리 시공성 및 대책공법 선정의 한계성을 가지고 있다. 본 연구에서는 2002년 4월 발생한 수안보 온천 1, 2터널붕괴 현장을 대상으로 정밀 현장조사를 실시, 안정성 해석에 따른 효율적인 보강공법에 대해 검토한 것이다. 연구방법으로는 붕괴 현장의 정밀 지질조사를 통하여 붕괴 원인 분석 및 지반강도정수 산정을 위하여 현장 조사 및 붕괴 현장에 대한 역해석을 실시 지반강도정수를 추정하였다. 암반사떤의 안정성 해석을 위하여 불연속면의 영향을 고려하여 평사투영법을 실시하였으며, 안전율을 산정을 위하여 Tarlen을 이용한계평형해석을 실시하였다. 연구결과, 수안보 온천 1터널의 경우, 사면경사완화공법을 2터널의 경우는 3개의 영역으로 구분 콘크리트 버트리스 및 보강공법으로 록앵커 시공, 결착식 낙석방 지망을 설치하는 방안이 제시되었다.