The Effect of Remedial Works to Control the Leakage Problem in Earth Fill Dam by Compaction Grouting (콤팩션 그라우팅에 의한 흙댐의 누수복원 공사효과 분석)

  • Chun, Byung-Sik;Lee, Yong-Jae;Chung, Ha-Ik
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.11
    • /
    • pp.13-23
    • /
    • 2006
  • The sinkhole and leakage in dam core were detected at one of earth fill dams in Korea. The damage areas in the core of the dam were repaired by compaction grouting method. This study is to evaluate compaction grouting activity by in-situ and laboratory experiments before, during and after the remedial work. The intensive site investigation and geophysical survey were conducted during and after the compaction grouting work. The compaction grouting work was carried out for the damaged dam core between June 16 and August 24, 2000. The leakage reduction generally occurred in the core of the dam after the remedial work. The use of compaction grouting was considered the proper countermeasures for repairing the damaged dam. It shows that the loose or voided zones have been properly filled and the leakage has been reduced by about 96% of that before the treatment of the remedial work performed at dam core by compaction grouting.

A Study on the Development of New SRC Lining Board (신형 SRC 복공판의 개발에 관한 연구)

  • Kown Beom-Jun;Park Do-Uk;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.172-180
    • /
    • 2005
  • The purpose of this study is to suggest a new SRC(Steel Ready mixed Concrete) lining board. The research method of this study includes problem analysis of existing lining boards a constant load test and a fatigue test. The results of this study are as follow : 1) the suggested new lining board improves the function and reduce slipperiness than existing lining boards. 2) the strength of the new SRC lining board is analyzed as superior than existing lining boards from the results of constant load test and fatigue test.

Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information (공정-내역정보 연계를 위한 통합건설정보분류체계기반의 공통WBS 활용방안 -도로공사 사례를 중심으로-)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.107-114
    • /
    • 2005
  • The time and cost is the most important information for the construction project management. Currently, a lot of studies have been done in order to clearly relate them with each other, but there have been some difficulties. Because of the characteristic of Korean government contract law, the construction project in Korea is managed by only cost and the time and cost information is distinctly separated. In order to manage all the major construction project information smoothly, the time and cost information should have relation with each other. This study suggest methods for relating the time and cost information, especially for road construction project of MOCT. Through the survey of construction field engineers and case study of the road construction project, several alternatives to improve the usability of construction information are suggested in this study. These alternatives can support relating other construction information.

Deduction of Considerations During Design and Construction by Analysing Domestic and Abroad Case Analysis of Freeform Building Envelope (국내외 비정형 건축물 외피시스템 사례 분석을 통한 설계 및 시공시 고려사항 도출)

  • Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.84-96
    • /
    • 2013
  • Recently, architectural design has been changing from formal design to freeform design due to the digitalization of construction industry. Especially, the formal design has been accepted as a design trend recently and applied many times as a design concept in the architectural design competitions such as turn-key. However, various deflects such as water leak and cracks have been occurred because the traditional construction methods had been applied without any revision or adaptation of the formal construction method for the freeform building construction. Design and construction of freeform building has been developed as an new method in order to solve the problems and minimize the construction duration and cost for the freeform building. Therefore this research deduced the positive implications for developing freefrom envelope by analyzing the domestic and abroad cases and proposed the considerations during design and construction of the freeform envelope as follows. First, the freeform design should consider the constructability for the freeform envelope. Second, manufacturing technology for the two-way curvature of the unit panel should be developed. Third, exposed concrete form method should be developed for the freeform envelope of concrete. Forth, material characteristics, construction method and facility management should be considered in order to manage precipitation and keep water-proof according to the classification of the freeform envelope area.

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Baek, Young-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.695-699
    • /
    • 2009
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

Study on the Structural Safety for the Non-Open excavation method by Using Steel Tubular Roof (대구경 강관을 이용한 비개착공법의 구조적 안전성에 대한 연구)

  • Kim, Kyong-Gon;Kim, Kyeong-Hwan;Kim, Hyo-Jin;Lee, Sang-Ho
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.4
    • /
    • pp.49-57
    • /
    • 2009
  • The development and use of underground space in the city have been expanded considerably worldwide due to the growing population and traffic. Because the construction of underground causes some problems including traffic jam and safety accidents, the non-open excavation construction method are commonly used. NTR (New Tubular Roof) method which is one of the non-open excavation method is investigated in this study. The structural safety of underground structures by using NTR method is evaluated by ANSYS 9.0. The tubular roof according to diameters are analysed by ANSYS 9.0 at critical construction step. Finally, according the diameter and thickness of tubular roof the stress nad dispacement are analyzed and then the The efficient use of tubular roof is suggested from relationship between tubular's thickness and stress condition.

  • PDF

Project of Dam Safety reinforcement on Gampo Dam (감포댐 안전성강화 사업)

  • Cheon, Geun Ho;Han, Yong Hun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.214-214
    • /
    • 2022
  • 감포댐은 2006년 준공하여 각종 시설 및 설비의 노후화가 진행중에 있으며, 최근 감포댐 인근 지역에서 발생한 경주지진(규모 5.8) 및 포항지진(규모 5.4)이 발생하여 지진시 시설물의 안전성에 대해 중요성이 대두되고 있었다. 이에 감포댐 안전성강화 사업을 추진하게 되었고, 주요 사업내용은 취수탑 관리교 내진보강, 댐체 심벽보강을 통한 댐체 안전성확보, 비상방류시설 개선이다. 취수탑 관리교는 교각단면의 변위연성도 및 교량받침에 의한 구조물 안전성 평가를 시행하였고, 단면강도는 모멘트-곡률해석법에서 탄성영역의 단면강도 대비 탄성지진력을 비교하여 안전성을 검토하였다. 검토결과 교량받침의 내진성능은 부족한 것으로 검토되어 유량제어형 멀티펌프와 안전잭을 이용한 변위제어 방식의 교량동시 인상공법이 가능하고 인상정밀도 ±0.5mm이내의 성능을 가진 교량인상공법 적용하여 보강을 하는 것으로 계획하였다. 댐체 심벽보강을 위해 먼저 전기비저항탐사를 수행하여 전기비저항대를 탐사하여 심벽부에서 포화대가 형성된 부위를 조사하였다. 그리고 댐 상·하류에 전극을 설치하고 전류를 발생시켜 측정 지점별 자기장을 측정을 통하여 댐체내 침투에 따른 유로 형성여부 파악을 위한 전자기장탐사를 시행하였다. 마지막으로 심벽 시추조사를 시행하여 공내수를 조사하였다. 조사결과 포화대의 위치 및 이상대가 다양한 것으로 나타났으며, 이는 불특정 지점에 연약대가 존재한다 판단하여 심벽부 보강계획을 전반적으로 적용하는 것으로 결정하였다. 비상방류시설은 최근 15년 실측자료의 홍수기(6~9월) 평균유입량을 적용하여 검토하였으며 검토결과 배제대상 높이 75%까지는 3.7일, 완전배제까지는 11.2일이 걸려 댐설계기준을 충족하는 것으로 검토되다. 다만 감포댐 비상방류시설이 하천제방과 직각방향으로 형성되어 있고, 하천의 폭이 좁아 과거 방류시에도 제방을 월류하는 것으로 조사되어 하천의 세굴을 방지하고 제방 안전성을 확보하기 위하여 비상방류시설에 감세공을 설치하고, 제방에 디플렉터 옹벽을 설치하는 것으로 계획하였다. 감세공은 2번에 걸친 감세효과로 방류시 하류바닥 및 옹벽 보호 효과가 큰 미국 USBR의 TypeVI를 적용하였으며, Flow-3D 모델링을 통하여 제방에 월류가 발생하지 않는 최적의 대안 옹벽규모를 산정하였다.

  • PDF

A Study on the Accuracy Comparison of Object Detection Algorithms for 360° Camera Images for BIM Model Utilization (BIM 모델 활용을 위한 360° 카메라 이미지의 객체 탐지 알고리즘 정확성 비교 연구)

  • Hyun-Chul Joo;Ju-Hyeong Lee;Jong-Won Lim;Jae-Hee Lee;Leen-Seok Kang
    • Land and Housing Review
    • /
    • v.14 no.3
    • /
    • pp.145-155
    • /
    • 2023
  • Recently, with the widespread adoption of Building Information Modeling (BIM) technology in the construction industry, various object detection algorithms have been used to verify errors between 3D models and actual construction elements. Since the characteristics of objects vary depending on the type of construction facility, such as buildings, bridges, and tunnels, appropriate methods for object detection technology need to be employed. Additionally, for object detection, initial object images are required, and to obtain these, various methods, such as drones and smartphones, can be used for image acquisition. The study uses a 360° camera optimized for internal tunnel imaging to capture initial images of the tunnel structures of railway and road facilities. Various object detection methodologies including the YOLO, SSD, and R-CNN algorithms are applied to detect actual objects from the captured images. And the Faster R-CNN algorithm had a higher recognition rate and mAP value than the SSD and YOLO v5 algorithms, and the difference between the minimum and maximum values of the recognition rates was small, showing equal detection ability. Considering the increasing adoption of BIM in current railway and road construction projects, this research highlights the potential utilization of 360° cameras and object detection methodologies for tunnel facility sections, aiming to expand their application in maintenance.

An Experimental Study on the Structural Performance of Lateral Resistance in Steel Elevator Pit (강재엘리베이터 피트 측압저항 구조성능에 관한 실험적 연구)

  • Hong, Seong-Uk;Kim, Tae-Soo;Baek, Ki-Youl
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.3
    • /
    • pp.1-8
    • /
    • 2019
  • Steel elevator pit was developed for the purpose of minimizing the excavation, simplifying the construction of the frame and economical efficiency by improving the problems that occurred in the existing reinforced concrete. It is common to apply conventional RC method through excavation to underground structures such as underground floor collector well and elevator pit. In recent years, the use of steel collector well and steel elevator pits to reduce construction costs by minimizing the materials of steel and concrete has been continuously increasing. The steel elevator pit is an underground structure and then the performance of the welding part and the structure system is important. Specimen with only steel plate and concrete without studs could support the load more than 3 times than the specimen with deck only. Therefore, even if there is no stud, the deck (steel plate) rib is formed and the effect of restraining the steel plate and the concrete during the bending action can be expected. However, since sudden fracture in the elevator pit may occur, stud bolt arrangement is necessary for the composite effect of steel plate and concrete. It is expected that the bending strength can be expected to increase by about 15% or more depending with and without stud bolts.

Analysis of BIM Utilization for On-site Construction Planning in Modular Construction Project (모듈러 건축공사의 현장시공계획수립을 위한 BIM 활용성 분석)

  • Lee, Myung-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.3
    • /
    • pp.263-272
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that have contributed to advancements in the construction industry. However, the utilization of BIM in current modular construction projects is limited; moreover, there are no specific guidelines pertaining the applications of BIM in modular construction projects. Therefore, this study aims to analyze the utilization of BIM for onsite construction planning in modular construction projects. First, a realistic BIM application was selected through literature review and expert interviews. Then, the construction plan of the modular projects was analyzed to classify the BIM application items into five different categories. The utilization of BIM in each category was then analyzed in terms of necessity and efficiency using a questionnaire. Finally, the BIM Utilization Index (BIM UI) was suggested based on the findings of the survey. As a results, the BIM UI for module point details, lifting plan, other installation details, site layout plan, and schedule plan was 0.811, 0.787, 0.770, 0.729, and 0.699, in the descending order of usability. In addition, through the findings of the study and interviews with experts, a case study for implementation of BIM in modular construction plan was conducted. The results of this study can be used as application guidelines for BIM in future modular construction projects.